COMMUNITY VISIONING WORKSHOP NO .1 INTRODUCTION COMMUNITY FEEDBACK - - PowerPoint PPT Presentation

community visioning workshop no 1
SMART_READER_LITE
LIVE PREVIEW

COMMUNITY VISIONING WORKSHOP NO .1 INTRODUCTION COMMUNITY FEEDBACK - - PowerPoint PPT Presentation

MAY 9, 2018 COMMUNITY VISIONING WORKSHOP NO .1 INTRODUCTION COMMUNITY FEEDBACK INITIAL ANALYSIS EXERCISE NEXT STEPS ARENA DISTRICT MASTER PLAN - DRAFT TODAYS MEETING 001 002 003 004 005 001 | INTRODUCTION MKSK COLUMBUS ARENA


slide-1
SLIDE 1

MAY 9, 2018

COMMUNITY VISIONING WORKSHOP NO .1

slide-2
SLIDE 2

INTRODUCTION COMMUNITY FEEDBACK INITIAL ANALYSIS EXERCISE NEXT STEPS

002 001 003 004 005

ARENA DISTRICT MASTER PLAN - DRAFT

TODAY’S MEETING

slide-3
SLIDE 3

001 | INTRODUCTION

slide-4
SLIDE 4

MKSK

PROJECT LEAD District Planning & Urban Design

HR+A

Economic Development & Market Feasibility

KOLAR

Identity, Placemaking, Signage & Wayfjnding

WALLACE

Civil Engineering

COLUMBUS ARCHITECTURAL STUDIO

Architecture/Adaptive Reuse

GROUNDSWELL

Activation & Pop up Engagement

ZAKERION

Public Relations

ARENA DISTRICT MASTER PLAN - DRAFT

ABOUT US | PROJECT TEAM

slide-5
SLIDE 5

Task 1 | Initiate & EVALUATE

FEBRUARY - APRIL

Task 2 | engage

MARCH - MAY

Task 3 | understand

MARCH - JUNE

Task 4 | explore

MAY - AUGUST

Task 5 | consent

JUNE - SEPTEMBER KICK-OFF MEETING STAKEHOLDER MEETINGS STEERING COMMITTEE MEETING #2 STEERING COMMITTEE MEETING #1 STEERING COMMITTEE MEETING #3 STEERING COMMITTEE MEETING #5 STEERING COMMITTEE MEETING #4

WE ARE HERE

COMMUNITY VISIONING WORKSHOP #1

COMMUNITY WORKSHOP #2 COMMUNITY REVIEW OPEN HOUSE #3

ADOPTION

FINAL PLAN

Data Collection Arena District Tour/Audit Website Launch Task 2 Progress Report Preliminary Concepts & Strategies Economic, Land Use, Connections & Brand analyses Design Alternatives & Costs Implementation Funding Phasing Costs Preferred Concepts Review & Approval

ARENA DISTRICT MASTER PLAN - DRAFT

Schedule | overall project schedule

slide-6
SLIDE 6

STUDY AREA

30 Blocks ±165 Acres

NORTH

slide-7
SLIDE 7

It is imperative that the master plan provide actionable guidance on every project it touches, and a clear path forward in developing the district based upon its key assets. It should provide direction to:

  • Strengthen connectivity, both within the district and

to neighboring downtown districts;

  • Develop a greater sense of place through unique

development and branding; and

  • Facilitate growth opportunities that

complement greater downtown Tulsa’s existing economy while serving the unique clients of the arena and convention center.

ARENA DISTRICT MASTER PLAN - DRAFT

PLAN PURPOSE

slide-8
SLIDE 8

PLANNING PRINCIPLES

1 | Broaden and strengthen the District’s role in the Tulsa economy by identifying strategies to promote and foster redevelopment and growth

slide-9
SLIDE 9

PLANNING PRINCIPLES

2 | Shrink perceived and real distances between the District and its downtown and riverfront neighborhoods

slide-10
SLIDE 10

U.S. Bank Stadium (Minneapolis, Minnesota)

PLANNING PRINCIPLES

3 | Reposition the District from a limited-use area into a thriving destination reflecting Tulsa’s cultural and historical livelihood

slide-11
SLIDE 11

PLANNING PRINCIPLES

4 | Uncover a distinct District brand by telling a bold story through dynamic public art, landmarks, messaging and placemaking

slide-12
SLIDE 12

Nationwide Arena District (Columbus, Ohio)

PLANNING PRINCIPLES

5 | Create an actionable plan to guide public and private sector investment and leads to “early wins”

slide-13
SLIDE 13

002 | community feedback

slide-14
SLIDE 14

GET YOUR SMART PHONES OUT!

STEP 1: ON YOUR BROWSER, GO TO WWW.MENTI.COM STEP 2: ENTER THE CODE 82 75 11 STEP 3: TYPE IN YOUR ANSWER STEP 4: CLICK ON “SUBMIT”

ARENA DISTRICT MASTER PLAN - DRAFT

tell us what you think!

slide-15
SLIDE 15

INSTANT POLLING RESULTS FROM WORKSHOP PARTICIPANTS (56 RESPONSES)

ARENA DISTRICT MASTER PLAN - DRAFT

HOW OFTEN YOU VISIT THE ARENA DISTRICT

slide-16
SLIDE 16

INSTANT POLLING RESULTS FROM WORKSHOP PARTICIPANTS (99 RESPONSES)

ARENA DISTRICT MASTER PLAN - DRAFT

3 things you like about the district

slide-17
SLIDE 17

INSTANT POLLING RESULTS FROM WORKSHOP PARTICIPANTS (71 RESPONSES)

ARENA DISTRICT MASTER PLAN - DRAFT

3 things you would like to see changed/improved

slide-18
SLIDE 18

VISIT OUR PROJECT WEBSITE FOR MORE INFORMATION ABOUT OUR PROJECT, THE PROJECT TEAM, UPCOMING EVENTS, AND OPPORTUNITIES TO PROVIDE COMMENTS.

  • All of tonight’s materials, including this presentation and
  • ur boards, will be posted online under “Project Library”
  • Click on “Participate” to sign up for our email list and stay

up to date on future events

  • Follow Vision Tulsa and City of Tulsa on Facebook for

updates on the plan and upcoming events

  • Visit FeedbackTulsa.com to answer a few

questions and see what other members of the community think about the Arena District

ARENA DISTRICT MASTER PLAN - DRAFT

HOW TO STAY IN TOUCH

CityofTulsa.org/ArenaDistrict

slide-19
SLIDE 19

003 | INITIAL ANALYSIS

slide-20
SLIDE 20

2017 - Cox Convention and Business Center Plans 2017 - Downtown Walkability Analysis 2016 - Tulsa Comprehensive Plan (PLANiTULSA) 2016 - Downtown Area Master Plan Progress Report 2016 - City of Tulsa A Guide to Small Area Planning 2016 - Destination Tulsa 2025 Development Strategy (Resonance Report) 2016 - Tulsa’s Future III 2015 - The Tulsa Region Bicycle and Pedestrian Master Plan (Go Plan) 2014 - The Quality of Life Report 2013 - Complete Streets Procedural Manual 2011 - City of Tulsa Downtown Streetscape Master Plan 2010 - Downtown Area Master Plan Varies - Arena District Plans C C C C C C P P C C C

IN CH C - City CH - Chamber IN - INCOG P - Private

ARENA DISTRICT MASTER PLAN - DRAFT

PLANS REVIEWED

slide-21
SLIDE 21

surrounding neighborhoods & districts

NORTH

slide-22
SLIDE 22

Hospitality & destinations

Destination

± 1.8M Visitors/Yr

BOK, CBC, & Library Hotel

± 1,770 Rooms

NORTH

slide-23
SLIDE 23

Parking

Structured Parking Parking Lot Underground Structured Parking On-Street Parking

±2,803 Surface Spaces ±383 On-Street Spaces ±-- Structured Spaces (in progress) ±-- Total Spaces

NORTH

slide-24
SLIDE 24

block size & Walkability

Superblock Walkable Street

NORTH

slide-25
SLIDE 25

Walk shed

Superblock Walkable Street Destination Hotel Restaurant Cluster

NORTH

slide-26
SLIDE 26

REGIONAL bike SYSTEMS

Proposed Bike Lane (IDL Capital Improvements) Bike Lane Bikeway (Streets with sharrows) Multi-Use Trail

NORTH

slide-27
SLIDE 27

TRANSIT

Bus Line Bus Stop Peoria BRT Line Peoria BRT Stop

NORTH

slide-28
SLIDE 28

Green|Plaza SPACE

Private Public

3.5% of study area is green|plaza space

(public and private)

NORTH

slide-29
SLIDE 29

Green|Plaza SPACE

NORTH

slide-30
SLIDE 30
  • Isolated convention center
  • Civic/Federal uses are diffjcult to relocate
  • Large swaths of surface parking, esp. between downtown core
  • Lack of street facing storefronts & activity
  • Superblock street grid pattern
  • Lack of inviting walkable neighborhood/district

connections

  • Unwelcoming streets/lack of “complete streets”
  • Poor connection to riverfront and regional trails
  • Lack of activated park/plaza spaces
  • Absence of retail/restaurants

ARENA DISTRICT MASTER PLAN - DRAFT

CHALLENGES

slide-31
SLIDE 31

ARENA DISTRICT MASTER PLAN - DRAFT

CASE STUDY | NATIONWIDE ARENA DISTRICT (COLUMBUS, OH)

slide-32
SLIDE 32

Tulsa Columbus, OH

670

315

244 244

75 75

TULSA ARTS DISTRICT SHORT NORTH ARTS DISTRICT COX BUSINESS CENTER TULSA CBD COLUMBUS CBD COLUMBUS CONVENTION CENTER ARENA DISTRICT NATIONWIDE ARENA DISTRICT ARENA DISTRICT MASTER PLAN - DRAFT

TWO ARENA DISTRICTS

slide-33
SLIDE 33

Tulsa Columbus, OH

670

315

244 244

75 75

BOK CENTER NATIONWIDE ARENA ARENA DISTRICT MASTER PLAN - DRAFT

THRIVING ARENAS

slide-34
SLIDE 34

Tulsa - BOK Center Columbus, OH - Nationwide Arena

ARENA DISTRICT MASTER PLAN - DRAFT

THRIVING ARENAS

slide-35
SLIDE 35

ARENA DISTRICT MASTER PLAN - DRAFT

nationwide arena

slide-36
SLIDE 36

Tulsa Columbus, OH

670

315

244 244

75 75

CIVIC/STATE/FEDERAL USES DEMOLITION OF OHIO PENITENTIARY CAMPUS ARENA DISTRICT MASTER PLAN - DRAFT

“UNMOVABLE” USES/BUILDINGS

slide-37
SLIDE 37

Tulsa - Belcher Building Columbus, OH - Ohio Penitentiary (1955)

ARENA DISTRICT MASTER PLAN - DRAFT

“UNMOVABLE” USES/BUILDINGS

slide-38
SLIDE 38

ARENA DISTRICT MASTER PLAN - DRAFT

arena district looking north

slide-39
SLIDE 39

Tulsa Columbus, OH

670

315

244 244

75 75

INTERSTATE 670 670 CAP NEIL AVE. CROSSING INTERSTATE 244 HWY 75 RAILROAD RAILROAD TULSA ARTS DISTRICT SHORT NORTH ARTS DISTRICT ARENA DISTRICT MASTER PLAN - DRAFT

OBSTACLES TO NEIGHBORHOOD CONNECTIVITY

slide-40
SLIDE 40

Tulsa - Poor Connections Columbus, OH - I-670 (Before)

ARENA DISTRICT MASTER PLAN - DRAFT

OBSTACLES TO NEIGHBORHOOD CONNECTIVITY

slide-41
SLIDE 41

ARENA DISTRICT MASTER PLAN - DRAFT

Cap over i-670

slide-42
SLIDE 42

ARENA DISTRICT MASTER PLAN - DRAFT

pedestrian connections

slide-43
SLIDE 43

Tulsa Columbus, OH

670

315

244 244

75 75

LACKING CLEAR CONNECTION SCIOTO GREENWAYS NORTHBANK PARK RESTORED RIVER CONNECTION ARENA DISTRICT MASTER PLAN - DRAFT

connection to river

slide-44
SLIDE 44

Tulsa - Lacking clear connection Columbus, OH - Northbank Park (Before)

ARENA DISTRICT MASTER PLAN - DRAFT

connection to river

slide-45
SLIDE 45

ARENA DISTRICT MASTER PLAN - DRAFT

NORTHBANK PARK

slide-46
SLIDE 46

Tulsa Columbus, OH

670

315

244 244

75 75

COX CONVENTION CENTER COLUMBUS CONVENTION CENTER IMPROVED HIGH STREET CONNECTION LACK OF WALKALBLE CONNECTIONS ARENA DISTRICT MASTER PLAN - DRAFT

DISCONNECTED CONVENTION CENTERS

slide-47
SLIDE 47

Tulsa - Lacking walkable connections Columbus, OH - High Street (Before)

ARENA DISTRICT MASTER PLAN - DRAFT

DISCONNECTED CONVENTION CENTERS

slide-48
SLIDE 48

ARENA DISTRICT MASTER PLAN - DRAFT

improved connection to CONVENTION CENTER

slide-49
SLIDE 49

ARENA DISTRICT MASTER PLAN - DRAFT

improved connection to CONVENTION CENTER

slide-50
SLIDE 50

Tulsa Columbus, OH

670

315

244 244

75 75

PHASED INFILL DEVELOPMENT LARGE SWATHS OF SURFACE PARKING ARENA DISTRICT MASTER PLAN - DRAFT

SURFACE PARKING

slide-51
SLIDE 51

ARENA DISTRICT MASTER PLAN - DRAFT

infill mixed-use development

slide-52
SLIDE 52

ARENA DISTRICT MASTER PLAN - DRAFT

infill mixed-use development

slide-53
SLIDE 53

Tulsa Columbus, OH

670

315

244 244

75 75

LACK OF OPEN SPACE FRAME DEVELOPMENT AROUND OPEN SPACES ARENA DISTRICT MASTER PLAN - DRAFT

lack of open space

slide-54
SLIDE 54

ARENA DISTRICT MASTER PLAN - DRAFT

lack of open spaces

slide-55
SLIDE 55

ARENA DISTRICT MASTER PLAN - DRAFT

MCFERSON COMMONS

slide-56
SLIDE 56

Tulsa Columbus, OH

670

315

244 244

75 75

5TH STREET PLAZA LUDLOW ALLEY ARENA DISTRICT MASTER PLAN - DRAFT

PEDESTRIAN CONNECTION

slide-57
SLIDE 57

ARENA DISTRICT MASTER PLAN - DRAFT

5th street plaza

slide-58
SLIDE 58

ARENA DISTRICT MASTER PLAN - DRAFT

LUDLOW ALLEY

slide-59
SLIDE 59

1,690 ROOMS 3,000 ROOMS

Tulsa Columbus, OH

670

315

244 244

75 75

DOUBLE TREE BEST WESTERN ALOFT HOLIDAY INN COURTYARD COURTYARD CROWNE PLAZA THE LOFTS DRURY INN RED ROOF INN PLUS HYATT HYATT HILTON HAMPTON INN LE MÉRIDIEN HAMPTON THE MAYO FAIRFIELD INN ARENA DISTRICT MASTER PLAN - DRAFT

HOSPITALITY

slide-60
SLIDE 60

Tulsa Columbus, OH

ARENA DISTRICT MASTER PLAN - DRAFT

HOSPITALITY

slide-61
SLIDE 61

REGIONAL DESTINATION RESTAURANTS PARK-SIDE RESIDENTIAL MIXED-USE OFFICE

ARENA DISTRICT MASTER PLAN - DRAFT

RESULT: A VIBRANT NEIGHBORHOOD

slide-62
SLIDE 62

004 | exercise

slide-63
SLIDE 63

STEP 1: COUNT OFF INTO TABLES (7-10 PER TABLE) STEP 2: GET TO KNOW ONE ANOTHER STEP 3: ASSIGN A TABLE SPOKESPERSON/NOTE TAKER STEP 4: USING THE MAPS AND DOTS, SHOW US... STRENGTHS: WHAT IS WORKING WELL? (15 minutes) WEAKNESSES: WHAT IS NOT WORKING WELL? (15 minutes) PRIORITIES: WHERE SHOULD WE FOCUS? (15 minutes) STEP 5: REPORT OUT TO THE FULL GROUP

ARENA DISTRICT MASTER PLAN - DRAFT

dot-mocracy | tonight’s exercise

slide-64
SLIDE 64

1 | STRENGTHS: WHAT IS WORKING WELL?

PLEASE TAKE 15 MINUTES FOR THIS QUESTION

slide-65
SLIDE 65

2 | WEAKNESSES: WHAT IS NOT WORKING WELL?

PLEASE TAKE 15 MINUTES FOR THIS QUESTION

slide-66
SLIDE 66

3 | PRIORITIES: WHERE SHOULD WE FOCUS?

PLEASE TAKE 15 MINUTES FOR THIS QUESTION

slide-67
SLIDE 67

REPORT OUT | SHARE WITH THE GROUP

slide-68
SLIDE 68

005 | NEXT STEPS

slide-69
SLIDE 69

Consultant Team synthesizes input & continues detailed analysis Second Public Workshop: Date & Location TBD

May - JUNE AUGUST

ARENA DISTRICT MASTER PLAN - DRAFT

NEXT STEPS

slide-70
SLIDE 70

thank you!

CityofTulsa.org/ArenaDistrict

Please visit our website