1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) Presented By: Calvin, Giordano & Associates, Inc. RFP No. V2114585P1 Firm


slide-1
SLIDE 1

1

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

slide-2
SLIDE 2

2

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

FirmOverview

  • We are a wellestablished multidisciplinary firm that has been located in South

Florida for 80 years.

  • Since 1937, the company has grown from a small, twoperson surveying firm to over

350 employees, providing over 25+ Municipal Services.

  • The Construction Engineering & Inspection Division (CEI) was launched in 2002.

Municipal/AgencyExperience(notlimitedto):

BrowardCounty FDOT(District1,4,6&7) FDEP SeminoleTribeofFlorida PalmBeachCounty MiamiDadeCounty WestPalmBeach LakeWorth Lantana RivieraBeach DelrayBeach BocaRaton PompanoBeach OaklandPark PembrokePines CoralSprings DaniaBeach Hollywood MiamiGardens Tamarac WestPark Weston NorthLauderdale Lauderhill SunnyIsles Surfside Parkland Weston

slide-3
SLIDE 3

3

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

Scope

Construction Engineering and Inspection professional services (CEI) and technical support services related to Improvements / construction of Countywide Transit Bus Stop Infrastructure. The project is Federal Transit Administration Funded. Also, part of the contract includes:

  • ContractAdministration,
  • UtilityCoordination,
  • MaterialVerificationTesting

Compliancewith:

  • ContractPlansandSpecifications
  • BrowardCountyTransit
  • FTARequirements
  • FDOTguidelines
  • FloridaBuildingCode(FBC)Standards

ProjectSchedule(TimeforPerformance): The work to be performed under this scope and underlying Agreement for CEI services shall be completed within 730 calendar days with an optional 365 calendar days from the issuance of the Notice to Proceed.

slide-4
SLIDE 4

4

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

OrganizationalChart

slide-5
SLIDE 5

5

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

SpecificWorkExperience

FDOTDistrict4GeneralAssignedContact;BrowardCountyTransportation/Serviceand CapitalPlanning;ADAImprovements&ShelterInstallationsatBusStops:

ADAupgradestosidewalks NewBusShelters SiteFurnishings BikeRacks Signage ElectricalUnderground

Wiring&Components

SolarPowerSupplies Remove/Replace

DamagedConcreteSlabs

RelocationofExisting

Landscaping

RelocationofExisting

Irrigation

slide-6
SLIDE 6

6

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

SpecificWorkExperience

ProjectsthatincludedBusShelter/Stopupgrades:

  • City of Pompano Beach; MLK (Hammondville Road) Improvements (from Powerline Road to Turnpike) Project FM # 43286115801

(LAP Funded $ 2,855,802): Improvements include roadway widening, updated bus stops, sidewalk installation, drainage improvements, milling and resurfacing, Bus shelter/Pads, lighting, median installation, signage, landscaping, irrigation and pavement markings.

  • City of Pompano Beach; SW 36th Avenue Sidewalk Project (from West McNab Road to West Palm Aire Drive); Project FM # 431715

15801 (LAP Funded $628,755.50):The project scope includes the installation of a sidewalk along the west side of SW 36th Avenue commencing on the south end of Canal “A” north to Palm Aire Drive, a pedestrian flashing beacon crosswalk at the intersection of SW 36th Avenue and Gateway Drive, Bus Pads, storm drainage construction, demolition, utility work, and permanent signage & striping.

  • City of West Palm Beach; Quadrille Blvd (Okeechobee to Datura); Project FM # 42526015802 (LAP Funded $750,000): The

improvements included but were not limited to clearing and grubbing, bus stop concrete pad improvements, pedestrian sidewalk improvements, pavement markings and signage, Bus shelter/Pads, site lighting, irrigation, signing and pavement markings, landscaping and other miscellaneous improvements.

  • City of West Palm Beach; Clematis Street Improvements; LAP Project FM # 42765215801 (LAP Funded $446,595): The Clematis

Street project included pedestrian and landscape enhancements such as construction of a landscaped median and installation of additional landscaping, tree grates, benches, bike racks, trash receptacles, sidewalk, milling and resurfacing, striping, signing and irrigation system from Sapodilla Avenue to Tamarind Avenue.

slide-7
SLIDE 7

7

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

SpecificWorkExperience

ProjectsthatincludedBusShelter/Stopupgrades (Con’t):

  • BrowardCountyWideBusShelters Construction
  • WPBDowntownTrolleyShelters
  • CityofHallandaleBusSheltersDesignand

Construction

  • CityofPalmBeachGardensBusShelters
  • ClevelandClinicBusShelters Designand

Construction

slide-8
SLIDE 8

8

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

LessonsLearnedFromPreviousJobinBrowardCounty

  • General Construction: Expedite the review of Shop drawings, check

the pad thickness and shelter type in advance, check the reinforced mat for the bus pad to verify clearances, verify buy America certifications, ensure materials used are from approved sources including the concrete mixes, & check the base prior to pad placement.

  • Ensuring ADA requirements are met: 2% slopes, wide pads for wheel

chair maneuvers, and drop off protection.

  • Maintenance of Traffic: Review MOT daily, maintain pedestrian

access, and maintaining bus service during construction.

  • PIO: Notify businesses and residents in advance using flayers/face to

face meetings, ensure proper access is maintained, respond to complaints within 24 hours to avoid issue escalation.

slide-9
SLIDE 9

9

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

LessonsLearnedFromPreviousJobinBrowardCounty

  • ROW Issues: Ensure all work is performed within the ROW,

ROW shall be staked prior to construction, cutting and capping irrigation and minimizing damages to landscape owned by private owners.

  • Utilities: Review shelter locations for solar power panels,

survey overhead utilities, & use low profile equipment when needed.

  • Coordination: Coordination with County PM, local cities, and

FDOT for permits if needed.

slide-10
SLIDE 10

10

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

OtherTechnologiesUsed

TheCGATeamwillusethefollowingtechnologiesonthisproject:

  • GPS
  • TalentGuard (CertificationTrackingSoftware)
  • GoProCams
  • DigitalSignatures
  • SocialMedia
  • Facebook
  • Twitter
  • Ajera
  • Resource management and project scheduling are

critical tasks for keeping utilization high and forecasting future staffing requirements.

  • Ajera's project scheduling tool, Schedule Manager,

provides an easy to use solution for managing your employees and project workloads on a weekly basis.

  • You can easily view your projects and resource budgets

and instantly see how they are affected as you schedule future work.

slide-11
SLIDE 11

11

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

WhyCGA?

  • Specific Similar Project Experience.
  • 100% Availability of Experienced Field Staff

with Experience Working on Bus Shelter projects in Broward County (No Bait and Switch… Julio is your guy).

  • Ability

to Manage Manpower to Cover Spreadout Work Areas.

  • Support of 350 Professionals in South Florida.
  • We Are Committed to Delivering This Project

Under Time and Budget.

slide-12
SLIDE 12

12

PresentedBy:Calvin,Giordano&Associates,Inc.

RFPNo.V2114585P1

Questions/Comments