RAILWAY SOLUTIONS RAILWAY SOLUTIONS Development for Sustainable - - PowerPoint PPT Presentation

railway solutions railway solutions
SMART_READER_LITE
LIVE PREVIEW

RAILWAY SOLUTIONS RAILWAY SOLUTIONS Development for Sustainable - - PowerPoint PPT Presentation

A PASSION FOR A PASSION FOR RAILWAY SOLUTIONS RAILWAY SOLUTIONS Development for Sustainable Change in Ethiopia Consulting Engineering Analysis Systems 1 Introduction Molinari Rail We are an independent railway consulting


slide-1
SLIDE 1

A PASSION FOR RAILWAY SOLUTIONS A PASSION FOR RAILWAY SOLUTIONS

1

Development for Sustainable Change in Ethiopia Consulting · Engineering · Analysis · Systems

slide-2
SLIDE 2

We are…

  • an independent railway consulting and engineering company
  • specialized in all aspects of railway systems
  • active on all continents
  • headquarter in Winterthur, with subsidiaries in Austria, Germany,

Turkey and Malaysia

  • passionate about railway solutions – but we like all other modes
  • f transport as well !

2

Introduction Molinari Rail

slide-3
SLIDE 3

3

Why transportation is so relevant ?

A transport system is key for the social and economic development of a country. It enables … transportation of products and people … to boost economic development … connects regions and countries Key requirements for any transport system are:

  • Transportation should be efficient, economic, affordable, accessible for all
  • Transportation hubs should be located in areas with high transport demand
  • Transportation modes form an intermodal chain from start to end

Transportation Systems are enabler for economic and social development

Source: ERC

slide-4
SLIDE 4

Modern railway system consists of the following: Infrastructure

  • Railway line
  • Passenger Stations
  • Freight Stations
  • Maintenance workshop

Rolling stock (trains)

  • Locomotives (diesel or electric)
  • Passenger Coaches
  • Trains with distributed traction
  • Various types of freight wagons

4

Awash-Weldia Railway Project Railway Systems

Personnel & Operations

  • Management
  • Operation and Control
  • Operational staff
  • Ticketing and billing
  • Maintenance

The key challenges now are training, operation and maintenance

slide-5
SLIDE 5

5

Awash-Weldia Railway Project

Yapi Merkezi from Turkey is developing the project Largest commercially financed railway infrastructure project in Africa.

  • Start station: Awash, Ethiopia
  • Workshop: Kombolcha, Ethiopia
  • End station: Hara Gebeya, Ethiopia
  • Total over 420km, 6 stations

Molinari is responsible for Swiss and Austrian supplies (143 MUSD) Largest sub-suppliers include:

  • Power supply: ABB, CH
  • Catenary: Kummeler Matter, CH
  • Welding: Schlatter, CH
  • Workshop Equipment: Molinari, CH
  • Track switches: Voestalpine, AT
  • Bridges: MCE Bilfinger, AT
slide-6
SLIDE 6

6

  • Fully equipped maintenance facility in

Kombolcha

  • Molinari scope:
  • Concept design
  • Maintenance processes
  • Equipment specification
  • Equipment Delivery
  • 22 MUSD of equipment from

Switzerland, and EU countries

  • Project timeline:
  • Contract signature:

06/2014

  • Project Start:

11/2014

  • Project End:

11/2017 Project brief

Awash-Weldia Railway Project Maintenance Workshop

Coach Maintenance 0-03 Wagon Maintenance 0-01

Yapi Merkezi – Ethiopia Project

Preliminary Workshop Concept Locomotive Maintenance 0-02 Heavy Maintenance and Bogie removal/mounting

YZ25G Passenger car RW25G Dinner Passenger Car YZ25G Passenger car YZ25G Passenger car YZ25G Passenger car YZ25G Passenger car YZ25G Passenger car YZ25G Passenger car YZ25G Passenger car YZ25G Passenger car Electric Freight/Passenger Loco Electric Freight/Passenger Loco Electric Freight/Passenger Loco Electric Freight/Passenger Loco Electric Freight/Passenger Loco Electric Freight/Passenger Loco Daily maintenance storage 0-21 Daily maintenance storage 0-21 Machanical Workshop and Coupling 0-05 0-19 Electric Freight/Passenger Loco Electric Freight/Passenger Loco Pantograp h 0-09 Toilette 0-32

Floor

32t 16t

Entran ce Hall 0-33

Meeting 0-35 Undress Shower 0-39, 0-40, 0-41, 0-42, 0-32 Heating and Water Compressed Air 0-10 Stair Kitchen 1-22 Training 1-19

Page 1/2

V7

Underfloor wheel lathe 0-04 High level access High level access

16t

Bi-level Auto carrier Bi-level Auto carrier Bi-level Auto carrier Bi-level Auto carrier Bi-level Auto carrier

16t

Stai r Bi-level Auto carrier Electronic Workshops 0-06 Controll Room

Boogie Workshop Wheelset Workshop

Magnaflux Axles Brake Wshop 0-20 2.1 Mo bil e Bearing demoun ting equipmen t Cleaning Rolling Bearing Workshops 0-012 Painting

0-13 0-14 0-17 0-18 0-15 0-16

32t

3.1 Incoming Check

0-11

M a gn e t ic p a rti ce l in sp e cti
  • n
Supervisor 0-28 0-29 Supervisor 0-30 0-31 Daily maintenance storage 0-36 Daily maintenance storage 0-27 0-22 0-22 0-22 0-22 0-22 Supervi sor Superviso r 0-22 0-22
slide-7
SLIDE 7

7

Awash-Weldia Railway Project Other Equipment Supplies

Track Welding Machine, Schlatter, Switzerland Bridge Girder & Piers, MCE Bilfinger, Austria Bridge Installation, Ethiopia

Source: Yapi Merkezi 2015 Source: Yapi Merkezi 2015 Source: Yapi Merkezi 2015

slide-8
SLIDE 8

Major project challenges are:

  • Timetable
  • Documentation requirements
  • Cultural differences between

Switzerland-Turkey-Ethiopia

  • Specifics of transport to and

project implementation in Ethiopia

8

Awash-Weldia Railway Project Project Challenges vs. Opportunities

Major project opportunities are:

  • Facilitation of transport to and from Ethiopia
  • Create new work opportunities in railways and

the industry

  • Create opportunity for multilateral training

efforts between Europe/Turkey-Ethiopia

  • Counter proposal to the Chinese project

development methodology

  • Reduce economic migration

Sleeper Factory, Kombolcha Site Clearing, Kombolcha

Source: Yapi Merkezi 2015 Source: Yapi Merkezi 2015

slide-9
SLIDE 9

9

  • Close and open collaboration with

customer and stakeholder

  • Solid contractual structure
  • Professionalism and flexibility SERV
  • Support UBS
  • Reinsurance OeKB
  • Exchange rate insurance

Suc Succe cess ss Fac actor tors

Awash-Weldia Railway Project Key Success Factors for Project Setup

  • Costs for Financing

SME vs. Multinational Corp.

  • The usual suspects

Remaini emaining ng chall halleng enges es

Source: Wikimedia commons

slide-10
SLIDE 10

Commencement to work on key steps for a successful, safe and efficient operation of the Awash-Weldia Railway Line. Key workstreams:

  • Enabling local staff to carry out operations by:
  • Plan development
  • Training
  • Introduction of long-term training

concepts (Railway academy)

  • Enablement of railway company to
  • perate and maintain the project by
  • attracting business
  • expand and improve

10

Awash-Weldia Railway Project Future steps

The railway development supports regional development and connectivity, will boost trade and will create new industries and job opportunities.

slide-11
SLIDE 11

A PASSION FOR RAILWAY SOLUTIONS A PASSION FOR RAILWAY SOLUTIONS

11

Technologies for the most sustainable mode of transit Made by Molinari