  2. GEOCONSULT GE OCONS ULT An Engineering & Consultancy Group in the disciplines of civil, structural and geotechnical engineering, soil & rock mechanics, geology, environmental & mining engineering � Private � Independent � International � More than 35 years of experience � More than 2000 projects in over 50 countries � Approx. 400 employees � Offices in: Argentina, Austria, Chile, Germany, India, Mexico, Romania, Singapore, Slovak Republic, Taiwan, USA 2 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  3. Organisation GC Group GE OCONS ULT Geoconsult Holding ZT GmbH Salzburg, Austria Geoconsult Wien ZT GmbH Geoconsult spol.sro Vienna, Austria Bratislava, Slovak Republic GC Buenos Aires S.A . GC Buenos Aires S.A . Geoconsult AS PTE LTD Geoconsult AS PTE LTD Singapore Buenos Aires, Argentina Geoconsult India Pvt. Ltd. Geoconsult ZT GmbH Gurgaon, India Salzburg, Austria GC Latinoamerica Ltda GC Sao Paulo GC Deutschland Santiago de Chile, Chile Sao Paulo, Brazil Freilassing, Germany 3 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  4. Areas GE OCONS ULT � Geotechnics & Tunnelling � Water & Environment � Structural Engineering � Transportation & Infrastructure � Geology & Hydrogeology � Instrumentation & Data Management Services: � Investigation Programs � Investigation Programs � Cost Estimating � Cost Estimating � Quality control � Quality control � Feasibility Studies � Environmental impact � Technical assistance � General Project Studies statements & assessments � Expert opinion � Preliminary Design � Bid evaluation � Training programs � Tender Design � Project management � Public participation � Tender Documents � Construction supervision model � Detailed Design � Geotechnical � Interpretation of Instrumentation & Geotechnical Data Monitoring 4 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  5. Selected References Railway GE OCONS ULT � HSR Munich – Verona, Brenner Northern Access Corridor, Austria � HSR Cologne – Frankfurt, Germany Tunnels Dernbach, Deesener Wald, Hellenberg � HSR Stuttgart – Ulm, Germany � HSR Stuttgart – Ulm, Germany Stuttgart 21, Wendlingen – Ulm (Contract PA2.1 “Alpvorlandtunnel”) � HSR Lahore – Rawalpindi, Pakistan � HSR Taipei – Kaoshiung, Taiwan C230, C240, C260 5 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  6. Selected References Railway GE OCONS ULT � Brenner Base Tunnel, Austria/Italy � Koralm Base Tunnel, Austria � Semmering Base Tunnel, Austria � Lyon – Torino Base Tunnel, France/Italy � Udhampur – Srinagar – Baramula Railway Pir Panjal Tunnel, India � Lowari Rail Tunnel Project, Pakistan � Ferrocarril Transandino Central, Argentina/Chile 6 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  7. Selected Railway Projects GE OCONS ULT HSR Graz – Klagenfurt, Austria incl. Koralm Base Tunnel Length: 32.8 km, excavation: TBM, partly NATM Czech Republic 49° 12° 14° 16° Slovakia Germany Linz St. Pölten Vienn a Austria Excavation area: 77 – 95 m 2 , 48° Eisen- stadt Salz burg Breg en z Hungaria Innsbruck 47° Graz Switzer- Klagenfurt land Italy max. overburden: 1,250 m; Lead consultant Slovenia Services for Main Tunnel & Exploration Measures: � Feasibility and route selection studies � Preliminary design and project � Environmental Impact Assessment incl.cost estimates on probabilistic data base, risk analysis, public relations procedure � Hydrogeological investigation, mapping and monitoring incl. analysis & data processing � Preparation of tender documents & tender design � Detailed design � Geotechnical services on site � Construction management 7 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  8. Selected Railway Projects GE OCONS ULT HSR Munich – Verona, Austria Czech Republic 16° 49° 12° 14° Slovakia Germany Linz St. Pölten Vienn a Austria 48° Brenner Northern Access Corridor Eisen- stadt Salzburg Breg en z Hungaria Innsbruck Graz 47° Switzer- Klagenfurt land Italy Section Kundl/Radfeld – Baumkirchen Slovenia Entire route: approx. 41 km Section length with GC involvement: approx. 27 km; incl. tunnels, troughs and underground sections Services: Preliminary project, public inquiry, Tender design and preparation of tender documents, detailed design, geotechnical services on site, construction supervision Mined tunnels: Brixlegg (7,420 m), Jenbach (4,793 m) and Stans/Terfens (8,500 m) Cut & Cover tunnels and troughs: Radfeld (appr. 790 m), Brixlegg East (appr. 1,600 m), Brixlegg West (River Inn crossing – appr. 1,800 m), Münster (approx. 1,200 m) 8 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  9. Selected Railway Projects GE OCONS ULT HSR Taipei – Kaoshiung, Taiwan Construction Lots C230, C240, C260 C230 : 8 tunnels, total length appr. 6 km C240: 11 tunnels, total length appr. 6 km C260: 7 tunnels, appr. 9 km; Geology: Soft rock; mined tunnels: NATM, pipe roof Services: Services: C230 & C240: BOT Tender preparation for the Client, Detailed Design for Mined Tunnels and C&C, Geological Mapping of Alignment and Portal Areas, Geotechnical Services during Construction, Design of Standard Cross-Sections, Geological and Geotechnical Training C260: BOT Tender preparation for the Client, Geological Mapping of Alignment and Portal Areas, CICE for Design (Contractor’s Independent Checking Engineer) 9 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  10. Selected References Subway Systems GE OCONS ULT Bochum, Germany (Contract 3/1, First application of side galleries and temporary invert) Munich, Germany (Contract Section of NATM in cohesionsless soils; Line 5/9, Contract Section 2, ground treatment) Essen, Düsseldorf, Frankfurt, Duisburg, Germany Pittsburgh, USA (Introduction of NATM to USA) Seoul Atlanta, Washington, USA Atlanta, Washington, USA Sao Paulo, Brazil (Introduction of NATM to Brazil) Rio de Janeiro, Brazil Barcelona, Spain Seoul, South Korea Busan, South Korea (Contract 1-9 and 1-3, Introduction of NATM to Korea) Hongkong, China (MRT Hongkong, Introduction of Singapore NATM to Hongkong) 10 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  11. Selected References Subway Systems GE OCONS ULT Caracas, Venezuela Singapore (Contract 105, Introduction of NATM to Singapore) Vienna, Austria (U3/10, U3/9, U3/4, U6/3, U3/14) Athen, Greece Taipei, Taiwan (Introduction of NATM to Taiwan) Ankara, Istanbul, Turkey Washington London Jubilee Line Extension, Great Britain London Jubilee Line Extension, Great Britain Genova, Rome, Italy Bangkok, Thailand Porto, Portugal Santiago de Chile, Chile New Delhi, India Budapest, Hungary Perth, Australia Bangkok Dubai, United Arab Emirates 11 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  12. Selected Projects Subway GE OCONS ULT Metro Santiago de Chile Participation in Lines 2, 4, 5 in several sections of the system, either for design services (all phases) and for construction supervision or technical assistance Length: more than 60 km of running tunnels Stations: more than 25 stations with excavation cross sections from 160 – 180 m 2 (partly C&C, partly mined) Examples of Geoconsult’s Services: Examples of Geoconsult’s Services: Extension of Line 2 from station Dorsal at Avenida Recoletta to Avenida Americo Vespuci Structures: Mined station (NATM) including access and platform tunnels; cross section area: 125 – 150 m 2 ; various emergency exits and ventilation shafts, single track running tunnel: 2.7 km; cross section area: 50 – 66 m 2 Services: General project, tender design and documents, detailed design, construction supervision. 12 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

  13. Selected Projects Subway GE OCONS ULT MRT Singapore North East Line, Contract 704 & 706 and Circle Line, Contract 822, 825, 854, 855, 856 Downtown Line, Contract C905, C916, C917, C918, C919, C921 Details NEL C704: Bored tunnels (EPB shield), single track, two tubes, inner diameter: 5.8 m two tubes, inner diameter: 5.8 m Length (C704): 2 x 2,5 km, 2 x 1,5 km Geoconsult’s Services Geotechnical assessment, evaluation of available data, assessment of design parameters as well as recommendations for construction, Detailed design, Design of bored tunnel precast concrete lining, Design of steel segments for bored tunnels at cross passage openings, Temporary support and permanent lining of cross passages and pump sumps, Assessment of surface settlements, Assessment of building damages 13 M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.