AHTD Job 061275 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) P.E. Public Officials Meeting February 7, 2012 Location Map Location Map South Side of River North Side of River Lane Configuration Typical Section Bridge Selection


slide-1
SLIDE 1

AHTD Job 061275 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) P.E. Public Officials Meeting February 7, 2012

slide-2
SLIDE 2

Location Map

slide-3
SLIDE 3

Location Map

slide-4
SLIDE 4

South Side of River

slide-5
SLIDE 5

North Side of River

slide-6
SLIDE 6

Lane Configuration

slide-7
SLIDE 7

Typical Section

slide-8
SLIDE 8

Bridge Selection Study Goal of Study– Develop bridge types that accomplish two main objectives:

  • Minimize Bridge Closure Time
  • Most Cost Effective Structure Type
slide-9
SLIDE 9

Bridge Selection Study

slide-10
SLIDE 10

Bridge Selection Study

slide-11
SLIDE 11

Bridge Selection Study

slide-12
SLIDE 12

Bridge Selection Study

slide-13
SLIDE 13

Bridge Selection Study

slide-14
SLIDE 14

Bridge Selection Study

slide-15
SLIDE 15

Bridge Selection Study

slide-16
SLIDE 16

Bridge Selection Study Road User Cost The financial impact of the bridge closure

  • n the traveling public.
  • Takes into consideration expense of

traffic delays and additional miles traveled on alternate routes

slide-17
SLIDE 17

Bridge Selection Study

slide-18
SLIDE 18

Bridge Selection Study

slide-19
SLIDE 19

Bridge Selection Study

slide-20
SLIDE 20

Bridge Aesthetics

slide-21
SLIDE 21

Pedestrian Underpass at Ballpark

slide-22
SLIDE 22

Concept 1A

slide-23
SLIDE 23

Concept 1A – Closed Barrier

slide-24
SLIDE 24

Concept 1A – Open Rail

slide-25
SLIDE 25

Concept 1B

slide-26
SLIDE 26

Concept 1B – Closed Barrier

slide-27
SLIDE 27

Concept 1B – Open Rail

slide-28
SLIDE 28

Concept 2

slide-29
SLIDE 29

Concept 2 – Closed Barrier

slide-30
SLIDE 30

Concept 2 – Open Rail