Beverly Middle School Community Communication Plan School Community Presentation March 12, 2018 Agenda Technology 1:1 Access Grades 5 and 6 - Grades 7 and 8 Routines Pick up and Drop off Bus and parents


slide-1
SLIDE 1

Beverly Middle School

Community Communication Plan

School Community Presentation March 12, 2018

slide-2
SLIDE 2

Agenda

  • Technology

1:1 Access

Grades 5 and 6 - Grades 7 and 8

  • Routines

Pick up and Drop off

Bus and parents

Movement in the building

Transportation

  • Security

Design elements to address security

slide-3
SLIDE 3

Technology Beverly Middle School

Vision & Plan

slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6

Grade 5 Centerville took a look at this problem.....

  • Project Based Learning (PBL) Unit designed, developed and

implemented by Ms. Hopkins and Mr. Melanson.

  • Is there a better way for Amazon to pack material?
  • What is the problem? Why should they change?

○ Waste of cardboard! ○ Bigger boxes, need more trucks...waste of energy! ○ Waste of money....

  • The project: Design a box that efficiently contains a set of objects.

Present your results to the class and a panel of judges. ○ (Shhhhhh…..this was also a MATH unit on VOLUME)

slide-7
SLIDE 7

Configure the objects in an efficient way...

slide-8
SLIDE 8

Determine the volume required to fit the objects..

slide-9
SLIDE 9

Learn about volume from various online resources...

slide-10
SLIDE 10

Create a “net” or a pattern for the box...

slide-11
SLIDE 11

Use the pattern to cut out the box..

slide-12
SLIDE 12

Build the box!

slide-13
SLIDE 13

One final group project….

slide-14
SLIDE 14

Work on their group presentation...

slide-15
SLIDE 15

What drove this instruction?

  • A. Technology
  • B. Learning how to do the math to determine volume
  • C. An authentic real world type question

More Authentic = More Engagement = More Learning PS: Collaboration was another key skill practiced in this unit.

slide-16
SLIDE 16

Technology ….

  • Is a tool to support rigorous, personalized,

projects based instruction.

  • Should be there when you need it for

learning.

slide-17
SLIDE 17

Middle School Technology Plan: 1 to 1 Access

  • Wireless, high speed internet capability, including outdoor

education area

  • Combination of iPads and Chromebooks
  • Decision needs to be based on very latest versions
  • 1 to 1 model in grades 7 & 8

District owned - not a lease program.

  • 16 devices per classroom in grades 5 & 6
  • Piloting both devices in a few classrooms now

“1 to 1 devices in a classroom is a game changer” (from a piloting teacher)

slide-18
SLIDE 18

Extensive Presentation & Sound

  • 65” LCD flat screen monitors on carts with Apple TV

in classrooms

  • LED Projectors available for classrooms
  • 80” LCD flat screen monitors in MakerSpaces and

some other rooms

  • Projection in both cafeterias for large groups
  • Digital signage throughout the school
  • Voice amplification system in every classroom
slide-19
SLIDE 19

Media Maker Space

  • A small studio space in the library
  • Equipped with green screen and media production

equipment for student projects

  • Designed by BevCam staff
  • Will also support a space in library to broadcasting

meeting

slide-20
SLIDE 20

Ongoing Technology Professional Development

  • Teachers access to iPads and Chromebooks since 2014

Training offered continuously on Google and creative use of both devices

  • Project Based Learning - Building teacher cohort #3 this summer

Makes extensive use of all technology

Many quality PBL units @ Middle School already

  • Discovery Education for grades 5 & 6 online Science and Social Studies

Summer institutes and workshops offered during the school year

  • Moodle LMS: Provides a digital hub for classroom resources
  • All of the above (and more!): enables project-based learning for

students

slide-21
SLIDE 21

Routines Beverly Middle School

slide-22
SLIDE 22

Bus and Parent Drop-off and Pick-up

  • Separation of cars and buses
  • Gated bus area
  • Separate parking area for staff
  • Traffic flow in and out on Balch and Cabot
slide-23
SLIDE 23
slide-24
SLIDE 24
slide-25
SLIDE 25

Grade Separation - Front Entrance

slide-26
SLIDE 26

Grade Separation - Main Corridor

slide-27
SLIDE 27

Grade Separation - Neighborhood Entrance

slide-28
SLIDE 28

Neighborhood

slide-29
SLIDE 29

Four C Focus

slide-30
SLIDE 30

Driving Question to Begin Grade 6

Driving Question: How can we build and maintain a community that fosters everyone’s hopes and dreams?

slide-31
SLIDE 31

Hopes and Dreams Displayed on Padlet in Classrooms

slide-32
SLIDE 32

Norms

slide-33
SLIDE 33

Accountable Talk

slide-34
SLIDE 34

Transportation

  • 2 or 3 Additional buses
  • Designated seating
  • New Bus Routes
  • New Director of Transportation
  • Late Bus
slide-35
SLIDE 35

Security Beverly Middle School

slide-36
SLIDE 36

Security

  • Design features to address security
  • Training for staff and students (New Building)
  • Building Wide Embedded Safety Features
slide-37
SLIDE 37

Safe & Secure Schools

Cohort Size: (Range 125-225) Site Approach and Layout Building Approach & Entry Controlled Access Points Internal Passive Observation Appropriately sized corridors and stairs

CEFPI

(Council of Educational Facilities Planners International)

CPTED

(Crime Prevention Through Environmental Design)

Security Standards referenced by: MSBA/US Dept. of Ed/MA Department of Ed.

Passive Security Active Security Security Policies

  • 1. Promulgation
  • 2. Implementation
  • 3. Practice
  • 4. Enforcement
  • 1. Intrusion Detection
  • 2. Closed Circuit Television (CCTV)
  • 3. Access Control
  • 4. Radio / telephone equipment

protocols 4 Principles

  • 1. Natural Surveillance: "See and be seen"
  • 2. Natural Access Control: Walkways, fences,

signage, and landscaping

  • 3. Territorial Reinforcement: "sphere of

influence" - Public areas clearly distinguished from private areas.

  • 4. Maintenance: "Broken Window Theory"

Design must create a good educational environment while providing for safety and security.

slide-38
SLIDE 38

March 12, 2018

Beverly Middle School - Beverly, MA

Proposed New Building

Gymnasium Library Media Auditorium Neighborhood Neighborhood Neighborhood Cafe Service Bus Depot

slide-39
SLIDE 39

March 12, 2018

Be Beverly Middle School - Beverly, MA

FLOOR 1

Pr Primary Building En Entrance ce Se Secondary Bu Building Entran ance GR GRADE DE 5 Learning Academy & Neighborhood Gy Gymnasium Be Below 5/ 5/6 6 Ca Cafe feteria Se Secondary St Student En Entry Points Ou Outdoor Ca Café fé’ Ban Band/ Mu Music Ki Kitchen/ Se Serving Ad Admin. Ar Art. Te Tech. CR CR SP SPED SC SCI Ma Maker Ma Maker CR CR CR CR CR CR. SC SCI CR CR SC SCI CR CR St Stage St Stair St Stair En Ensemble 5/ 5/6 Gy Gymnasium Me Mech. Room Room Bo Boys Lo Locker Rm Gi Girls Lo Locker Rm St Stair He Health CR CR

LOWER LEVEL

7/ 7/8 Gy Gymnasium Li Library y Me Media Ce Center CR CR. CR CR SP SPED Au Auditorium CR CR CR CR CR CR Ma Maker Te Teacher Wo Work. Ou Outdoor Le Learning En Environment

slide-40
SLIDE 40

March 12, 2018

Be Beverly Middle School - Beverly, MA

FLOOR 2

GR GRADE DE 6 Learning Academy & Neighborhood 5/ 5/6 6 Ca Cafe feteria Be Below Au Auditorium Be Below Te Teach. Pl Plan Gu Guidance/ Me Medical Te Tech. Be Below CR CR CR CR CR CR SP SPED SC SCI CR CR SC SCI CR CR CR CR St Stage Be Below St Stair Ma Maker Ma Maker SP SPED SP SPED Ban Band/Choral al Be Below St Stair SC SCI CR CR Ar Art Be Below Ma Maker CR CR SP SPED CR CR CR CR CR CR Li Library y Me Media Ce Center Be Below

slide-41
SLIDE 41

March 12, 2018

Be Beverly Middle School - Beverly, MA

FLOOR 3

GR GRADE DE 7 Learning Academy & Neighborhood Te Teach Wo Work/Admin. Ar Art Te Tech. Ma Maker Ma Maker Ma Maker SP SPED CR CR CR CR CR CR CR CR SC SCI CR CR SP SPED SC SCI CR CR CR CR CR CR SC SCI CR CR SP SPED CR CR CR CR 7/ 7/8 Ca Cafe feteria St Stair Ki Kitchen Se Serving Ar Area St Stair

slide-42
SLIDE 42

March 12, 2018

Be Beverly Middle School - Beverly, MA

FLOOR 4

GR GRADE DE 8 Learning Academy & Neighborhood 7/ 7/8 8 Ca Cafe feteria Be Below Te Teach. Wo Work CR CR CR CR CR CR SP SPED SC SCI Ma Maker CR CR CR CR SP SPED SC SCI CR CR CR CR SC SCI St Stair St Stair Ma Maker Ma Maker SP SPED Roof Roof Roof Roof Roof Roof Roof Roof Roof Roof CR CR CR CR CR CR.

slide-43
SLIDE 43

Communication Plan – Timeline of Meetings

  • September Kickoff - Showcase Building Design at Elementary Schools
  • October 30 - School Community (Welcome Fourth and Fifth Grade

Parents/Guardians) at Briscoe

  • January 8 - Program of Studies at Briscoe
  • March 12 - Procedures, Routines and Security at Briscoe
  • July/August - Open House at Beverly Middle School