COMPANY INFORMATION Established : 1991 No. of employees : 300+ Total number of Machines: 200+ Number of Cells: 25 Certification : ISO/TS 16949 Turnover : 255 Cr Our Customers Top management drive In 2016, Top management drive to


slide-1
SLIDE 1
slide-2
SLIDE 2

COMPANY INFORMATION

Established : 1991

  • No. of employees : 300+

Certification : ISO/TS 16949 Turnover : 255 Cr Total number of Machines: 200+ Number of Cells: 25

slide-3
SLIDE 3

Our Customers

slide-4
SLIDE 4

Top management drive

In 2016, Top management drive to implement TPM- Trak OEE monitoring solution, now being called as Industry 4.0 and digitization initiatives in our newly built state of the art factory at Pune to improve the efficiency of equipments

slide-5
SLIDE 5

1st Month of Installation -22 Machines

slide-6
SLIDE 6

For the Time period 1st-Jan-2016 to 31st –Jan-2016 For the Time period 1st-Mar-2016 to 31st –Mar-2016

slide-7
SLIDE 7

Top 5 Reasons identified

Break down: it is observed that most of the break downs occurred due to poor autonomous maintenance, improper training to operators

New settings: Setting time was taking more due to improper planning

Tool/Wheel change: Tool and wheel changing was taking more time

No operator: working on other machines/absent

Machining Time increase: causing less productivity

slide-8
SLIDE 8

Countermeasures

Break down: Developed strong autonomous maintenance schedules and trained operators and maintenance departments and keeping critical spare part in stock

New settings: Setting time is reduced with SMED

  • concept. Reduced by

Tool/Wheel change: Provided proper training to

  • perators, implementing tool life monitoring

methods and proper planning of tools

No operator: By making them understanding the importance of delivery schedules and by developing customer centric culture

Machining Time increase: identified and avoided minor stoppages occurring in between cycles, by locking original part program and speed, feeds and by educating the operators

slide-9
SLIDE 9

Data Analysis

Rij Engineering deployed TPM-Trak OEE monitoring on 21 machines – Phase 1

Rij Engineering decided to work on improving efficiency of the equipments Machine hour rate

For CNC INR 255

For Shaping Machines INR 1,000

For Leibherr Gear cutting machines INR 3,000 Observations from 1st month out come

Identified top 10 low performing machines – 3,291 hr

Which means 137 days

Down time loss – INR 29,08,528 After optimizing the down time over Three months period

Down time reduced to 1,784 hrs (74 days)

Down time loss – INR 15,97,601

Losses avoided : INR 13,10,927

slide-10
SLIDE 10

Asset utilization increase over Three Months Period on 10 machines

Machines Increase Asset Utilization (in Hrs) Increase Asset Utilization (in INR) CNC Machines 1039 2,64,957 CNC Shaping Machines 182 1,82,930 Leibherr Gear Cutting Machines 287 8,63,040 Total Hours saved & Profit

1508 13,10,927

1st Year increased profit on 22 machines – INR 158 Lakh ROI > 200%