Construction of Drumlins Turbines During planning visual impact is anticipated Foundation 9mx9m x3m crane pad 20mx25m Foundation steel reinforcements ready on site Reinforcement in place The steel reinforced concrete needs 2 months curing
SLIDE 2
SLIDE 3
SLIDE 4
SLIDE 5
Foundation 9mx9m x3m crane pad 20mx25m
SLIDE 6
Foundation steel reinforcements ready on site
SLIDE 7
Reinforcement in place
SLIDE 8
The steel reinforced concrete needs 2 months “curing” time
SLIDE 9
Contractors and some Drumlin directors inspect the site
SLIDE 10
The nacelle (the “box” at the top for the electricity generator ) and other parts ready on site
SLIDE 11
The tower sections and blades ready on site
SLIDE 12
Ready to put it all together
SLIDE 13
2 cranes are
needed
When everything is ready it may
- nly take 1 or2
days to erect the turbine
SLIDE 14
Ballyrobert turbine completed
SLIDE 15
The turbines are sited on working farms