COMMUNITY VISIONING WORKSHOP NO. 2 INTRODUCTION WHAT WE HEARD - - PowerPoint PPT Presentation

JULY 24, 2018 COMMUNITY VISIONING WORKSHOP NO. 2 INTRODUCTION WHAT WE HEARD MARKET ANALYSIS DISTRICT PLAN FRAMEWORK SHORT TERM ACTIVATION NEXT STEPS ARENA DISTRICT MASTER PLAN TODAYS MEETING 001 002 003 004 005 006 COMMUNITY


slide-1
SLIDE 1

JULY 24, 2018

COMMUNITY VISIONING WORKSHOP NO. 2

slide-2
SLIDE 2

INTRODUCTION WHAT WE HEARD MARKET ANALYSIS DISTRICT PLAN FRAMEWORK SHORT TERM ACTIVATION NEXT STEPS

002 001 003 004 005 006

ARENA DISTRICT MASTER PLAN

TODAY’S MEETING

slide-3
SLIDE 3

Task 1 | Initiate & EVALUATE

FEBRUARY - APRIL

Task 2 | engage

MARCH - MAY

Task 3 | understand

MARCH - JUNE

Task 4 | explore

MAY - AUGUST

Task 5 | consent

JUNE - SEPTEMBER KICK-OFF MEETING STAKEHOLDER MEETINGS STEERING COMMITTEE MEETING #2 STEERING COMMITTEE MEETING #1 STEERING COMMITTEE MEETING #3 STEERING COMMITTEE MEETING #5 STEERING COMMITTEE MEETING #4

WE ARE HERE

COMMUNITY VISIONING WORKSHOP #1

COMMUNITY VISIONING WORKSHOP #2

COMMUNITY REVIEW OPEN HOUSE #3

ADOPTION

FINAL PLAN

Data Collection Arena District Tour/Audit Website Launch Task 2 Progress Report Preliminary Concepts & Strategies Economic, Land Use, Connections & Brand analyses Design Alternatives & Costs Implementation Funding Phasing Costs Preferred Concepts Review & Approval

ARENA DISTRICT MASTER PLAN

Schedule | overall project schedule

slide-4
SLIDE 4

STUDY AREA

30 Blocks ±165 Acres

NORTH

slide-5
SLIDE 5

Transform the area surrounding the Cox Business Center and BOK Center into a dynamic, mixed-use neighborhood and cultural district — one that acts as a gateway to Tulsa for visitors and a cultural destination for locals. Create the Tulsa Gateway District, a 21st Century neighborhood desirable for residents and visitors alike.

ARENA DISTRICT MASTER PLAN

PLAN MISSION

slide-6
SLIDE 6

Broaden and strengthen the area’s role in the Tulsa economy by identifying strategies to promote and foster district redevelopment and growth. Uncover a distinct District Identity by telling a bold story through dynamic parks & plazas, placemaking, landmarks, messaging, and public art. Reposition the area from a limited-use area into a thriving, mixed-use destination reflecting Tulsa’s cultural and historical livelihood. Shrink perceived and real distances between the District and its downtown and riverfront neighborhoods. Create an actionable plan that guides public and private sector investment and leads to short-term “wins” and resilient long- term strategies.

Project principles

01 04 03 02 05

ARENA DISTRICT MASTER PLAN

FIVE PRINCIPLES

slide-7
SLIDE 7

WHAT WE HEARD

slide-8
SLIDE 8

84+ STAKEHOLDERS 90+ WORKSHOP ATTENDEES 103 Online Participants 30+ Urban Hike Participants 4 Steering Committee Meetings

ARENA DISTRICT MASTER PLAN

PUBLIC OUTREACH SUMMARY (THROUGH June)

slide-9
SLIDE 9

STEERING COMMITTEE MEETING 2 TUESDAY, MAY 8 PUBLIC WORKSHOP 1 WEDNESDAY, MAY 9 ±90 ATTENDEES

COMMUNITY VISIONING WORKSHOP NO. 1 90+ ATTENDEES

slide-10
SLIDE 10

WHAT ARE THE STRENGTHS? WHAT IS WORKING WELL?

BOK CENTER CITY-COUNTY LIBRARY COX BUSINESS CENTER ALOFT HOTEL DOUBLETREE HOTEL MAYO HOTEL CENTER OF THE UNIVERSE ONEOK CENTER CENTRAL PARK CONDOMINIUMS

Strengths

slide-11
SLIDE 11

STATE OF OKLAHOMA BUILDINGS & PARKING LOTS 2ND STREET RAMP DENVER AVENUE TRANSIT STATION 5TH ST. CIVIC PLAZA PLAZA OF THE AMERICAS PAGE-BELCHER FEDERAL BUILDING PARKING LOTS

WHAT ARE THE WEAKNESSES? WHAT IS NOT WORKING WELL?

Weaknesses

slide-12
SLIDE 12

PLAZA OF THE AMERICAS PARKING LOT STATE OF OKLAHOMA BUILDINGS & PARKING LOTS CONNECTION TO CHARLES PAGE NEIGHBORHOOD 7TH & LAWTON AVENUE INTERSECTION CONNECTIONS TO RIVER 2ND STREET RAMP RAILROAD TRACKS DENVER AVENUE TRANSIT STATION 5TH ST. CIVIC PLAZA PAGE-BELCHER FEDERAL BUILDING

WHAT ARE THE PRIORITIES? WHERE SHOULD WE FOCUS OUR EFFORTS?

Priorities

slide-13
SLIDE 13

ARENA DISTRICT MASTER PLAN

YOUR VISION FOR THE DISTRICT | MAJOR THEMES

MORE THINGS TO DO & SEE MAKE IT MORE WALKABLE & BETTER CONNECTED MAKE IT A DESTINATION

My vision is an entertainment district that is full of life even during times and days when an event is not happening at BOK.” My vision is for a more vibrant neighborhood with a variety of services for people both during special events at the arena and in between.” To make this part of downtown more connected to central downtown and the river.” An active district with its own identity/personality that connects with adjacent neighborhoods.” Creation of a space that people would truly enjoy visiting and spending their money.” My vision is an area that is less auto

  • centric. A walkable, bikeable area that

attracts people for more than just concerts.” Destination for visitors of all ages - not just the under 30’s.” Make the area more connected to the rest of downtown and other districts, more cohesive and pedestrian friendly.” The Arena District should offer high- end urban hotel options for visitors of the BOK and Convention Center along with upscale restaurants fjtting for those having a night on the town.” More Pop-up Shops and Green Space. Downtown Grocery to meet needs of Visitors and Residents per new Hotels and Apartments.” More restaurants and shops with no setbacks and large glass windows to highlight activity and safety.” More mixed use buildings with residential, shops and eateries.” My hope is that the Arena District will become the downtown sector that connects the Riverside corridor to the Gathering Place.” To feel easily accessible from any

  • ther part of downtown.”

I would like there to be easier access from the arena to other established entertainment districts downtown.”

slide-14
SLIDE 14

CONVENTION CENTER & HOTELS

  • The CBC will need to be expanded by 300,000 to 400,000 square feet to continue to remain

competitive.

  • According to the Lost Business Report, there is a need for more full-service rooms/hotel

with room block capabilities and meeting facilities in close proximity to the CBC.

DENVER AVENUE TRANSIT CENTER

  • The current station is identifjed as downtown’s top “weakness,” as it contributes to a

perceived lack of safety in the Arena District.

  • The City and MTTA should signifjcantly upgrade security and/or fjnd a more

suitable location.

PAGE-BELCHER FEDERAL BUILDING

  • The Page-Belcher was identifjed by workshop attendees as both a top

“weakness” and the top “priority” for the district.

  • The long-term redevelopment of this site hinges on fjnding an

appropriate location for the building’s current tenants.

  • There is strong interest in having the City secure this site to

facilitate more appropriate uses for the District.

ARENA DISTRICT MASTER PLAN

WHAT WE HEARD: SUMMARY

slide-15
SLIDE 15

BOK CENTER

  • The BOK Center is one of the Arena District’s top “strengths” due to its great offering of

concerts and events, and the visitors it brings into the district.

  • During non-event days, the BOK Center block feels inactive and lacks people and energy.
  • There is desire for infjll mixed-use development surrounding the BOK Center, including

the surface parking lots.

PUBLIC SPACE

  • There is a need for more and higher-quality park space in the district, such as a

central gathering area that can host events of all sizes and serve as a catalyst for neighborhood development.

  • The current 5th Street Civic Center Plaza was identifjed as a “weakness”

for the district, since it lacks green space, feels isolated, is only partially renovated, and the spaces below the plaza are intimidating/feel unsafe.

  • The Plaza of the Americas is a very underwhelming public space, not

refmective of the district.

MIXED-USE & INFILL DEVELOPMENT

  • New infjll development should focus on mixed-use with active

ground-level uses and residential.

  • The surface lots in the district were identifjed by workshop

attendees as “priorities” for infjll.

ARENA DISTRICT MASTER PLAN

WHAT WE HEARD: SUMMARY

slide-16
SLIDE 16

GATEWAYS & CONNECTIONS

  • The district often makes an unwelcoming fjrst impression of Downtown Tulsa.
  • Connectivity to surrounding neighborhoods and districts is poor due to auto-centric streets,

superblock development patterns, and railroad and highway under and overpasses.

  • The district has the potential to have a meaningful and convenient connection to the

riverfront.

  • The district experiences a large number of yearly visitors, so improved wayfjnding

within the district is a priority.

SAFETY

  • The lack of people walking along streets and in public spaces makes the

district feel isolated and unsafe. A revitalized district will fjx this.

  • Lighting is poor throughout the district, which makes streets feel unsafe at

night.

IDENTITY

  • The district lacks a cohesive identity, with many not identifying the

area as a true district or neighborhood.

  • The district should develop a unique sense of place that is

complementary to surrounding districts.

ARENA DISTRICT MASTER PLAN

WHAT WE HEARD: SUMMARY

slide-17
SLIDE 17

MARKET ANALYSIS

slide-18
SLIDE 18

Residential

slide-19
SLIDE 19

10% 8% 6% 4% 2%

THE YOUNG PROFESSIONAL COHORT HAS GROWN AT A SLOWER RATE IN DOWNTOWN TULSA THAN IN BOTH THE CITY AND THE MSA.

DOWNTOWN CITY OF TULSA TULSA MSA

ARENA DISTRICT MASTER PLAN

YOUNG PROFESSIONALS

slide-20
SLIDE 20

9

Few employees working Downtown also live there.

Source: U.S. Census Bureau, Longitudinal Household-Employer Dynamics

Jobs in Downtown Tulsa

  • f Downtown Tulsa’s 27,500 employees

also live Downtown

1.3%-1.5% 1.1%-1.3% 0.9%-1.1% 0.7%-0.9% 0.4%-0.7% 0.2%-0.4% 0.0%-0.2%

Jobs in Downtown Tulsa

  • f Downtown Tulsa’s 27,500

employees also live Downtown

  • f Downtown workers are in

industries with average annual salaries of over $80,000

1% 27,500+ 42%

slide-21
SLIDE 21

16

Tulsa’s moderate rate of regional growth is keeping pace with many of these peers, providing evidence that Tulsa can support additional downtown development.

Source: ESRI

13% 13% 8% 8% 6% 5% 4% 0% 2% 4% 6% 8% 10% 12% 14% 16% Fort Worth Oklahoma City Indianapolis Tulsa Kansas City Louisville Cincinnati 1.0M 2.1M 1.4M 7.3M 1.3M 2.0M 2.2M

slide-22
SLIDE 22

17

Source: Costar

The recent residential growth in Downtown Tulsa is expected to continue with seven new residential developments in the pipeline.

220 E 2nd Street 2019, 240 units The Adams Building 2019, 93 units The View 2020, 220 Units 111 Greenwood 2019, 55 Units Santa Fe Square 2020, 291 Units Davenport Urban Lofts 2019, 24 units Flats on Archer 2018, 62 Units Condo, Proposed Rental, Proposed Rental, Under Construction

slide-23
SLIDE 23

Commercial

slide-24
SLIDE 24

26

Office rents in the City of Tulsa have been greater on a per square foot basis than in Downtown Tulsa, highlighting that there is no “urban premium” for office space in Downtown.

Source: CoStar

$11.50 $12.00 $12.50 $13.00 $13.50 $14.00 $14.50 $15.00 $15.50 $16.00 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 City of Tulsa Downtown

slide-25
SLIDE 25

28

22.4% 4.9% 2.5% 2.3% 0.1%

  • 2.5%
  • 3.1%
  • 5%

0% 5% 10% 15% 20% 25% Oklahoma City Cincinnati Fort Worth Louisville Tulsa Kansas City Indianapolis

Source: CoStar

This sluggish pace of office delivery has resulted in single-digit or negative growth in

  • ffice space in the past decade in each peer city except for Oklahoma City.
slide-26
SLIDE 26

29

Source: CoStar

Despite the slow growth over the past decade, there is a pipeline of commercial developments in Downtown Tulsa, all located in the Greenwood or Blue Dome Districts.

The Hartford Building (2018) 74K SF Santa Fe Square (2021) 100K SF Development of Block 44 (2019) 100K SF GreenArch (2019) 60K SF

slide-27
SLIDE 27

HOTEL

slide-28
SLIDE 28

32

Source: STR

Aloft Downtown

Ten hotels containing nearly 1,850 rooms are located in Downtown Tulsa, with 40% of these rooms coming online over the past 10 years.

DoubleTree by Hilton Holiday Inn City Center Hampton Inn & Suites Boutique BOK Center / Cox Center Full Service Select Service The Mayo Hotel (2009 – reno.) 102 rooms Fairfield Inn & Suites Tulsa Downtown (2012) 104 rooms Hyatt Regency Tulsa (1978) 444 rooms Courtyard Tulsa Downtown (2010) 119 rooms Holiday Inn City Center (1970) 220 rooms DoubleTree by Hilton (1982) 417 rooms BestWestern Plus (2015) 79 rooms Aloft Downtown (2013) 180 rooms Hampton Inn & Suites (2013) 125 rooms Ambassador Hotel Tulsa (1999 – reno.) 55 rooms

slide-29
SLIDE 29

37

Source: Downtown Nashville Omni Hotel, CBRE Hotel Report (2015), The Tennessean, Nashville Music City Center Authority Reports, Nashville Downtown Partnership Annual Report, Nashville Business Journal

As of 2018, $7.5 billion in convention center expansion is currently underway or proposed in major US markets.

New build convention center $194 million Rebuild of existing facility $500 million Expansion of existing facility $620 million Proposed expansion + anchor hotel $1.2 billion Proposed addition to existing facility $685 million Proposed addition to existing facility $1.6 billion Expansion of existing facility $500 million Convention Center Hotel Expansion $320 million Expansion and redesign of facility $233 million Renovation and expansion $207 million Expansion of existing facility $860 million Expansion project + anchor hotel $550 million

slide-30
SLIDE 30

MAPS 3 Convention Center New 70 acre city park MAPS 3 Convention Center

200,000 SQUARE FEET OF EXHIBIT SPACE 500,000 SQUARE FEET OF MEETING SPACE, INCLUDING: 45,000 SQUARE FEET OF MEETING ROOMS 35,000-SQUARE-FOOT BALLROOM “DOWNTOWN VIEWS”

OMNI HOTEL

605 NEW HOTEL ROOMS 50,000 SQUARE FEET OF MEETING SPACE 2 RESTAURANTS

ARENA DISTRICT MASTER PLAN

PEER CITIES | OKLAHOMA CITY

slide-31
SLIDE 31

Market continues to grow, but economics remain challenging even in more established Downtown area districts. A near-term focus on amenities and safety will enable critical mass in discrete locations.

Without place-based strategies, market demand is low.

Anchor tenants and subsidy will likely be necessary to catalyze activity in the Arena District; building connections to existing activity centers is important. Longer term opportunity in district as

part of mixed use development.

Market lacks support for additional select service hotel development without inducing additional demand, which can involve creation of a

vibrant district and convention center + hotel investment.

Retail is a critical component of place-making in the district, with distinctive F&B and convenience ofgerings adding infrastructure supportive of both residents and tourists. Retail and restaurants

in strategic areas is an important part of the district.

  • A highly amenitized environment will be

needed to capture and induce demand.

  • Subsidy will be necessary to advance most,

if not all, product types in the near term.

  • Concentrate investment to achieve critical

mass in a dispersed environment.

  • Focus investment on locations that

strengthen connections to existing amenities to maximize impact.

ARENA DISTRICT MASTER PLAN

RESIDENTIAL

OVERALL IMPLICATIONS FOR THE DISTRICT

COMMERCIAL OFFICE HOTEL RETAIL

Market takeaways

slide-32
SLIDE 32

GATEWAY: DOWNTOWN’S FRONT DOOR

5 T H S T R E E T DENVER AVENUE 3RD STREET 6TH STREET

C O X B U S I N E S S C E N T E R B O K C E N T E R

INTERNATIONAL WELCOME

NARRATIVE IDENTITY FRAMEWORK

LOCAL AUTHENTIC TULSA REGIONAL MUSIC + ENTERTAINMENT

  • The project focus area sufgers from

a lack of distinct identity.

  • Tulsans do not see this area as a

“district,” but rather an opportunity to build a vibrant neighborhood identity and regional entertainment destinations.

  • Because of its location, this project

area has the opportunity to serve as a GATEWAY for downtown Tulsa.

  • A civic identity and narrative

identity framework is beginning to emerge a place.

ARENA DISTRICT MASTER PLAN

A GATEWAY DISTRICT

slide-33
SLIDE 33

district plan FRAMEWORK

slide-34
SLIDE 34

C B D

B O K C E N T E R 5 T H S T R E E T P R O M E N A D E M A I N S T R E E T 6 T H S T R E E T 3 R D S T R E E T C O X B U S I N E S S C E N T E R

ARENA DISTRICT MASTER PLAN

Bring the cbd to the district & the district to the cbd

NORTH

slide-35
SLIDE 35

TULSA ARTS DISTRICT BLUE DOME DISTRICT RIVERVIEW NEIGHBORHOOD CROSBIE HEIGHTS NEIGHBORHOOD

B O K C E N T E R CHARLES PAGE BLVD D E N V E R A V E N U E C O X B U S I N E S S C E N T E R

C B D

MAIN STREET 5 T H S T R E E T P R O M E N A D E 6 T H S T R E E T

HOUSTON AVENUE C H E Y E N N E A V E N U E B O U L D E R A V E N U E 8TH STREET 7TH STREET 4TH STREET 1ST STREET 2ND STREET S O U T H W E S T B L V D

3 R D S T R E E T

ARENA DISTRICT MASTER PLAN

Improve CONNECTIONS TO SURROUNDING NEIGHBORHOODS

NORTH

slide-36
SLIDE 36 5 T H S T R E E T C H A R L E S P A G E B L V D DENVER AVENUE CIVIC CENTER DRIVE 3RD STREET 6TH STREET

C O X B U S I N E S S C E N T E R B O K C E N T E R

8TH STREET 7TH STREET 4TH STREET 1 S T S T R E ET 2ND STREET CHEYENNE AVENUE BOULDER AVENUE MAIN STREET

ARENA DISTRICT MASTER PLAN

EXTEND THE URBAN GRID/Walkable Connections

NORTH

slide-37
SLIDE 37

ARENA DISTRICT MASTER PLAN

NORTH

Build streets for people & emphasize the pedestrian experience

slide-38
SLIDE 38

TCCL

TULSA CITY COUNTY LIBRARY EXISTING SURFACE PARKING LOT

ARENA DISTRICT MASTER PLAN

DENVER AVENUE | today

slide-39
SLIDE 39

TCCL

TULSA CITY COUNTY LIBRARY

NEW INFILL DEVELOPMENT

P P

ARENA DISTRICT MASTER PLAN

DENVER AVENUE | improved

slide-40
SLIDE 40

US COURTS BUILDING EXISTING SURFACE PARKING LOT

P

ARENA DISTRICT MASTER PLAN

3RD STREET | today

slide-41
SLIDE 41

P P

NEW INFILL DEVELOPMENT

US COURTS BUILDING

ARENA DISTRICT MASTER PLAN

3RD STREET | improved

slide-42
SLIDE 42

ARENA DISTRICT MASTER PLAN

NORTH

TYPES OF CATALYTIC CIVIC SPACES

slide-43
SLIDE 43

ARENA DISTRICT MASTER PLAN

GREAT CIVIC SPACE

WHAT CAN THIS NEIGHBORHOOD BE?

RETAIL TO SUPPORT NEIGHBORHOOD, CONVENTION CENTER + ARENA NEW URBAN RESIDENTIAL LIVING + OFFICE FULL SERVICE HOTEL + CONVENTION CENTER EXPANSION

slide-44
SLIDE 44

LIBRARY BOK CENTER ALOFT HOTEL

ARENA DISTRICT MASTER PLAN

PAGE-BELCHER | EXISTING CONDITIONS

DENVER AVENUE F R I S C O A V E N U E 3 R D S T R E E T 4TH STREET

PAGE-BELCHER BUILDING

NORTH

slide-45
SLIDE 45

ARENA DISTRICT MASTER PLAN

PAGE-BELCHER | OPTION 1: ADAPTIVE REUSE + MIXED-USE

DENVER AVENUE F R I S C O A V E N U E 3 R D S T R E E T 4TH STREET

ADAPTIVE-REUSE

Modern facade

MIXED USE MIXED USE

NORTH

LIBRARY BOK CENTER ALOFT HOTEL

SHARED PARKING

slide-46
SLIDE 46

ARENA DISTRICT MASTER PLAN

PAGE-BELCHER | OPTION 2: MIXED-USE + PARK

DENVER AVENUE F R I S C O A V E N U E 3 R D S T R E E T 4TH STREET

MIXED USE

M I X E D U S E

SIGNATURE PARK

BOK LAWN

CIVIC CENTER PLAZA

NORTH

LIBRARY BOK CENTER ALOFT HOTEL

UNDERGROUND PARKING

SHARED PARKING

slide-47
SLIDE 47

ARENA DISTRICT MASTER PLAN

PAGE-BELCHER | OPTION 3: MIXED-USE + PARK

DENVER AVENUE F R I S C O A V E N U E 3 R D S T R E E T 4TH STREET

LIBRARY BOK CENTER ALOFT HOTEL

MIXED USE

MIXED USE

S I G N A T U R E P A R K

BOK LAWN

CIVIC CENTER PLAZA

NORTH

UNDERGROUND PARKING

SHARED PARKING

slide-48
SLIDE 48

ARENA DISTRICT MASTER PLAN

PAGE-BELCHER | OPTION 4: CBC expansion + FULL-SERVICE HOTEL

DENVER AVENUE F R I S C O A V E N U E 3 R D S T R E E T 4TH STREET

LIBRARY BOK CENTER ALOFT HOTEL

HOTEL

MIXED USE

S I G N A T U R E P A R K

BOK LAWN

CIVIC CENTER PLAZA

NORTH

CBC EXPANSION

UNDERGROUND PARKING

SHARED PARKING

slide-49
SLIDE 49

ARENA DISTRICT MASTER PLAN

CIVIC CENTER PLAZA | EXISTING CONDITIONS

DENVER AVENUE F R I S C O A V E N U E 4 T H S T R E E T 6 T H S T R E E T 3RD STREET 7TH STREET

C I V I C C E N T E R P L A Z A

NORTH

LIBRARY

B O K C E N T E R

C O X B U S I N E S S C E N T E R

slide-50
SLIDE 50

ARENA DISTRICT MASTER PLAN

CIVIC CENTER PLAZA | SHORT-TERM IMPROVEMENTS

DENVER AVENUE F R I S C O A V E N U E 4 T H S T R E E T 6 T H S T R E E T 3RD STREET 7TH STREET

IMPROVED ENTRY

RECENT IMPROVEMENTS

NORTH

N E W E N T R A N C E

LIBRARY

B O K C E N T E R

C O X B U S I N E S S C E N T E R

slide-51
SLIDE 51

LIBRARY

B O K C E N T E R

C O X B U S I N E S S C E N T E R

ARENA DISTRICT MASTER PLAN

CIVIC CENTER PLAZA | LONG-TERM IMPROVEMENTS: OPTION 1

DENVER AVENUE F R I S C O A V E N U E 4 T H S T R E E T 6 T H S T R E E T 3RD STREET 7TH STREET

MIXED USE

M I X E D U S E

C I V I C C E N T E R c

  • m

m

  • n

s A C T I V A T E D P L A Z A

NORTH

U N D E R G R O U N D P A R K I N G UNDERGROUND PARKING

slide-52
SLIDE 52

LIBRARY

B O K C E N T E R

C O X B U S I N E S S C E N T E R

ARENA DISTRICT MASTER PLAN

CIVIC CENTER PLAZA | LONG-TERM IMPROVEMENTS: OPTION 2

DENVER AVENUE F R I S C O A V E N U E 4 T H S T R E E T 6 T H S T R E E T 3RD STREET 7TH STREET

HOTEL

C B C E X P A N S I O N

CIVIC CENTER commons A C T I V A T E D P L A Z A

NORTH

U N D E R G R O U N D P A R K I N G UNDERGROUND PARKING

M I X E D U S E

slide-53
SLIDE 53

ARENA DISTRICT MASTER PLAN

BANK OF OKLAHOMA LOT | EXISTING CONDITIONS

4TH STREET CHEYENNE AVENUE DENVER AVENUE 2 N D S T R E E T 1 S T S T R E E T 3RD STREET PAGE-BELCHER BUILDING

BOK CENTER

L I B R A R Y

1 W E S T P A R K I N G G A R A G E ONE PLACE TOWER

EXISTING SURFACE LOT

NORTH

slide-54
SLIDE 54

ARENA DISTRICT MASTER PLAN

BANK OF OKLAHOMA LOT | OPTION 1: MIXED-USE INFILL

4TH STREET CHEYENNE AVENUE DENVER AVENUE 2 N D S T R E E T 1 S T S T R E E T 3RD STREET PAGE-BELCHER BUILDING

BOK CENTER

L I B R A R Y

1 W E S T P A R K I N G G A R A G E ONE PLACE TOWER

MIXED USE

G R O U N D F L O O R A C T IVATION

NORTH

slide-55
SLIDE 55

ARENA DISTRICT MASTER PLAN

BANK OF OKLAHOMA LOT | OPTION 2: FULL-SERVICE HOTEL

4TH STREET CHEYENNE AVENUE DENVER AVENUE 2 N D S T R E E T 1 S T S T R E E T 3RD STREET PAGE-BELCHER BUILDING

BOK CENTER

L I B R A R Y

1 W E S T P A R K I N G G A R A G E ONE PLACE TOWER

Hotel P A R K I N G

G R O U N D F L O O R A C T IVATION

NORTH

slide-56
SLIDE 56

Short term activation

slide-57
SLIDE 57

CIVIC CENTER PLAZA

slide-58
SLIDE 58

CIVIC CENTER PLAZA

slide-59
SLIDE 59

BOK EVENT LAWN

slide-60
SLIDE 60

NEXT STEPS

slide-61
SLIDE 61

MKSK Consultant Team synthesizes input & create preferred concept and recommendations Final Steering Committee Meeting + Public Workshop: Date & Location TBD

AUGUST SEPTEMBER

ARENA DISTRICT MASTER PLAN

NEXT STEPS

slide-62
SLIDE 62

STREETS & CONNECTIVITY CATALYTIC OPPORTUNITY SITES PUBLIC SPACES COMMENTS

TELL US WHAT YOU THINK

2 1 3 4

slide-63
SLIDE 63

Thank you!