Ca Capital ital Improveme rovement nt Pr Program
- gram
FY 2019-2024
Department of Transportation Michelle Pourciau Director
Pr Program ogram FY 2019-2024 Department of Transportation - - PowerPoint PPT Presentation
Ca Capital ital Improveme rovement nt Pr Program ogram FY 2019-2024 Department of Transportation Michelle Pourciau Director DOT Overview Challenges and Needs Current Program FY19 CIP Funding Request Justification
Department of Transportation Michelle Pourciau Director
system and the protection and enhancement of the public space.
ROADW DWAYS– to imp mprove 70% of our roadwa ways s to accept eptable able condition, dition, DOT T wo would d need $64 million ion per year SIDEW EWALK ALKS S – it wo would d cost t $10 millio ion n per year to imp mprove e the 1. 1.6 millio ion square re feet et of damaged ged sidewalks ks which ch is 2% of the tota
net etwor work ALLEYS - it wo would d cost st $5 million ion per year to imp mprove e the 82 thousan usand d square quare yar yards s of alley repairs s which h is 2% of the tota
etwor work BRIDGES DGES – to imp mprove our bridges ges, DOT T wo would d need an average erage annual al
$70 millio ion n for r the next six years TRAFFI FFIC C SIGNALS ALS - upgrad ades es to our existin sting g signal als s and equipmen quipment t wo would d cost st approxima ximatel ely $170 million ion
prehen ensiv sive e transp spor
tati tion
e are we we going? g?
prehen ensiv sive e asset t managemen agement t tools s
t is our inven entor
t condit ition ion is it in, when does it need repair/repla /replacement cement?
ed program am managemen agement t tools s
we effecti ectivel ely and effici icien ently tly manage? age?
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 $49,370 $36,457 $1,870 $0 $4,000 $4,000 $8,000 $7,350 $4,390 $7,000 $4,465 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $0 $10,000 $20,000 $30,000 $40,000 $50,000 $60,000
Total HUR Funds Available – FY08 to FY24
(in thousands)
FY19-24: Projected HUR Amounts
HER
Graphics Courtesy of NACTO
Footways (Sidewalks) and Alleys
Reconstruction of Sidewalks
Reconstruction of Alleys ADA Ramps
Downtown Bicycle Network Elements Citywide Resurfacing
Graphics Courtesy of NACTO
Loch Raven Watershed Culverts ($7.9M) In-kind Repair, Replacement & Resurfacing Central Ave Streetscape & Harbor Point Connector Bridge ($50M) Bike Lanes, Pedestrian Lighting, Landscaping, Furnishings Edmondson Ave Bridge over CSX and Gwynns Falls ($38M) Pedestrian Lighting
Harford Rd Bridge over Herring Run – Bike Lane, Pedestrian Lighting, Landscaping, Waterview/Annapolis/Maisel Street Bridges Over MD295 – Pedestrian Lighting I-83 Joint Repairs Phase II
Graphics Courtesy of NACTO
Broening Highway Bridge Replacement over Colgate Creek- TIGER Federal Grant Pedestrian Lighting, Street Lighting, Landscaping, Hawkins Point Bridge over CSXT Edison Highway Bridge Over Amtrak
Reconstruction
Park Circle Intersection Improvements ($5.7M) Pedestrian Lighting, Street Lighting, Traffic Signals Key Highway @ Light Street Intersection Improvements ($6.3M) Traffic Lights, Pedestrian Lighting, Extension of Jones Falls Trail, Landscaping
Graphics Courtesy of NACTO
Graphics Courtesy of NACTO
Reconstruction
Geometric Improvements Phase II : Frankford @ Hamilton and Frankford @ Corse Signal Reconstruction
Streetscape
Belair Road Complete Streets (Belair & Frankford Ave Node)
Resurfacing Highways
Transportation Plan Baseline Hanover Street Bridge - EIS Druid Park Lake Drive Big Jump Harford Road
CCTV and Signal Rewiring Citywide Phase I Traffic Signal System Upgrade
Graphics Courtesy of NACTO
Service Request Repair Program – $7M Inspection and Repair Program - $7M System Improvements Program - $13M Manhole Security Program - $.5M Professional and Technical Services Program - $4M
LED Upgrades – Currently 50% Complete and
B’ More Bright – 6,000 new lights. Installation through 2019
IMPLEMENTATION TOOLS CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-641 Citywide Transportation Plan $ - $ - $ 400 508-378 Capital Project Delivery Services $ 675 $ 500 $ 825 527-044 Asset Management $ 250 $ - $ 250 LOCAL REHABILIATION CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-465 Curb Repair-Slab Repair - ADA Ramps Upgrades Citywide $ - $ - $ 100 504-100 Sidewalk Reconstruction $ - $ - $ 245 504-200 Alley Reconstruction $ - $ - $ 250 508-029 Materials and Compliance Testing $ - $ - $ 300 MULTI-MODAL CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-019 Citywide Bike Infrastructure $ - $ 500 $ 125 BRIDGES CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR None $ - $ - $0
(In – Thou housan sands ds)
ROADWAY REHABILITATION CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-044 Federal Routes Reconstruction JOC - NE $ - $ 1,710 $ 430 508-046 Federal Routes Reconstruction JOC - NW $ - $ 1,710 $ 430 508-051 Federal Routes Reconstruction JOC - SW $ - $ 1,710 $ 430 508-053 Federal Routes Reconstruction JOC - SE $ - $ 1,710 $ 430 508-072 Concrete Roadway Repairs $ - $ 4,800 $ 1,200 508-056 Citywide System Preservation $ - $ 2,500 $ 625 527-009 Greenmount Ave - 29th to 43rd $ - $ - $ 300 STUDIES CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-085 ADA Self Evaluation $ - $ - $ 250 508-899 Siting Evaluation-2601 Falls Road Facility $ - $ - $ 115 508-641 Planning Studies $ - $ - $ 100 TRAFFIC CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 512-005 TMC Upgrade $ - $ 800 $ 200 512-077 Traffic Signal Reconstruction $ 520 $ 6,060 $ 995 512-078 ITS Improvements Citywide $ - $ 5,000 $ 1,250 512-080 Traffic Safety Improvements $ - $ 3,000 $ 750 Sub-Total $ 1,445 $ 30,000 $10,000
(In – Thou housan sands ds)
(In – Thou
sands ds) FY 19 DOT CIP FUNDING REQUEST
COUNTY TRANSPORTATION BONDS FEDERAL HUR
TOTAL $ 15,000 $ 30,000 $ 10,000
COUNTY TRANSPORTATION BONDS ONLY CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 504-300 Reconstruct Tree Root Damaged Sidewalks $ 1,950 $ - $ - 506-754 Annual Urgent Needs Bridges Repairs $ 1,000 $ - $ - 514-002 Resurfacing JOC - Urgent Needs $ 2,305 $ - $ - 514-214 Resurfacing -- Northwest $ 2,075 $ - $ - 514-215 Resurfacing -- Southwest $ 2,075 $ - $ - 514-216 Resurfacing -- Southeast $ 2,075 $ - $ - 514-846 Resurfacing -- Northeast $ 2,075 $ - $ - Sub-Total $ 13,555 $ - $ -
Impl mplemen ementa tati tion
s - Citywid ywide e Transp spor
tati tion
n, Capit ital al Project ct Deliv iver ery Service ices, s, Asset t Managemen gement t (FY1 FY19 9 Tot
erall cost st saving ings of at least st 10% annual ally
ed on average age spendin ding g of $80 million ion per year, $8 million ion avera erage ge annual al savings ngs
sparency ncy
mmuni nity ty engagement gement processes sses
IMPLEMENTATION TOOLS CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-641 Citywide Transportation Plan $ - $ - $ 400 508-378 Capital Project Delivery Services $ 675 $ 500 $ 825 527-044 Asset Management $ 250 $ - $ 250
eline ine – Docume uments ts all existi sting ng condit itio ions, ns, uses and plans, s, includi uding ng land use and transpo sporta tati tion
ed elemen ents ts of neighb hbor
ns.
ic Outreach reach – Basel selin ine e pre resen enta tation tion and next t steps s developme elopment nt.
prehen ensiv sive e Transp spor
tati tion
izes all inp nputs ts as well as land use and movemen ement t projecti ctions
cribe ibe an end stat ate e vision.
GOVERNANCE
COST CONTROL PROJECT DELIVERY
Ac Acquire ire program/ am/pr proje ject ct management gement tools s and exper erti tise. se.
ustry accept epted ed hardware are and softw tware are
duling ng and contr trol
s defin initi tion
tise se
On-Time/ Time/On-Budg Budget et project ct deliver ery
GRAPHICS-COURTESY OF APPLIED PAVEMENT TECHNOLOGY
t are we responsible
t conditions ditions is it in?
t is the life-cy cycle cle replacem acement nt?
ing g requir quiremen ements ts
Local Rehabilitation tation – ADA, Side dewalk alks, s, Alley, , Material rials Comp mpliance nce (FY19 9 Tot
5 thousa usand) nd)
tica cal non-federa deral match h
zed d based on inpu nput t and condition
LOCAL REHABILIATION CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-465 Curb Repair-Slab Repair - ADA Ramps Upgrades Citywide $ - $ - $ 100 504-100 Sidewalk Reconstruction $ - $ - $ 245 504-200 Alley Reconstruction $ - $ - $ 250 508-029 Materials and Compliance Testing $ - $ - $ 300
Multi ti-Mo Modal dal (FY1 Y19 Tot
l = $ $625 5 thous usand) nd)
y net etwork k for multi ti modal purposes rposes
rrent nt locati tions ns being g designed gned or adjust usted ed
MULTI-MODAL CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-019 Citywide Bike Infrastructure $ - $ 500 $ 125
tre Stree eet t – Pac Paca Stree reet t to Fallsw sway
s Falls s Trail l - Calvert t Stre reet et to Mark rket et Place
ngton n Street t – Key Highw hway y to Fort Avenue
uid d Hill Par Park – Swan wan Drive e to Sisso sson n Stre reet et
ngton n Avenue e – Hollins ns Mark rket et to Pigtown Main n Stre reet et
d Avenue ue – Coldsp sprin ring Lane to Northe hern rn Par Parkwa way
ue – Roland d Avenue ue to Bellona na Avenue ue
taw Place – Drui uid d Par Park Lake Drive to Drui uid d Hill Avenue ue
eet t – Phase II – Eastern ern Avenue e to Boston
Stre reet et
Bridg dges es (FY19 9 Tot
$0)
equest est
er $100M wo worth h of rehabil habilitati itation/
eplace laceme ment t proj
ts curren ently ly funded ded
loping ongoi
ing strat ateg egy
BRIDGES CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR None $ - $ - $0
Roadwa way y Rehabilitati tation n (FY 19 Tot
$18 18 million) n)
t rated ed on condi dition
sess ssme ment nt eva valuati ation
y $1 in local match captur ures s $4 in federal eral aid
ROADWAY REHABILITATION CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-044 Federal Routes Reconstruction JOC - NE $ - $ 1,710 $ 430 508-046 Federal Routes Reconstruction JOC - NW $ - $ 1,710 $ 430 508-051 Federal Routes Reconstruction JOC - SW $ - $ 1,710 $ 430 508-053 Federal Routes Reconstruction JOC - SE $ - $ 1,710 $ 430 508-072 Concrete Roadway Repairs $ - $ 4,800 $ 1,200 508-056 Citywide System Preservation $ - $ 2,500 $ 625 527-009 Greenmount Ave - 29th to 43rd $ - $ - $ 300
Studi udies es (FY19 9 Tot
usand nd)
ess non non-federa derally y funde nded d require quireme ments nts
etermines rmines how to upgra rade de det eteri riora rated ed fa faciliti lities es
cific c planning nning studi udies es to prepa pare re for future ture capita tal requ quest sts
STUDIES CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-085 ADA Self Evaluation $ - $ - $ 250 508-899 Siting Evaluation-2601 Falls Road Facility $ - $ - $ 115 508-641 Planning Studies $ - $ - $ 100
Traffic c (FY19 9 Tot
18.6 6 million)
raded ded operati tion
l effici cien ency
zed d trans nsit movement nt
rnize zed d techno hnology
r stre reets ts
TRAFFIC CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 512-005 TMC Upgrade $ - $ 800 $ 200 512-077 Traffic Signal Reconstruction $ 520 $ 6,060 $ 995 512-078 ITS Improvements Citywide $ - $ 5,000 $ 1,250 512-080 Traffic Safety Improvements $ - $ 3,000 $ 750
DOT will be proacti
tive with
th a g greater r emp mphasi asis s on multi timoda
nspo portati tation n options ns. . DOT will have a r roadmap map for investme estment nt and impr mproveme ments nts. . DOT will use techno hnology y and best practi tice ces s to manage and prioriti ritize ze. . DOT will establish sh a p project ct manageme ment nt structur ructure to priorit ritize ze capita tal projec ects ts through ugh an asset t management nt approach. ch. DOT will be t transpare nsparent. nt.