community liaison working group
play

Community Liaison Working Group 19 September 2018 Staff present at - PowerPoint PPT Presentation

King Edward Memorial Park Foreshore Community Liaison Working Group 19 September 2018 Staff present at the CLWG Tideway Jeff Alchin Tideway Mike Appleton Communications Manager CVB Charlie Lout Site Manager Dominic Lovelock


  1. King Edward Memorial Park Foreshore Community Liaison Working Group 19 September 2018

  2. Staff present at the CLWG Tideway • Jeff Alchin Tideway • Mike Appleton Communications Manager CVB • Charlie Louët Site Manager • Dominic Lovelock Deputy Site Manager • June Saunders Community Relations Officer • Breffni Quinlivan Environmental Manager 2

  3. CONTENTS Environmental update (noise and air quality) Legacy and Community Progress report Upcoming works 3

  4. Environmental 4

  5. Noise ise & Ai Air Qu Quality lity No exceedances - June, July, August 2018 KEMPF/AA/2 KEMPF/AA/1 Continuous air quality monitoring location Long-term unattended noise monitoring location 5

  6. Legacy and Community Relations 6

  7. Volunteering and Charity Money raised from the event went towards Tideway’s three staff charities, as well as the Shadwell Basin Outdoor Activity Centre, which gets young people from some of the most disadvantaged communities in London onto the river every year 7

  8. Women in Engineering 2018 In June, as part of Women in Engineering Week 2018, Tower Hamlets Guides and Brownies visited Chambers Wharf, and we visited a Brownie Pack in Bow The girls learnt that women can make a positive impact in engineering and construction - as well as taking part in some fun tasks After a quick talk about engineering and the Tideway project, the girls got stuck into lots of activities, to get them thinking like engineers. These included building spaghetti and marshmallow towers, balloon hovercrafts, lava lamps and making lemon fizz volcanoes And of course a challenge to ‘raise the bar’ which was this year’s theme #raisethebar 8

  9. RI RIVER VER TIMES MES – Sum ummer mer Editi ition on A digital copy of this publication can be found at https://www.tideway.london/media/4081/river-times_east_summer_18.pdf 9

  10. Next t Ge Gene nerati ration on of of Eng ngine ineering ering Appren renti ticesh ceships ips • Three new civil engineering apprentices have joined our team • Two are from Newham, one recently finished studying at the London Design Engineering UTC • Two are studying degree level 6 qualifications Work rk experience erience • Four work experience students with us over the • World of Work visit from students Summer. taking part in the National Citizen • Two from the St Michael's College, one from Service summer programme ‘The Walworth Academy and one from East Young Challenge’ Leaders Academy (EYLA) • They were working on a project to Here’s some of their feedback: raise money for charity tackling domestic violence “Thanks to my work experience I have been able to develop a wide range of skills, including working as part of a team, listening and • They practised their Dragon’s Den organisation. It's also helped boost my confidence.” style presentation with us. “Getting a feel of engineering at Tideway has really encouraged me to go on and work in engineering.” 10 “Engineering is now definitely an option for my future .”

  11. Fore resho shore re Clean ean-up up Kin ing Edwar ard d Me Memorial morial Fore resh shore ore Sit ite • Tideway East volunteers headed down to the foreshore in July to clean up plastic rubbish • The team made a great effort and were able to collect many bags full of plastic • This waste is taken away and properly disposed Plastic is a hazardous material polluting our waterways It’s putting wildlife at risk, harming and in some cases mutating aquatic life 11

  12. Fore resho shore re clean ean-up up on th the e Isl sle e of Do Dogs s Staff volunteers, accompanied by the neighbouring Ecology Consultancy, based at Bermondsey Wall West, took to the Isle of Dogs foreshore to remove plastic waste embedded within its beach. Within the fifty bags of plastic rubbish collected they found a bag of Smiths salted peanuts with an expiry date of January 1984 - Which makes them 34 years old! Newcastle Draw Dock - August 2018 12

  13. More information can be found at: https://www.tideway.london/our-community/foreshore-festival/Shadwell-Activities 13

  14. Tideway y 2017/18 Annual Report Significant progress has been made on the project over the last 12 months and much of it is captured in Tideway’s 2017/18 Annual Report. In the year to 31 March 2018, we hit some key milestones, with all but one of our 21 construction sites up and running, the completion of the first shafts and the welcoming of three of our six TBMs. The report highlights Tideway’s commitment to use the river and cut the number of lorries needed for the project – with nearly 420,000 tonnes of material moved by barge to date and more than 20,000 lorry loads avoided. Report can be found at: https://www.tideway.london/media/4029/tideway-annual_report_2017-18.pdf 14

  15. Tha Thank nk you ou Any questions please contact the Tideway Helpdesk on: Telephone: 080 8000 00 308 0808 080 Email: Helpdesk@Tideway.London 15

  16. Progress report 16

  17. New diversi sion on she heet t pile les now complete lete August 2018

  18. Cofferdam ferdam str trengt ngtheni hening ng works rks ongoi oing ng Reinforc forced ed concret rete e piles August 2018

  19. Pil iles es are re broken en down wn read ady y for concr ncrete ete sl slab b and conc oncre rete te bea eams ms August 2018

  20. Pil iles es are re broken en down wn read ady y for concr ncrete ete sl slab b and concr oncrete ete bea eams ms August 2018

  21. Water ter ma main in laid id th through rough park rk August 2018

  22. June e 2018

  23. June e 2018

  24. June e 2018

  25. Upcoming work 25

  26. Upc pcoming ng works ks • Cofferdam strengthening works: - Concrete piles in cofferdam to finish in October - Concrete beams tying the piles together ongoing until November. These works are tidally affected • Concrete piles on landside in October. A concrete slab will be built on top to support silos being delivered in November for ground improvement works to the main area of the cofferdam • Concrete slab to be built within the North East Storm Relief Sewer diversion. These works are tidally affected and scheduled to start in October • Ground improvement works in November for approximately 4 to 6 months. This will be deep soil mixing: a rig is used to auger down into the ground and inject and mix grout to improve the ground characteristics 26

  27. Upcoming works (plan view) 27

  28. Pro rogr gramm amme 2018 2019 2020 2021 2022 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Install cofferdam Building of slab is tidally affected Relieving platform Additional Sheet Piles Prepare cofferdam platform Diaphragm Walls Extended hours for long pours / Removal of spoil tidally affected Removal of spoil tidally affected Excavate shaft Build Shaft Extended hours for long pours Hydraulic Structures Connect into Sewer Remove cofferdam Removal tidally affected Moving parts and tests Landscaping Cofferdam platform preparation now includes a scope of ground improvement works 28

  29. TIDEWAY TIME LAPSE FILM – JULY 2018 https://www.youtube.com/watch?v=zNkaMwjo5e4 Please cut and paste this link into your browser 29

  30. THANK YOU King Edward Memorial Park Foreshore Community Liaison Working Group 19 September 2018 30

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend