BRICK TOWNSHIP FLOODING SOLUTIONS Presented to the Residents of - - PowerPoint PPT Presentation
BRICK TOWNSHIP FLOODING SOLUTIONS Presented to the Residents of - - PowerPoint PPT Presentation
BRICK TOWNSHIP FLOODING SOLUTIONS Presented to the Residents of Cherry Quay Mayor John G. Ducey and Township Council June 22, 2020 ACT ENGINEERS, INC. TEAM Robert Korkuch, PE, PP, CME Eric Rosina President Vice President Principal,
Jeff Richter, PE, PP Director, Engineering Carol Beske Director, Community Outreach Eric Rosina Vice President Principal, Environmental Services Junetta Dix Director, Environmental Services Robert Korkuch, PE, PP, CME President
ACT ENGINEERS, INC. TEAM
ACT ENGINEERS’ INITIAL SCOPE OF WORK
- Review previous & on-going studies
- Identify flood elevations and establish
solutions by elevation
- Prepare mapping of existing conditions
(topography, storm sewer, roadway, bulkhead, key/vulnerable infrastructure, etc.) for 13 identified neighborhoods
- 13 neighborhoods – this meeting focuses on
the Cherry Quay community; additional meetings for other neighborhoods
- Recommend conceptual engineering design
solutions specific to each neighborhood
13 STUDY AREAS
1) Shore Acres 2) Seawood Harbor (Including Snake Road) 3) Normandy Beach 4) Beaver Dam Creek Watershed
- a. Bay Harbor
- b. Baywood
- c. Harbor Place
- d. Island Drive / Island Court
- e. Vannote / Glenwood Place
f.
Swan Point
- g. Sandy Point
- h. Tunes Brook
i.
Princeton Ave (Bayfront)
5) Cherry Quay (Seagoin Road)
STEVENS INSTITUTE OF TECHNOLOGY FLOOD ADVISORY (NAVD88) NATIONAL WEATHER SERVICE (GAUGE DATUM)
0.5 1 1.5 2 2.5 3 3.5 4
Elevation (NAVD88)
USGS Barnegat Bay at Mantoloking Tide Gage (NAVD88)
12/21/12 Peak: 3.38’ 11/1/19 Peak: 2.93’ 12/27/12 Peak: 2.90’ 10/12/19 Peak: 2.74’ 10/31/12 Peak: 2.67’ 4/17/11 Peak: 2.66’ 9/2/06 Peak: 2.64’ 3/14/10 Peak: 2.61’ 4/16/18 Peak: 2.60’ 2/7/20 Peak: 2.60’
Average Tide Elevation (rising +1.75” per decade)
*Tide gage data is unpublished
during extreme storm events
- Irene (8/27 - 28/11)
- Sandy (10/29 - 30/12)
- Nor’Easter (3/6/ 7/18)
Concept Design Elevation 1.4’-2.0’
Impacted < 2.0’ Flood Elevation (Short Term Design Approaches)
SITE NAME # DWELLINGS W/ COMPROMISED ACCESS
1
Shore Acres 167
2
Normandy Beach 153
3
Seawood Harbor (Including Snake Road) 136
4
Island Drive/Island Court 46
5
Baywood 38
6
Sandy Point 19
7
Princeton Ave (Bayfront) 16
8
Tunes Brook
9
Swan Point 8
10
Bay Harbor 8
11
Cherry Quay (Seagoin Rd) 2
12
Vannote / Glenwood Pl. 2
13
Harbor Place
Impacted > 2.0’ – 3.4’ Flood Elevation (Long Term Design Approaches)
SITE NAME # DWELLINGS W/ COMPROMISED ACCESS
1
Shore Acres 345
2
Normandy Beach 198
3
Seawood Harbor (Including Snake Road) 136
4
Princeton Ave (Bayfront) 134
5
Baywood 67
6
Sandy Point 55
7
Island Drive/Island Court 46
8
Swan Point 37
9
Tunes Brook 30
10
Cherry Quay (Seagoin Rd) 23
11
Bay Harbor 11
12
Harbor Place 10
13
Vannote / Glenwood Pl. 7
COMMUNITY FLOODING IMPACT ASSESSMENT
Conceptual Flood Mitigation Design Approaches
Site Name Short Term Design Approaches (To Design Elevation < 2.0’) (Floods 1,500± hrs. per year*) Long Term Design Approaches (>2.0’ Design Elevation) (Floods 60± hrs. per year*)
Cherry Quay (Seagoin Road)
- Install Check Valves
- Install Check Valves
- Raise Roads / Driveways / etc.
- Raise Select Bulkheads
- Pump Stations
*USGS Mantoloking Tide Gage
RAISE ROADWAYS TO MITIGATE TIDAL FLOODING
- Improves vehicular access during normal tide events
- May require driveway / sidewalks / yard improvements
- Stormwater impacts/mitigation addressed with final design
- Need for neighborhood ‘buy in’
Proposed Raised Road Elevation Existing Road Elevation
RAISE ROADWAYS TO MITIGATE TIDAL FLOODING
INSTALL CHECK VALVES
Check Valve Bulkhead Inlets at Gutter Ground Level
W/O CHECK VALVE
Bulkhead Inlets at Gutter Ground Level
WITH CHECK VALVE
RAISE / STABLIZE SHORELINES
Examples: Bulkheads; Living Shorelines; Rock Revetments; etc.
CHERRY QUAY ONGOING AND NEXT STEPS
- Update topographic mapping
- Identify and pursue funding sources: USACE; FEMA; NJOEM; NJDOT
- Secure funding
- Identify and recommend Township Ordinance revisions for future design
standards
- Develop strategies, allocate funding and implement (design/permit/construct)
QUESTIONS / DISCUSSION
Presentation will be available at www.bricktownship.net/floodplaininformation Any additional questions may be submitted to:
publicmeetingquestions@bricktownship.net brickflooding@actengineers.com