industrial lot grading.
planning
projects
program
‒ Grant MacEwan Blvd. ‒ Drawdown Wells
year contract was previously awarded to Select Engineering.
corresponding 2021/2022 construction management.
2 years.
including overlays and reconstructions as well as annual laneway rehabilitations.
year contract was previously awarded to ISL Engineering.
corresponding 2021/2022 construction management.
2 years.
required to the City of Leduc’s storm, sanitary and water
repairs and replacements.
two/four year contract has been awarded to WSP.
design and corresponding 2020/2021 construction management.
extended for an additional 2 years.
projects such as park and recreation upgrades, multiway, trail systems, and art installations
Water Master Plan
Storm Master Plan
Transportation Master Plan
2018
(depending on the outcome of the 65 Avenue interchange)
Sanitary Master Plan
All master plans are on a 5 year update/renewal rotation
When a project doesn’t fit within an existing program, is considered unique/complex, involves greenfield construction or is part of
standalone RFP. Upcoming Standalone Projects:
existing 2 lane arterial roadway to 4 lanes
section from rural to urban
noise attenuation
primary power and streetlights underground
multiway
2020: Design and construction management for the installation of 2 Drawdown wells within Elks Park to remove chlorine leachated groundwater. 2021: Design and construction management for the installation of 2 Drawdown wells within Lede Park to remove saline leachated groundwater.
All RFP’s listed above will be posted on APC