Beverly Middle School Opening September 2018 Communication Plan - - PowerPoint PPT Presentation
Beverly Middle School Opening September 2018 Communication Plan - - PowerPoint PPT Presentation
Beverly Middle School Opening September 2018 Communication Plan Timeline of Meetings September Kickoff - Showcase Building Design at Elementary Schools October 30 - School Community (Welcome Fourth and Fifth Grade) at Briscoe
Communication Plan – Timeline of Meetings
- September Kickoff - Showcase Building Design at Elementary Schools
- October 30 - School Community (Welcome Fourth and Fifth Grade) at
Briscoe
- January 8 - Program of Studies at Briscoe
- March 12 - Procedures, Routines and Security at Briscoe
- Open House** at Beverly Middle School when the building is complete
February 10, 2016
Beverly Middle School - Beverly, MA
Guiding Design Principles
Ever er Evolv lvin ing Growth Mindset et Safe Place e to Learn From Mistakes kes Flexib exible le and Adaptable le Minds and Spaces Promotes es Develo elopmen ment of Resili silien ency cy High Expectat atio ions School l Without Walls 21 21st
st century school
Inspir ires es Creativity ity Indoor/Outdoor Connect ctio ions Experien ential l Learnin ing Exten ended ed Day Use Belongin ing and Ownersh ship ip Personaliz alization of Instructio ion Universal Design: They’re ALL Our Kids Its Your Space, Your Responsib sibil ilit ity Communit ity Cohesi sion Hubs of Communit ity and Gathering Small l School l Communit ities, ies, Large e School l Pride Teamin ing Small l School l Learnin ing Envir ironmen ments Belongin ing and Ownersh ship ip Part of Somethin ing Larger
February 10, 2016
Beverly Middle School - Beverly, MA
View From Cabot Street
June 2017 August 2017
February 10, 2016
Beverly Middle School - Beverly, MA
Cabot Street - Main Entrance Plaza
February 10, 2016
Beverly Middle School - Beverly, MA
Main Lobby
February 10, 2016
Beverly Middle School - Beverly, MA
Main Lobby / Library Media
- Transparency (Library/Balcony)
- Student activity on Display
- Student Galleries
- Branding
- Natural Daylighting
February 10, 2016
Beverly Middle School - Beverly, MA
February 10, 2016
Beverly Middle School - Beverly, MA
FLOOR 1
Primary Buildin ing Entran ance ce Gymnasiu sium Below 5/6 Cafet eter eria ia Band/ Music Kitchen en/ Servin ing Admin. Art. Stage Stair Stair Ensem emble le Library Media Center er Auditoriu ium Teacher er Work. Outdoor Learnin ing Envir ironmen ent Neighborhood Maker Neighborhood Neighborhood Maker Maker Tech
February 10, 2016
Beverly Middle School - Beverly, MA
FLOOR 1
Primary Buildin ing Entran ance ce Gymnasiu sium Below 5/6 Cafet eter eria ia Band/ Music Kitchen en/ Servin ing Admin. Art. Stage Stair Stair Ensem emble le Auditoriu ium Teacher er Work. Outdoor Learnin ing Envir ironmen ent Neighborhood Maker Neighborhood Neighborhood Maker Maker Tech Library Media Center er Connection to Outdoor Learning Environment
February 10, 2016
Beverly Middle School - Beverly, MA
Library Media Center
- Indoor/Outdoor Connections
- Natural Daylighting
- Adaptable Space
Small/Large Group, Meeting Space/ Research / Instruction / Individual reading
- Display space for material/student work
Library/ Media Center
June 2017 August 2017
Win indow wal walls have ave bee been and and are are co conti tinuing to to be be ins install lled
February 10, 2016
Beverly Middle School - Beverly, MA
Cafeteria / Student Center
- Indoor/Outdoor Connections
- Natural Daylighting
- Continuation of Maker/Builder Space
- Display space for material/student work
- Instruction area
- Neighborhood team meeting area
February 10, 2016
Beverly Middle School - Beverly, MA
Cafeteria / Student Center – View from balcony
- Indoor/Outdoor Connections
- Natural Daylighting
- Continuation of Maker/Builder Space
- Display space for material/student work
- Instruction area
Level 1 Cafeteria
June 2017 August 2017
All ll con concrete floo loor slab slabs are are ins installe led an and fra raming on n fir irst floo loor is is
- ng
- ngoing al
along with with mec echanical, elec electrical, an and pl plumbing.
February 10, 2016
Beverly Middle School - Beverly, MA
Maker / Builder Space – Neighborhood
February 10, 2016
Beverly Middle School - Beverly, MA
Outdoor Learning Environment
- Educational Advantages:
- Outdoor amph
phithea heater
- Exhi
hibi bit and work areas
- Outdoor classroom
sroom space
- Outdoor proj
- ject
ect space e – extension of maker/builder space
- Examples……
- Science: (Raised planting
beds, testing cars in physics projects, heat transfer, engineering elements: pulleys, planes, etc.)
- Humanities: (Socratic
Debate, drama, poetry, Greek myths)
- Arts: (3D installations,
sculpture, etc.)
- Maintain a secure outdoor environment
- Defined
ned pathwa hway y from drop off area to building entry
- Varying elevations of “Educational Zones”: more
clearly defined areas
- Direct access from Cafet
eter eria
- Easy access from centralize
zed d circulat ation
- n stairs
s for all grade levels
- Greater potential for separate structure
ured d communi nity y use
February 10, 2016
Beverly Middle School - Beverly, MA
Outdoor Learning Environment – Cafeteria / Library Media Center
Communication Plan – Timeline of Meetings
- September Kickoff - Showcase Building Design at Elementary Schools
- October 30 - School Community (Welcome Fourth and Fifth Grade) at
Briscoe
- January 8 - Program of Studies at Briscoe
- March 12 - Procedures, Routines and Security at Briscoe
- Open House** at Beverly Middle School when the building is complete
October 30, 2017 - School Community Set-Up
- Building Progress Update
- Welcome grades 4&5 - what to anticipate as you transition to Middle
School
- Organization of grade levels
- Potential Offerings
- Updated Photos
January 8, 2018 - Program of Studies
- Technology
- Schedule
- Routines - Lunch/Recess
- A Typical Day
- Extra-Curricular Offerings
March 12, 2018-Procedures, Routines and Security
- Arrival/Dismissal
- Transportation Routines/Procedure
- Security Inside and Outside Facility
- Traffic Flow
Designed by: Heidi Schultz