2020 Capital Design & Construction 2020 CEA Edmonton Area Title of Presentation January 16, 2020 www.leduc.ca Presented by: Kyle van Steenoven, P.Eng. Manager, Capital Projects and Development Insert Title Here Thank you to our


  1. 2020 Capital Design & Construction 2020 CEA Edmonton Area Title of Presentation January 16, 2020 www.leduc.ca Presented by: Kyle van Steenoven, P.Eng. Manager, Capital Projects and Development

  2. Insert Title Here Thank you to our consultants throughout 2019

  3. Insert Title Here City of Leduc Engineering

  4. Insert Title Here Capital Projects and Development • Design and construction of capital projects • Review, inspection and acceptance of new developments • Review, inspection and approval of residential, commercial and industrial lot grading.

  5. Insert Title Here Infrastructure • Condition assessments • Functional, master and multi-jurisdictional planning • Offsite Levy Model Environmental • Environmental policies, initiatives and projects • Curbside cart collection & recycling program

  6. Insert Title Here Overview • Capital Roads Program • Capital Utility Program • Community Development Program • Master Plans • Standalone Projects ‒ Grant MacEwan Blvd. ‒ Drawdown Wells

  7. Insert Title Here Capital Roads Program • This contract is up for renewal in 2020. The two/four year contract was previously awarded to Select Engineering. • The contract will include 2020/2021 design and corresponding 2021/2022 construction management. • This contract has the potential to be extended by 2 years. • This program includes roadway renewal projects including overlays and reconstructions as well as annual laneway rehabilitations.

  8. Insert Title Here Capital Utility Program • This contract is up for renewal in 2020. The two/four year contract was previously awarded to ISL Engineering. • The contract will include 2020/2021 design and corresponding 2021/2022 construction management. • This contract has the ability to be extended up to 2 years. • This program includes any upgrade and repairs required to the City of Leduc’s storm, sanitary and water networks. This includes mainline and lateral liners, spot repairs and replacements.

  9. Insert Title Here Community Development Program • This contract was up for renewal in 2019. The two/four year contract has been awarded to WSP. • The current contract includes 2019/2020 design and corresponding 2020/2021 construction management. • This contract has the ability to be extended for an additional 2 years. • This program includes community driven projects such as park and recreation upgrades, multiway, trail systems, and art installations

  10. Insert Title Here Engineering Master Plans All master plans are on a 5 year update/renewal rotation Water Master Plan Transportation Master Plan • Completion of a new Water Master Plan • Previously completed by Castleglenn Consultants in • Awarded to AECOM in 2019 2018 • Expected to be completed in 2020 • Next update is tentatively scheduled for 2023 (depending on the outcome of the 65 Avenue interchange) Sanitary Master Plan Storm Master Plan • Previously completed by Cole Engineering in 2019 • Creation of the City’s first Storm Water Master Plan • A new Sanitary master plan is to take place in 2024 • RFP expected to take place in Spring of 2020 • Expected to be completed in 2021

  11. Insert Title Here Standalone Projects When a project doesn’t fit within an existing program, is considered unique/complex, involves greenfield construction or is part of offsite levies then it is usually put out as a standalone RFP. Upcoming Standalone Projects: • Grant MacEwan Boulevard • Drawdown Wells

  12. Insert Title Here Grant MacEwan Boulevard • Widening 450 meters of an existing 2 lane arterial roadway to 4 lanes • Converting the RoW cross- section from rural to urban • Design and construction of noise attenuation • Relocation of overhead primary power and streetlights underground • Realignement of the 3 meter multiway

  13. Insert Title Here Drawdown Wells 2020: Design and construction management for the installation of 2 Drawdown wells within Elks Park to remove chlorine leachated groundwater. 2021: Design and construction management for the installation of 2 Drawdown wells within Lede Park to remove saline leachated groundwater.

  14. Insert Title Here All RFP’s listed above will be posted on APC For any questions and inquires please contact: Kyle van Steenoven Manager, Capital Projects and Developments (780) 980-8415 kvansteenoven@leduc.ca

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.