National Grid and High Capacity Corridors
Avinash M. Pavgi POWERGRID
May 1, 2012
Capacity Corridors Avinash M. Pavgi POWERGRID May 1, 2012 Area : - - PowerPoint PPT Presentation
National Grid and High Capacity Corridors Avinash M. Pavgi POWERGRID May 1, 2012 Area : 1010,000 SQ KMS Population : 330 Million REGIONAL REGIONAL Peak Demand : 41 GW Max energy Consumption:280 BU INSTALLED CAPACITY GRIDS GRIDS
May 1, 2012
INSTALLED CAPACITY
NORTHERN :- 53.7 GW EASTERN :- 26.3 GW SOUTHERN :- 52.8 GW WESTERN :- 64.4 GW NORTH-EASTERN :- 2.45 GW
TOTAL 200 GW
Total 3,287,263 sq. km area More than 1 Billion people
SOUTH THERN ERN REGION ION WESTE TERN REGION ION EAST STERN ERN REGION ION NORT RTHERN ERN REGION ION
NORTH- EASTERN REGION
Area : 1010,000 SQ KMS Population : 330 Million Peak Demand : 41 GW Max energy Consumption:280 BU Area : 951470 SQ KMS Population : 244 Million Peak Demand : 42.4 GW Max energy consumption :288 BU Area : 636280 SQ KMS Population : 232 Million Peak Demand : 37.2 GW Max energy consumption :250BU Area : 433680 SQ KMS Population : 240 Million Peak Demand : 17.2 GW Max energy consumption:105BU Area : 255,090 SQ KMS Population : 40 Million Peak Demand : 2.2GW Max energy consumption : 11BU
Total 3,287,263 sq. km area More than 1 Billion people
Peak Demand: 136 GW Energy Requirement : 934BU
NLDC: Ensure integrated operation of National Grid RLDC: Ensure integrated operation of Regional Grid SLDC: Ensure integrated operation of State Grid
NEW Grid
South Grid South
West North
East Northeast
Five Regional Grids Five Frequencies
October 1991 East and Northeast synchronized March 2003 West synchronized With East & Northeast
August 2006 North synchronized With Central Grid
Central Grid
Five Regional Grids Two Frequencies
Renewable: 24.5 GW Installed Capacity: 200 GW
SR Synch By 2013-14
Inter – Regional Capacity: 27.95 GW
National Grid – A Continuing Process
** Source- Planning commission report on IEP
Present Generation Capacity & Demand - 200 GW & 136 GW
# Considering 9% GDP growth rate
205GW
‾ Chhattisgarh : 58000 MW ‾ Orissa : 30000 MW ‾ Jharkhand : 15000 MW ‾ Madhya Pradesh:16000 MW
Northern Himalayan region
‾ Andhra Pradesh: 24000 MW ‾ Tamil Nadu : 10000 MW ‾ Gujarat : 11000 MW
Expected Installed Capacity (2025) : 6,00,000MW
Lara Partabpur Talcher/Ib Valley Krishnapatnam
NEPAL
Korba Bhopal Indore Tadri Girye Kaiga Thiruvananthapuram Pipavav Kudankulam
SR
Bangalore Kayamkulam
WR
Tarapur Mumbai Cuddalore Ennore Akaltara Raipur Hyderabad RAPP Gandhinagar Mudra Delhi Ludhiana
NR
Jaipur Jammu Sasan Vindhyachal Lucknow Load Centre Based Generation Ultra-Mega Generation Hydro Based Generation Coastal Generation Coal Based generation Nuclear generation Bhubaneswar Darlipali Vizag Simhadri LEGEND Load-Centre
NER
Guwahati Koderma SIKKIM Kolkata
ER
Patna
NECK CHICKENBHUTAN
DESH BANGLA
MYANMMAR Mangalore Kozhikode South Madras Chennai
Energy resources (coal, water etc.) unevenly distributed
Central Sector State Sector Private Sector Total 21222 (34%) 21355(34%) 19797(32%) 62374 28600 (28%) 14400(15%) 57000 (57%) 100000
XI XII
Cluster/Corridor
Installed Capacity (MW) LTOA Granted (MW) 1 Orissa 7 10090 6080 2. Jharkhand 5 4540 4084 3, Sikkim 9 2358 2358 4 Bilaspur+MP 6 4370 4160 5. Chattisagrh 13 15485 15185 6. Krishnapatnam 4 4600 3072 7. Tuticorin 2 2600 2045 8. Srikakulam 2 3960 3760 9. Cuddlore/Nagapattinam 3 3570 2987 10. Vemagiri 4 5400 5150 11. Common Transmission system in WR and NR Total 55 56973 48881
PROPOSED HIGH CAPACITY TRANSMISSION
LEGEND
BALLABGARH BAWANA MURADNAGAR MANDAULA MEERUT BASSI (RSEB) PANKI JALANDHAR II III GANDHAR STPS DULHASTI PAMPORE SALALI&II JAMMU SARNA HAMIRPUR SIUL PONG RAPP-B ANTA DAUSA CHITTORGARH UDAIPUR KOLAR BAHOOR KAYAMKULAM PALLOM EDAMON KOLASIB AGARTALA AGARTALA GPP MALDA KUMARGHAT BADARPUR IMPHAL JIRIBAM AIZWAL ZEMABAWK HAFLONG LOKTAK KAMENG RAMMAM SILIGURI PURNEA KHLIEHRIAT CHUKHA BONGAIGAON BIRPARA DALKHOLA SAMAGURI BALIPARA TEZPUR KOPILI DIMAPUR DOYANG MARIANI ITANAGAR KHANDONG MISA RANGANADI GOHPUR ZIRO DEOMALI KATHALGURI KAKRAPAR BHARUCH KAWAS NAVSARI VALTHAN NAGDA VAPI HOSUR SHARIF MERAMUNDALI BARIPADA STPS KOLAGHAT ALLAHABAD SINGRAULI LUDHIANA PATIALA KAITHAL BUDHI- PADAR NELLORE KURNOOL NARENDRA KOLHAPUR MAPUSA TRIVANDRUM BHIWADI SATNA UNNAO GORAKHPUR(PG) MUZAFARPUR TALA B H U T A N SEONI FATEHBAD MAINPURI SIPAT KHANDWA RAJGARH SSAROVAR BOISAR TARAPUR DAVANGERE HIRIYUR GAON SUBHASGRAM AMRITSAR BHATAPARA WARANGAL ALAMANTHI MALEKOTTAYUR PONDICHERRY PUGALUR MYSORE KOZIKODE DELHI KUDANKULAM TIRUNELVELI MUVATTAPUZHA BARH PATNA MAU (PG) (UP) (UP) KOTA RAPP-C&D KANKROLI PARBATI KOLDAM PALLATANA GBPP RANCHI AKOLA URI-IICORRIDORS UNDER VARIOUS IPP'S
CHAMPA KISHANGANJ AGRATransmission Corridor for Chhattisgarh IPPs (Corridor - V)
BHOPAL JAIPUR JHARKHAND POOL CHARIALI ALIPURDUAR PUNATSANGCHU-ITransmission Corridor for Orissa IPPs (Corridor - I) Transmission Corridor for Jharkhand IPPs (Corridor - II) Transmission Corridor for Tuticorin IPPs (Corridor - VII) Transmission Corridor for Sikkim IPPs (Corridor - III)
NABINAGAR SRIKAKULAM NELLORE BANGALORE MADHUGIRI CHEYYUR UMPPTransmission Corridor for Krishnapatnam IPPs (Corridor - VI)
TIRUVALAM NAGAPATTINAM KURUKSHETRA VADODRA BALIA B'SAHAR ORAITransmission Corridor for Chhattisgarh & MP IPPs (Corridor - IV)
PIRANATransmission Corridor for Srikakulam IPPs (Corridor - VIII) Transmission Corridor for Southern Region IPPs (Corridor - IX) Transmission Corridor for Vemagiri IPPs (Corridor - X) Transmission Corridor for Nagapattinam/Cuddalore IPPs
TUTICORIN NARENDRA VEMAGIRIEnd of 11th Plan (Ckm) Estimated additions in 12th Plan (Ckm)
Sub-Stn. Voltage level End of 11th Plan (MVA/MW) Estimated addition in 12th Plan (MVA/MW) 765 KV 53,000 110,000 HVDC 14,700 16,000 -22,000 400 KV 145,000 80,000 220/230 KV 230,000 95,000 Inter Regional Transfer Capacity 28,000 65,000
– Resistance of people, terrains in areas of mountains and forest