Lubber Run Community Center Community Meeting #1 oculus Lubber Run - - PowerPoint PPT Presentation

lubber run community center
SMART_READER_LITE
LIVE PREVIEW

Lubber Run Community Center Community Meeting #1 oculus Lubber Run - - PowerPoint PPT Presentation

Lubber Run Community Center Community Meeting #1 oculus Lubber Run Community Center 300 N Park Dr Arlington, VA 22203 Early Visioning Highlights Highlights from community visioning session and survey: Preserve and maximize green space


slide-1
SLIDE 1

Lubber Run Community Center

Community Meeting #1

  • culus
slide-2
SLIDE 2

300 N Park Dr Arlington, VA 22203 Lubber Run Community Center

slide-3
SLIDE 3

Early Visioning Highlights

Highlights from community visioning session and survey:

  • Preserve and maximize green space
  • Improve site access and safety
  • Integrate the building into the park
  • Improve outdoor courts and playground
  • Include:
  • Outdoor multi-purpose athletic courts
  • Exercise rooms/fitness
  • Gymnasium
  • Multi-purpose flexible use spaces Lubber Run Visioning Session
slide-4
SLIDE 4

2016 - Summer and Fall Highlights

County Board adopted CIP in July with guidance on Lubber Run:

  • Build up to four stories along with underground parking to enable more green space
  • Include gym, relocate senior program from Culpepper Garden, continue DPR

preschool

  • Consolidate DPR staff at Lubber Run and 3700 S Four Mile Run in new center
  • Office use remain subservient to the community center in form and function of the
  • verall facility

Bond passed November with $46.5M in new bonds for design and construction for replacement of the Lubber Run Center

slide-5
SLIDE 5

6:30 Welcome Gymnasium

Jane Rudolph

6:35 Introduction and Project TimelineGymnasium

Joe Celentano and June Locker

6:50 Goals for Tonight Gymnasium

Wyck Knox

7:00 Group A Gymnasium

Team Leaders

Group B Cafeteria Group C Library 7:25 Group C Gymnasium

Team Leaders

Group A Cafeteria Group B Library 7:50 Group B Gymnasium

Team Leaders

Group C Cafeteria Group A Library 8:15 Share Findings / Q&A Gymnasium

Team Leaders

8:50 Wrap Up and Look Ahead Gymnasium

Joe Celentano and Laura Lazour

Agenda

slide-6
SLIDE 6

Project Components

  • Construction Manager at Risk (CMAR) Delivery Model:
  • Contract for construction management services
  • Pre-construction phase, the CMAR serves as a consultant to the County, providing assistance

in estimating, value analysis, scheduling and constructability.

  • Guaranteed Maximum Price (GMP) after taking competitive bids from the trade

subcontractors that will build the project.

  • Sustainable design principles/Net Zero
  • Studies – Traffic, Tree Canopy, Geotechnical
slide-7
SLIDE 7

Project Team Members

slide-8
SLIDE 8

CMAR Projects

slide-9
SLIDE 9

Full Range of Experience

Community Meeting Room Teaching Kitchen Gymnasium Fitness Area Collaboration Space Locker Room

slide-10
SLIDE 10

Brooks Family YMCA, Charlottesville

slide-11
SLIDE 11

Discovery Elementary School, Arlington

slide-12
SLIDE 12

Thomas Jefferson Middle School, Arlington

slide-13
SLIDE 13
slide-14
SLIDE 14

6:30 Welcome Gymnasium

Jane Rudolph

6:35 Introduction and Project TimelineGymnasium

Joe Celentano and June Locker

6:50 Goals for Tonight Gymnasium

Wyck Knox

7:00 Group A Gymnasium

Team Leaders

Group B Cafeteria Group C Library 7:25 Group C Gymnasium

Team Leaders

Group A Cafeteria Group B Library 7:50 Group B Gymnasium

Team Leaders

Group C Cafeteria Group A Library 8:15 Share Findings / Q&A Gymnasium

Team Leaders

8:50 Wrap Up and Look Ahead Gymnasium

Joe Celentano and Laura Lazour

Agenda

slide-15
SLIDE 15

Goals for Tonight

Listen and Gather Input No wrong answers or questions All Ideas are Welcome Activity Logistics

  • (3) Activities in (3) Locations (Gym, Cafeteria, Library)
  • Divide into (3) Groups (Group A, Group B, Group C)
  • 30 minutes per Activity
  • Groups Rotate through each Activity

HAVE FUN!

slide-16
SLIDE 16

Activities & Location (GYM) Mine community’s vision and knowledge of the site. Think about the qualities of the site (nature, neighborhood, quiet, busy, light, etc) and place colored tags on the site board and discuss your choices with team leaders. Qualities of Spaces (CAFETERIA) Uncover community desires, expectations, fears for the project as they relate to individual spaces. Look through the pictures on the posters and write what you like on green post-it and what you don’t like on red post-it and stick it on the picture. Keep/Toss/Create (LIBRARY) Open discussion about what you like about the current site, what you don’t like, and what is missing. This can include physical, programmatic, and conceptual aspect (e.g. fitness, preschool, connection with nature).

Activities

slide-17
SLIDE 17

6:30 Welcome Gymnasium

Jane Rudolph

6:35 Introduction and Project TimelineGymnasium

Joe Celentano and June Locker

6:50 Goals for Tonight Gymnasium

Wyck Knox

7:00 Group A Gymnasium

Team Leaders

Group B Cafeteria Group C Library 7:25 Group C Gymnasium

Team Leaders

Group A Cafeteria Group B Library 7:50 Group B Gymnasium

Team Leaders

Group C Cafeteria Group A Library 8:15 Share Findings / Q&A Gymnasium

Team Leaders

8:50 Wrap Up and Look Ahead Gymnasium

Joe Celentano and Laura Lazour

Agenda

slide-18
SLIDE 18

Next Steps:

  • Site and Tree surveys
  • Traffic Study
  • VMDO Team to develop multiple schemes that will be presented at

the Community Meeting #2 in March

  • Check DPR project website for study results and other
  • pportunities to provide input

Parks.arlingtonva.us; search Lubber Run Project