" (BERWYN) ! 16TH ST. Legend 1600 7200 7300 - - PDF document

berwyn 16th st legend 1600 7200 7300 partially or fully
SMART_READER_LITE
LIVE PREVIEW

" (BERWYN) ! 16TH ST. Legend 1600 7200 7300 - - PDF document

VILLAGE OF FOREST PARK COOK COUNTY, 7200 7600 ) " (RIVER FOREST) ILLINOIS 7300 VILLAGE LIMITS " ) C. & N.W. RR 00 00 7500 7400 . B E R V A O W E L N C A ! R V I C E FRANKLIN ST. .


slide-1
SLIDE 1 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! " ) " ) " ) " ) EISENHOWER EXPY HARLEM AVE. CIRCLE AVE. VILLAGE LIMITS VILLAGE LIMITS VILLAGE LIMITS VILLAGE LIMITS

00 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600

MADISON ST. 16TH ST.

(OAK PARK) (RIVER FOREST) 00 100 200 300 (BERWYN) 7200 7300 7400 7500 7600 7700 7800 800 900 1000 1100 1200 700 500 400 7600 7500 7400 7300 7700 7800 7900 8400 8400 600

I N D I A N A HAR BOR B EL T RR

å å å å å å

HARLEM AVE. L A T H R O P A V E . DES PLAINES AVE.

7200 7200 7300 7400 7500 7700

PARK DISTRICT OF FOREST PARK
  • C. & N.W. RR
JACKSON BLVD. JACKSON BLVD.

7400 (NORTH RIVERSIDE)

VILLAGE LIMITS VILLAGE LIMITS

(MAYWOOD)

GROVE LN. (PRIVATE) CERMAK RD. INDUSTRIAL DR. D E S P L A I N E S A V E .

² ³

RANDOLPH ST. 1ST AVE. CIRCLE AVE. DES PLAINES AVE. ROOSEVELT RD. ADAMS ST. DIXON ST. ELGIN AVE. BELOIT AVE. HANNAH AVE.

DUNLOP AVE.

THOMAS AVE. LEHMER ST. FRANKLIN ST. LATHROP AVE. FERDINAND AVE. MARENGO AVE. 15TH ST. TROOST AVE. VAN BUREN ST. B R O W N A V E . MONROE ST. POLK ST. YUBA ST. ROCKFORD AVE. WILCOX ST. YORK ST. WASHINGTON ST. BELVIDERE AVE. WARREN AVE. BERGMAN CT. BURKHARDT CT. LINCOLN CT. ELGIN AVE. FERDINAND AVE. HARRISON ST. MARENGO AVE. C I R C L E A V E . 14TH ST. HARVARD ST. 13TH ST. HANNAH AVE. MARENGO AVE. THOMAS AVE. LATHROP AVE. ELGIN AVE. FILLMORE ST. BELOIT AVE. HARLEM CTA STATION FOREST PARK CTA STATION

D E S P L A I N E S R I V E R

0.25 0.5 0.125 Miles

"

VILLAGE OF FOREST PARK

COOK COUNTY, ILLINOIS

INFRASTRUCTURE IMPROVEMENTS FROM 2005 - 2013

Legend

Legend

PARTIALLY OR FULLY FUNDED BY VIP NON-VIP FUNDED PROJECT

Document Path: N:\FORESTPARK\0023\BG061\GIS\Exhibits\Infrastructure Assessment Funding.mxd
slide-2
SLIDE 2

Amount Fund Share Fund 2005

Village Improvement Program Phase 1 5,650,000 $

  • $

5,650,000 $ VIP CDBG Alley Program 97,000 $ 85,000 $ CDBG 12,000 $ VIP 50/50 Sidewalk Program 20,000 $ 10,000 $ MATCH 10,000 $ VIP Year Total 5,767,000 $ 95,000 $ 5,672,000 $

2006

Village Improvement Program Phase 2 4,150,000 $

  • $

4,150,000 $ VIP CDBG Alley Program 287,000 $ 82,000 $ CDBG 205,000 $ VIP 50/50 Sidewalk Program 20,000 $ 10,000 $ MATCH 10,000 $ VIP Year Total 4,457,000 $ 92,000 $ 4,365,000 $

2007

Lathrop Resurfacing 157,000 $ 116,000 $ LAPP 41,000 $ VIP Wilcox Traffic Signal Modification 11,000 $

  • $

11,000 $ VIP CDBG Alley Program 109,000 $ 75,000 $ CDBG 34,000 $ VIP 50/50 Sidewalk Program 70,000 $ 40,000 $ MATCH 30,000 $ VIP Year Total 347,000 $ 231,000 $ 116,000 $

2008

Patching Program 192,000 $

  • $

192,000 $ VIP CDBG Alley Program 71,000 $ 70,000 $ CDBG 1,000 $ VIP 50/50 Sidewalk Program 24,000 $ 10,000 $ MATCH 14,000 $ VIP Year Total 287,000 $ 80,000 $ 207,000 $

2009

Jackson Reconstruction 1,143,000 $ 1,085,000 $ STP 58,000 $ VIP Harvard Reconstruction 2,910,000 $ 1,993,000 $ HPP/STP 917,000 $ VIP/WATER DesPlaines Resurfacing 1,278,000 $ 1,260,000 $ IDOT 18,000 $ VIP Roosevelt Resurfacing (W.of Desplaines) 1,870,000 $ 1,870,000 $ IDOT

  • $

North Park Wall 20,000 $

  • $

20,000 $ VIP 1200 Elgin-Harlem Alley 99,000 $ 34,000 $ DEVELOPER 65,000 $ VIP CDBG Alley Program 137,000 $ 63,000 $ CDBG 74,000 $ VIP 50/50 Sidewalk Program 32,000 $ 15,000 $ MATCH 17,000 $ VIP Year Total 7,489,000 $ 6,320,000 $ 1,169,000 $

2010

Brown Street TIF (Franklin St. & Alleys) 1,562,000 $ 1,562,000 $ TIF

  • $

Greenberg 276,000 $ 276,000 $ ERP

  • $

Parking Lots (Ferd./ Beloit/ Randolph) 300,000 $ 300,000 $ DCEO

  • $

Madison Brick Repairs 30,000 $

  • $

30,000 $ VIP Fillmore Brick Repairs 10,000 $

  • $

10,000 $ VIP Randolph Water Service Transfer 61,000 $

  • $

61,000 $ WATER Green Alley (500 Ferdinand-Beloit Alley) 150,000 $ 100,000 $ EECBG 50,000 $ VIP CDBG Alley Program 113,000 $ 90,000 $ CDBG 23,000 $ VIP Year Total 2,502,000 $ 2,328,000 $ 174,000 $

2011

Harrison Resurfacing 520,000 $ 416,000 $ LAPP 104,000 $ VIP Industrial Drive 672,000 $

  • $

672,000 $ VIP Parking Lot Sealcoating 46,000 $

  • $

46,000 $ VIP Madison Pedestrian Push Buttons 38,000 $ 34,000 $ HSIP 4,000 $ VIP CDBG Alley Program 128,000 $ 90,000 $ CDBG 38,000 $ VIP 50/50 Sidewalk Program 30,000 $ 10,000 $ MATCH 20,000 $ VIP Year Total 1,434,000 $ 550,000 $ 884,000 $

2012

Circle Resurfacing 750,000 $ 600,000 $ LAPP 150,000 $ VIP Sewer Rehabilitation Project 750,000 $ 750,000 $ IKE

  • $

Desplaines WaterMain 220,000 $

  • $

220,000 $ WATER Green Alley (50 Elgin-Harlem) 104,000 $ 104,000 $ TIF

  • $

CDBG Alley Program 200,000 $ 107,000 $ CDBG 93,000 $ VIP Year Total 2,024,000 $ 1,561,000 $ 463,000 $

2013

Alley Improvements 640,000 $

  • $

640,000 $ VIP Pavement Marking Program 28,000 $

  • $

28,000 $ VIP CDBG Alley Program 136,000 $ 136,000 $ CDBG

  • $

Year Total 804,000 $ 136,000 $ 668,000 $

Totals 25,111,000 $ 11,393,000 $ 45% 13,718,000 $ 55%

Figures are rounded to nearest $1,000

2005 to 2013 Infrastructure Cost Summary

Project Reimbursement Local Match Year Construction Cost

slide-3
SLIDE 3 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! " ) " ) " ) " ) W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S EISENHOWER EXPY HARLEM AVE. CIRCLE AVE. VILLAGE LIMITS VILLAGE LIMITS VILLAGE LIMITS VILLAGE LIMITS

00 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600

MADISON ST. 16TH ST.

(OAK PARK) (RIVER FOREST) 00 100 200 300 (BERWYN) 7200 7300 7400 7500 7600 7700 7800 800 900 1000 1100 1200 700 500 400 7600 7500 7400 7300 7700 7800 7900 8400 8400 600

I N D I A N A HAR BOR B EL T RR

å å å å å å

HARLEM AVE. L A T H R O P A V E . DES PLAINES AVE.

7200 7200 7300 7400 7500 7700

PARK DISTRICT OF FOREST PARK
  • C. & N.W. RR
JACKSON BLVD. JACKSON BLVD.

7400 (NORTH RIVERSIDE)

VILLAGE LIMITS VILLAGE LIMITS

(MAYWOOD)

GROVE LN. (PRIVATE) CERMAK RD. INDUSTRIAL DR. D E S P L A I N E S A V E .

² ³

RANDOLPH ST. 1ST AVE. CIRCLE AVE. DES PLAINES AVE. ROOSEVELT RD. ADAMS ST. DIXON ST. ELGIN AVE. BELOIT AVE. HANNAH AVE.

DUNLOP AVE.

THOMAS AVE. LEHMER ST. FRANKLIN ST. LATHROP AVE. FERDINAND AVE. MARENGO AVE. 15TH ST. TROOST AVE. VAN BUREN ST. B R O W N A V E . MONROE ST. POLK ST. YUBA ST. ROCKFORD AVE. WILCOX ST. YORK ST. WASHINGTON ST. BELVIDERE AVE. WARREN AVE. BERGMAN CT. BURKHARDT CT. LINCOLN CT. ELGIN AVE. FERDINAND AVE. HARRISON ST. MARENGO AVE. C I R C L E A V E . 14TH ST. HARVARD ST. 13TH ST. HANNAH AVE. MARENGO AVE. THOMAS AVE. LATHROP AVE. ELGIN AVE. FILLMORE ST. BELOIT AVE. HARLEM CTA STATION FOREST PARK CTA STATION

D E S P L A I N E S R I V E R

0.25 0.5 0.125 Miles

"

VILLAGE OF FOREST PARK

COOK COUNTY, ILLINOIS

INFRASTRUCTURE ASSESSMENT STREET - WATER - STORM

Legend

Legend

S S

PROPOSED STORM SEWER

W W PROPOSED WATERMAIN

PAVEMENT CONDITION

GOOD AVERAGE FAIR POOR

Document Path: N:\FORESTPARK\0023\BG061\GIS\Exhibits\Infrastructure Assessment Streets.mxd

D R A F T D R A F T

slide-4
SLIDE 4 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! " ) " ) " ) " ) EISENHOWER EXPY HARLEM AVE. CIRCLE AVE. VILLAGE LIMITS VILLAGE LIMITS VILLAGE LIMITS VILLAGE LIMITS

00 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600

MADISON ST. 16TH ST.

(OAK PARK) (RIVER FOREST) 00 100 200 300 (BERWYN) 7200 7300 7400 7500 7600 7700 7800 800 900 1000 1100 1200 700 500 400 7600 7500 7400 7300 7700 7800 7900 8400 8400 600

I N D I A N A HAR BOR B EL T RR

å å å å å å

HARLEM AVE. L A T H R O P A V E . DES PLAINES AVE.

7200 7200 7300 7400 7500 7700

PARK DISTRICT OF FOREST PARK
  • C. & N.W. RR
JACKSON BLVD. JACKSON BLVD.

7400 (NORTH RIVERSIDE)

VILLAGE LIMITS VILLAGE LIMITS

(MAYWOOD)

GROVE LN. (PRIVATE) CERMAK RD. INDUSTRIAL DR. D E S P L A I N E S A V E .

² ³

RANDOLPH ST. 1ST AVE. CIRCLE AVE. DES PLAINES AVE. ROOSEVELT RD. ADAMS ST. DIXON ST. ELGIN AVE. BELOIT AVE. HANNAH AVE.

DUNLOP AVE.

THOMAS AVE. LEHMER ST. FRANKLIN ST. LATHROP AVE. FERDINAND AVE. MARENGO AVE. 15TH ST. TROOST AVE. VAN BUREN ST. B R O W N A V E . MONROE ST. POLK ST. YUBA ST. ROCKFORD AVE. WILCOX ST. YORK ST. WASHINGTON ST. BELVIDERE AVE. WARREN AVE. BERGMAN CT. BURKHARDT CT. LINCOLN CT. ELGIN AVE. FERDINAND AVE. HARRISON ST. MARENGO AVE. C I R C L E A V E . 14TH ST. HARVARD ST. 13TH ST. HANNAH AVE. MARENGO AVE. THOMAS AVE. LATHROP AVE. ELGIN AVE. FILLMORE ST. BELOIT AVE. HARLEM CTA STATION FOREST PARK CTA STATION

D E S P L A I N E S R I V E R

0.25 0.5 0.125 Miles

"

VILLAGE OF FOREST PARK

COOK COUNTY, ILLINOIS

INFRASTRUCTURE ASSESSMENT ALLEYS

Legend

Legend

PAVEMENT CONDITION

GOOD AVERAGE FAIR POOR

Document Path: N:\FORESTPARK\0023\BG061\GIS\Exhibits\Infrastructure Assessment Alley.mxd

D R A F T D R A F T

slide-5
SLIDE 5 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! " ) " ) " ) " ) S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W EISENHOWER EXPY HARLEM AVE. CIRCLE AVE. VILLAGE LIMITS VILLAGE LIMITS VILLAGE LIMITS VILLAGE LIMITS

00 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600

MADISON ST. 16TH ST.

(OAK PARK) (RIVER FOREST) 00 100 200 300 (BERWYN) 7200 7300 7400 7500 7600 7700 7800 800 900 1000 1100 1200 700 500 400 7600 7500 7400 7300 7700 7800 7900 8400 8400 600

I N D I A N A HAR BOR B EL T RR

å å å å å å

HARLEM AVE. L A T H R O P A V E . DES PLAINES AVE.

7200 7200 7300 7400 7500 7700

PARK DISTRICT OF FOREST PARK
  • C. & N.W. RR
JACKSON BLVD. JACKSON BLVD.

7400 (NORTH RIVERSIDE)

VILLAGE LIMITS VILLAGE LIMITS

(MAYWOOD)

GROVE LN. (PRIVATE) CERMAK RD. INDUSTRIAL DR. D E S P L A I N E S A V E .

² ³

RANDOLPH ST.

2014 SEALCOAT CTA PARKING LOT DESPLAINES AVENUE SIDEWALK

TBD T B D 2014 TBD TBD TBD TBD TBD TBD 2 1 4

1ST AVE. CIRCLE AVE. DES PLAINES AVE. ROOSEVELT RD. ADAMS ST. DIXON ST. ELGIN AVE. BELOIT AVE. HANNAH AVE.

DUNLOP AVE.

THOMAS AVE. LEHMER ST. FRANKLIN ST. LATHROP AVE. FERDINAND AVE. MARENGO AVE. 15TH ST. TROOST AVE. VAN BUREN ST. B R O W N A V E . MONROE ST. POLK ST. YUBA ST. ROCKFORD AVE. WILCOX ST. YORK ST. WASHINGTON ST. BELVIDERE AVE. WARREN AVE. BERGMAN CT. BURKHARDT CT. LINCOLN CT. ELGIN AVE. FERDINAND AVE. HARRISON ST. MARENGO AVE. C I R C L E A V E . 14TH ST. HARVARD ST. 13TH ST. HANNAH AVE. MARENGO AVE. THOMAS AVE. LATHROP AVE. ELGIN AVE. FILLMORE ST. BELOIT AVE. HARLEM CTA STATION FOREST PARK CTA STATION

D E S P L A I N E S R I V E R

2018 2 1 6 2 1 7 2 1 5 2016 2016

0.25 0.5 0.125 Miles

"

VILLAGE OF FOREST PARK

COOK COUNTY, ILLINOIS

5 YEAR INFRASTRUCTURE PLAN (2014-2018) IMPROVEMENTS

Legend

W W

PROPOSED WATERMAIN

S S S PROPOSED STORM SEWER

PAVEMENT RECONSTRUCTION/RESURFACING YEAR

2 1 4 2 1 5 2 1 6 2 1 7 2 1 8

ALLEY IMPROVEMENT PROGRAM

YEARS TBD

Document Path: N:\FORESTPARK\0023\BG061\GIS\Exhibits\5 Year Infrastructure Plan 2014-2018.mxd

D R A F T D R A F T

slide-6
SLIDE 6

2014 1,390,000 $ 780,000 $ 400,000 $ 200,000 $ 10,000 $

Desplaines Avenue Sidewalk East side from 19th to Cemetery Entrance north of 22nd 50,000 $ 50,000 $ 2014 Street Patching Program Street Patching at various locations 250,000 $ 250,000 $ 2014 Alley Improvement Program Reconstruct 3 Alleys 360,000 $ 360,000 $ Traffic Calming Devices At various locations 70,000 $ 70,000 $ Sealcoat CTA Parking Lot Sealcoat parking lot on VanBuren adjacent to CTA station 30,000 $ 30,000 $ Roosevelt Road Streetscape Planning Desplaines Avenue to Harlem Avenue 200,000 $ 200,000 $ Sewer System Evaluation Study Evaluate system and prepare separation plan and approach 150,000 $ 150,000 $ Lathrop Ave Water Main 800 Block Lathrop water main with resurfacing 250,000 $ 250,000 $ 50/50 Sidewalk Program Various Sidewalks 30,000 $ 20,000 $ 10,000 $ Resident Match

2015 3,765,000 $ 855,000 $ 500,000 $

  • $

2,410,000 $

Madison Street Streetscape Van Buren Avenue to Desplaines Avenue 2,800,000 $ 400,000 $ 2,400,000 $ ITEP/STP/ River Forest Match Madison Street Watermain Van Buren Avenue to Desplaines Avenue 500,000 $ 500,000 $ 2015 Alley Improvement Program Reconstruct 3 Alleys 435,000 $ 435,000 $ 50/50 Sidewalk Program Various Sidewalks 30,000 $ 20,000 $ 10,000 $ Resident Match

2016 8,037,000 $ 1,131,000 $ 350,000 $ 3,489,000 $ 3,067,000 $

Madison Street Resurfacing Desplaines Avenue to Harlem Avenue 1,090,000 $ 323,000 $ 767,000 $ STP Roosevelt Road Streetscape Desplaines Avenue to Harlem Avenue 5,779,000 $ 3,489,000 $ 2,290,000 $ IDOT MATCH 400 & 500 Hannah Reconstruction Road reconstruction, water upgrades. 910,000 $ 560,000 $ 350,000 $ 2016 Alley Improvement Program Reconstruct 2 Alleys 228,000 $ 228,000 $ 50/50 Sidewalk Program Various Sidewalks 30,000 $ 20,000 $ 10,000 $ Resident Match

2017 1,530,000 $ 1,020,000 $ 500,000 $

  • $

10,000 $

1000 & 1100 Dunlop Reconstruction Road reconstruction, water & sewer upgrades 1,500,000 $ 1,000,000 $ 500,000 $ 50/50 Sidewalk Program Various Sidewalks 30,000 $ 20,000 $ 10,000 $ Resident Match

2018 1,530,000 $ 1,020,000 $ 500,000 $

  • $

10,000 $

800 & 900 Dunlop Reconstruction Road reconstruction, water & sewer upgrades 1,500,000 $ 1,000,000 $ 500,000 $ 50/50 Sidewalk Program Various Sidewalks 30,000 $ 20,000 $ 10,000 $ Resident Match

Total 16,252,000 $ 4,806,000 $ 2,250,000 $ 3,689,000 $ 5,507,000 $

Project Name Project Description Estimated Total Project Cost

5 Year Infrastructure Plan - Project List

TIF Fund Water Fund VIP Fund Grant Funds Grant Type