Capacity Corridors Avinash M. Pavgi POWERGRID May 1, 2012 Area : - - PowerPoint PPT Presentation

National Grid and High Capacity Corridors Avinash M. Pavgi POWERGRID May 1, 2012 Area : 1010,000 SQ KMS Population : 330 Million REGIONAL REGIONAL Peak Demand : 41 GW Max energy Consumption:280 BU INSTALLED CAPACITY GRIDS GRIDS


slide-1
SLIDE 1

National Grid and High Capacity Corridors

Avinash M. Pavgi POWERGRID

May 1, 2012

slide-2
SLIDE 2

INSTALLED CAPACITY

NORTHERN :- 53.7 GW EASTERN :- 26.3 GW SOUTHERN :- 52.8 GW WESTERN :- 64.4 GW NORTH-EASTERN :- 2.45 GW

TOTAL 200 GW

REGIONAL GRIDS

Total 3,287,263 sq. km area More than 1 Billion people

SOUTH THERN ERN REGION ION WESTE TERN REGION ION EAST STERN ERN REGION ION NORT RTHERN ERN REGION ION

NORTH- EASTERN REGION

REGIONAL GRIDS

Area : 1010,000 SQ KMS Population : 330 Million Peak Demand : 41 GW Max energy Consumption:280 BU Area : 951470 SQ KMS Population : 244 Million Peak Demand : 42.4 GW Max energy consumption :288 BU Area : 636280 SQ KMS Population : 232 Million Peak Demand : 37.2 GW Max energy consumption :250BU Area : 433680 SQ KMS Population : 240 Million Peak Demand : 17.2 GW Max energy consumption:105BU Area : 255,090 SQ KMS Population : 40 Million Peak Demand : 2.2GW Max energy consumption : 11BU

Total 3,287,263 sq. km area More than 1 Billion people

Peak Demand: 136 GW Energy Requirement : 934BU

slide-3
SLIDE 3

NLDC: Ensure integrated operation of National Grid RLDC: Ensure integrated operation of Regional Grid SLDC: Ensure integrated operation of State Grid

31 5

Power System Hierarchy

slide-4
SLIDE 4

NEW Grid

South Grid South

West North

East Northeast

Five Regional Grids Five Frequencies

October 1991 East and Northeast synchronized March 2003 West synchronized With East & Northeast

August 2006 North synchronized With Central Grid

Central Grid

Five Regional Grids Two Frequencies

Renewable: 24.5 GW Installed Capacity: 200 GW

SR Synch By 2013-14

Inter – Regional Capacity: 27.95 GW

slide-5
SLIDE 5
  • 765kV/400kV

lines: about 1,11,000 ckm

  • 220kV lines: about 135,000

ckm

  • HVDC Bipole (±500kV): 8900

ckms – 4 nos.

  • HVDC Back-to-back: 7 nos.

(3000MW)

Transmission Network - Present

slide-6
SLIDE 6

National Grid – A Continuing Process

National Grid – Present

Inter-regional Capacity – 27,950MW

slide-7
SLIDE 7

Need of new initiatives in Transmission

Projected Power Scenario

** Source- Planning commission report on IEP

Present Generation Capacity & Demand - 200 GW & 136 GW

# Considering 9% GDP growth rate

205GW

slide-8
SLIDE 8
  • Coal – In Central India

‾ Chhattisgarh : 58000 MW ‾ Orissa : 30000 MW ‾ Jharkhand : 15000 MW ‾ Madhya Pradesh:16000 MW

  • Hydro – In North Eastern &

Northern Himalayan region

  • Coastal based

‾ Andhra Pradesh: 24000 MW ‾ Tamil Nadu : 10000 MW ‾ Gujarat : 11000 MW

Expected Installed Capacity (2025) : 6,00,000MW

Lara Partabpur Talcher/Ib Valley Krishnapatnam

NEPAL

Korba Bhopal Indore Tadri Girye Kaiga Thiruvananthapuram Pipavav Kudankulam

SR

Bangalore Kayamkulam

WR

Tarapur Mumbai Cuddalore Ennore Akaltara Raipur Hyderabad RAPP Gandhinagar Mudra Delhi Ludhiana

NR

Jaipur Jammu Sasan Vindhyachal Lucknow Load Centre Based Generation Ultra-Mega Generation Hydro Based Generation Coastal Generation Coal Based generation Nuclear generation Bhubaneswar Darlipali Vizag Simhadri LEGEND Load-Centre

NER

Guwahati Koderma SIKKIM Kolkata

ER

Patna

NECK CHICKEN

BHUTAN

DESH BANGLA

MYANMMAR Mangalore Kozhikode South Madras Chennai

Energy resources (coal, water etc.) unevenly distributed

Energy Resources Map

slide-9
SLIDE 9

Need of new initiatives in Transmission

 Increased role of ISTS power transfer  Need of long distance Transmission system  Minimum use of land and Right-of-Way  Optimal cost per MW transmission  Optimal Transmission Losses  Adequate margin – to cater trading, contingencies  Implementation – Equipment availability, manpower

Future Transmission Planning

  • Consideration
slide-10
SLIDE 10

Change in Generation Profile

Central Sector State Sector Private Sector Total 21222 (34%) 21355(34%) 19797(32%) 62374 28600 (28%) 14400(15%) 57000 (57%) 100000

XI XII

slide-11
SLIDE 11

Development Plan

slide-12
SLIDE 12

Road Map for Indian Power System

  • Creation of 11 no. High Capacity Trans. Corridors for 55

IPPs (55,000 MW)

  • Ultra Trans. System for 6 UMPPs (24000MW)
  • Transmission

system for DVC generation projects (5000MW)

  • Transmission system for Evacuation of power from

NER & Bhutan

Few Major Transmission Projects

slide-13
SLIDE 13

Proposed 11 nos. High Capacity Transmission Corridors for IPP Projects

slide-14
SLIDE 14
  • Sl. No.

Cluster/Corridor

  • No. of IPPs

Installed Capacity (MW) LTOA Granted (MW) 1 Orissa 7 10090 6080 2. Jharkhand 5 4540 4084 3, Sikkim 9 2358 2358 4 Bilaspur+MP 6 4370 4160 5. Chattisagrh 13 15485 15185 6. Krishnapatnam 4 4600 3072 7. Tuticorin 2 2600 2045 8. Srikakulam 2 3960 3760 9. Cuddlore/Nagapattinam 3 3570 2987 10. Vemagiri 4 5400 5150 11. Common Transmission system in WR and NR Total 55 56973 48881

Transmission Corridors for IPPs

slide-15
SLIDE 15

High Capacity Transmission Corridor

NEYVELI RAICHUR RAMAGUNDAM VIJAYAWADA CHANDRAPUR KORADI KORBA KORBA(W) VINDHYACHAL SATPURA RIHAND ANPARA OBRA RENGALI FARAKKA KAHAL- TALCHER MUNIRABAD N'SAGAR URI MAITHON MADRAS TEHRI DHAULIGANGA CHAMERA N.JHAKRI AURAIYA KAIGA MADURAI UDUMALPET TRICHY SALEM BANGALORE CUDDAPAH GOOTY HYDERABAD GAZUWAKA ASOJ DHULE BHILAI ITARSI JAIPUR KANPUR LUCKNOW JEYPORE J JEERAT DURGAPUR NORTH TRICHUR KISHENPUR WAGOORA MOGA BHIWANI BIHAR- KHAMMAM BAREILLY HISSAR NALLAGARH PANIPAT MALERKOTLA DEHGAM INDRAVATI DADRI JAMSHEDPUR

PROPOSED HIGH CAPACITY TRANSMISSION

LEGEND

BALLABGARH BAWANA MURADNAGAR MANDAULA MEERUT BASSI (RSEB) PANKI JALANDHAR II III GANDHAR STPS DULHASTI PAMPORE SALALI&II JAMMU SARNA HAMIRPUR SIUL PONG RAPP-B ANTA DAUSA CHITTORGARH UDAIPUR KOLAR BAHOOR KAYAMKULAM PALLOM EDAMON KOLASIB AGARTALA AGARTALA GPP MALDA KUMARGHAT BADARPUR IMPHAL JIRIBAM AIZWAL ZEMABAWK HAFLONG LOKTAK KAMENG RAMMAM SILIGURI PURNEA KHLIEHRIAT CHUKHA BONGAIGAON BIRPARA DALKHOLA SAMAGURI BALIPARA TEZPUR KOPILI DIMAPUR DOYANG MARIANI ITANAGAR KHANDONG MISA RANGANADI GOHPUR ZIRO DEOMALI KATHALGURI KAKRAPAR BHARUCH KAWAS NAVSARI VALTHAN NAGDA VAPI HOSUR SHARIF MERAMUNDALI BARIPADA STPS KOLAGHAT ALLAHABAD SINGRAULI LUDHIANA PATIALA KAITHAL BUDHI- PADAR NELLORE KURNOOL NARENDRA KOLHAPUR MAPUSA TRIVANDRUM BHIWADI SATNA UNNAO GORAKHPUR(PG) MUZAFARPUR TALA B H U T A N SEONI FATEHBAD MAINPURI SIPAT KHANDWA RAJGARH SSAROVAR BOISAR TARAPUR DAVANGERE HIRIYUR GAON SUBHASGRAM AMRITSAR BHATAPARA WARANGAL ALAMANTHI MALEKOTTAYUR PONDICHERRY PUGALUR MYSORE KOZIKODE DELHI KUDANKULAM TIRUNELVELI MUVATTAPUZHA BARH PATNA MAU (PG) (UP) (UP) KOTA RAPP-C&D KANKROLI PARBATI KOLDAM PALLATANA GBPP RANCHI AKOLA URI-II
  • II
BAHDURGARH JODHPUR KISHENGANGA ARASUR MAHBOOB NAGAR SOLAPUR(PG) PARLI(N) PUNE LONIKHAND KALWA B'SPUR DAMOH KARAMSAD LIMBDI RANCHODPURA ZERDA KARAD SOLAPUR BHILWARA MERTA ALISTONG WAMPOH
  • III
GANGTOK MELLI TALGUPPA HASSAN KARAIKUDI VEMAGIRI PARLI RAJKOT NAVI MUMBAI KHADOLI SHUJALPUR KHARADPADA MAGARWADA AMARGARH CHANDAKA TEESTA-V RANGIT NKSTPP FATEHPUR BISHWANATH LOWER SUBANSIRI BHINMAL GURGAON RAMPUR SILCHAR MAITHON RB SASAN MUNDRA JETPUR AMRELI MUMBAI LOC BHADRAWATI BYRNIHAT SONIPAT K'WANGTOO BACHCHAU GAYA TUTICORIN JV KRISHNAPATANAM UMPP NORTH CHENNAI JV SIKAR RATANGARH BASPA PANCHKULA POOLING STN JATTI KALAN LUCKNOW BAREILLY DASUYA MAHRANIBAGH GNOIDA KODERMA BOKARO MEJIA FROM SIKKIM MELLI BEHRAMPUR PUNE A'BAD NEEMRANA MANESAR DEHRADUN BAGPAT GAJWEL TILAIYYA ROORKEE SAHARANPUR ROORKEE KASHIPUR SASARAM VARANASI WR POOL ANGUL PADGHE AURANGABAD RAIPUR RAIGARH WARDHA INDORE GWALIOR BINA JABALPUR POOL JABALPUR DHARAMJAYGARH JHARSUGUDA

CORRIDORS UNDER VARIOUS IPP'S

CHAMPA KISHANGANJ AGRA

Transmission Corridor for Chhattisgarh IPPs (Corridor - V)

BHOPAL JAIPUR JHARKHAND POOL CHARIALI ALIPURDUAR PUNATSANGCHU-I

Transmission Corridor for Orissa IPPs (Corridor - I) Transmission Corridor for Jharkhand IPPs (Corridor - II) Transmission Corridor for Tuticorin IPPs (Corridor - VII) Transmission Corridor for Sikkim IPPs (Corridor - III)

NABINAGAR SRIKAKULAM NELLORE BANGALORE MADHUGIRI CHEYYUR UMPP

Transmission Corridor for Krishnapatnam IPPs (Corridor - VI)

TIRUVALAM NAGAPATTINAM KURUKSHETRA VADODRA BALIA B'SAHAR ORAI

Transmission Corridor for Chhattisgarh & MP IPPs (Corridor - IV)

PIRANA

Transmission Corridor for Srikakulam IPPs (Corridor - VIII) Transmission Corridor for Southern Region IPPs (Corridor - IX) Transmission Corridor for Vemagiri IPPs (Corridor - X) Transmission Corridor for Nagapattinam/Cuddalore IPPs

TUTICORIN NARENDRA VEMAGIRI
slide-16
SLIDE 16

Integration of Supply & Consumption points through Power Expressway

slide-17
SLIDE 17
  • Tr. Lines, Voltage level

End of 11th Plan (Ckm) Estimated additions in 12th Plan (Ckm)

765 KV 7,612 25000-30000 HVDC Bi-pole 11,078 4000 - 6000 400 KV 1,25,000 50000 220 KV 1,50,000 40000 Total Tr. Lines 2,93,852 119,000 – 126,000

Transmission Addition Programme

slide-18
SLIDE 18

Sub-Stn. Voltage level End of 11th Plan (MVA/MW) Estimated addition in 12th Plan (MVA/MW) 765 KV 53,000 110,000 HVDC 14,700 16,000 -22,000 400 KV 145,000 80,000 220/230 KV 230,000 95,000 Inter Regional Transfer Capacity 28,000 65,000

Transmission Addition Programme

slide-19
SLIDE 19
  • Transmission Line : 50,000 ckm
  • 765kV

– 17120 ckm

  • 400kV

– 22000 ckm

  • 220kV/132kV

– 1230 ckm

  • HVDC
  • 9630 ckm
  • Substations : about 109,400 MVA (60 nos.)
  • 765kV

– 88,000 MVA

  • 400kV

– 7560 MVA

  • 220kV/132kV – 840 MVA
  • HVDC
  • 13,000 MVA

Expansion Programme in next 6-7 Years (POWERGRID)

slide-20
SLIDE 20

Road Map for Indian Power System

  • Creation of reliable repairing facilities & development
  • f indigenous manufacturing capacity
  • Need to establish reliable testing facilities for EHV and

UHV

  • Development of Smart Grid for real-time monitoring of

dynamic state and optimal utilisation of facilities

Issues & Challenges

slide-21
SLIDE 21

Road Map for Indian Power System

  • Issues concerning availability of RoW and land are

becoming critical –

– Resistance of people, terrains in areas of mountains and forest

  • Sector to grow from 173 GW to 600 GW in next 20

years – Even 765kV system may not be good enough. New methods have to be found out

  • Cable manufacturers need to Research & develop

cables which could be more cost effective

  • With increasing magnitude of power transmission,

new challenges of proper O&M

Issues & Challenges

slide-22
SLIDE 22

Thank You