Ca Capital ital Improveme rovement nt Pr Program ogram FY 2019-2024 Department of Transportation Michelle Pourciau Director DOT Overview Challenges and Needs Current Program FY19 CIP Funding Request Justification


slide-1
SLIDE 1

Ca Capital ital Improveme rovement nt Pr Program

  • gram

FY 2019-2024

Department of Transportation Michelle Pourciau Director

slide-2
SLIDE 2

DOT Overview Challenges and Needs Current Program FY19 CIP Funding Request Justification Summary - Moving Forward Questions

AGENDA

slide-3
SLIDE 3
  • A multimodal transportation agency responsible for providing a safe and sustainable transportation

system and the protection and enhancement of the public space.

MY HOUSE YOUR FRONT YARD

THE DEPARTMENT OF TRANSPORTATION IS…

slide-4
SLIDE 4

OUR PORTFOLIO

GROUNDED IN LAND USE CONSIDERS ALL NEEDS BUILT FROM PUBLIC INPUT

slide-5
SLIDE 5
slide-6
SLIDE 6

 ROADW DWAYS– to imp mprove 70% of our roadwa ways s to accept eptable able condition, dition, DOT T wo would d need $64 million ion per year  SIDEW EWALK ALKS S – it wo would d cost t $10 millio ion n per year to imp mprove e the 1. 1.6 millio ion square re feet et of damaged ged sidewalks ks which ch is 2% of the tota

  • tal

net etwor work  ALLEYS - it wo would d cost st $5 million ion per year to imp mprove e the 82 thousan usand d square quare yar yards s of alley repairs s which h is 2% of the tota

  • tal net

etwor work  BRIDGES DGES – to imp mprove our bridges ges, DOT T wo would d need an average erage annual al

  • f
  • f $70

$70 millio ion n for r the next six years  TRAFFI FFIC C SIGNALS ALS - upgrad ades es to our existin sting g signal als s and equipmen quipment t wo would d cost st approxima ximatel ely $170 million ion

CHALLENGES & NEEDS

slide-7
SLIDE 7

CHALLENGES & NEEDS

  • No compreh

prehen ensiv sive e transp spor

  • rta

tati tion

  • n plan
  • Where

e are we we going? g?

  • No compreh

prehen ensiv sive e asset t managemen agement t tools s

  • What

t is our inven entor

  • ry, what

t condit ition ion is it in, when does it need repair/repla /replacement cement?

  • Limited

ed program am managemen agement t tools s

  • How do we

we effecti ectivel ely and effici icien ently tly manage? age?

slide-8
SLIDE 8

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 $49,370 $36,457 $1,870 $0 $4,000 $4,000 $8,000 $7,350 $4,390 $7,000 $4,465 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $0 $10,000 $20,000 $30,000 $40,000 $50,000 $60,000

Total HUR Funds Available – FY08 to FY24

(in thousands)

FY19-24: Projected HUR Amounts

  • Federal match requirement
  • 70% of the $10M DOT HUR allocation must match federal dollars

INADEQUATE SUSTAINED FUNDING

slide-9
SLIDE 9

CURRENT PROGRAM (JAN-DEC 2018) – CONSTRUCT/INSTALL THIS YEAR

  • CIP
  • Local Rehabilitation
  • Multi - Modal
  • Bridges
  • Roadway Rehabilitation
  • Studies
  • Traffic
  • OTHER

HER

  • Conduit
  • Streetlights

Graphics Courtesy of NACTO

slide-10
SLIDE 10

LOCAL REHABILITATION

Footways (Sidewalks) and Alleys

 Reconstruction of Sidewalks

  • Inspire School Support- Cherry Hill walking Routes
  • Inspire School Support- Forest Park High Walking Routes

 Reconstruction of Alleys  ADA Ramps

MULTI-MODAL

 Downtown Bicycle Network Elements  Citywide Resurfacing

CONSTRUCT/INSTALL THIS YEAR

Graphics Courtesy of NACTO

slide-11
SLIDE 11

BRIDGES

 Loch Raven Watershed Culverts ($7.9M)  In-kind Repair, Replacement & Resurfacing  Central Ave Streetscape & Harbor Point Connector Bridge ($50M)  Bike Lanes, Pedestrian Lighting, Landscaping, Furnishings  Edmondson Ave Bridge over CSX and Gwynns Falls ($38M)  Pedestrian Lighting

 Harford Rd Bridge over Herring Run –  Bike Lane, Pedestrian Lighting, Landscaping,  Waterview/Annapolis/Maisel Street Bridges Over MD295 –  Pedestrian Lighting  I-83 Joint Repairs Phase II

Graphics Courtesy of NACTO

CONSTRUCT/INSTALL THIS YEAR

slide-12
SLIDE 12

BRIDGES (cont.)

 Broening Highway Bridge Replacement over Colgate Creek-  TIGER Federal Grant  Pedestrian Lighting, Street Lighting, Landscaping,  Hawkins Point Bridge over CSXT  Edison Highway Bridge Over Amtrak

ROADWAY REHABILITATION

Reconstruction

 Park Circle Intersection Improvements ($5.7M)  Pedestrian Lighting, Street Lighting, Traffic Signals  Key Highway @ Light Street Intersection Improvements ($6.3M)  Traffic Lights, Pedestrian Lighting, Extension of Jones Falls Trail, Landscaping

CONSTRUCT/INSTALL THIS YEAR

Graphics Courtesy of NACTO

slide-13
SLIDE 13

Graphics Courtesy of NACTO

ROADWAY REHABILITATION (cont.)

Reconstruction

 Geometric Improvements Phase II : Frankford @ Hamilton and Frankford @ Corse Signal Reconstruction

Streetscape

 Belair Road Complete Streets (Belair & Frankford Ave Node)

CONSTRUCT/INSTALL THIS YEAR

slide-14
SLIDE 14

ROADWAY REHABILITATION (cont.)

 Resurfacing Highways

  • Sector 1: NE ($2.5M)
  • Purlington Way-St Dunstans Rd to Northern Parkway
  • Tilbury Way-Tunbridge Rd to Taplow Rd
  • Sector 2: NW ($2.4M)
  • Chelsea Terr-Gwynn Falls Pkwy to Bonner Rd
  • Garrison Blvd-Belle Ave to Liberty Heights Ave
  • Sector 3: SW ($2.2M)
  • W Franklin St-Edmondson Ave to MLK Blvd
  • MLK Blvd. – S. Eutaw St to Pennsylvania Ave
  • Sector 4: SE ($2.5M)
  • N High St – Fallsway to Hillen St
  • President St – E. Fayette St to Fleet St

CONSTRUCT/INSTALL THIS YEAR

slide-15
SLIDE 15

Studies

 Transportation Plan Baseline  Hanover Street Bridge - EIS  Druid Park Lake Drive  Big Jump  Harford Road

Traffic

 CCTV and Signal Rewiring Citywide  Phase I Traffic Signal System Upgrade

Graphics Courtesy of NACTO

CONSTRUCT/INSTALL THIS YEAR

slide-16
SLIDE 16

Conduit

 Service Request Repair Program – $7M  Inspection and Repair Program - $7M  System Improvements Program - $13M  Manhole Security Program - $.5M  Professional and Technical Services Program - $4M

Street Lights

 LED Upgrades – Currently 50% Complete and

  • Ongoing. 100% complete in 2 years

 B’ More Bright – 6,000 new lights. Installation through 2019

CONSTRUCT/INSTALL THIS YEAR

slide-17
SLIDE 17

FY19 DOT CIP HUR, CTB, FEDERAL FUNDING REQUEST

IMPLEMENTATION TOOLS CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-641 Citywide Transportation Plan $ - $ - $ 400 508-378 Capital Project Delivery Services $ 675 $ 500 $ 825 527-044 Asset Management $ 250 $ - $ 250 LOCAL REHABILIATION CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-465 Curb Repair-Slab Repair - ADA Ramps Upgrades Citywide $ - $ - $ 100 504-100 Sidewalk Reconstruction $ - $ - $ 245 504-200 Alley Reconstruction $ - $ - $ 250 508-029 Materials and Compliance Testing $ - $ - $ 300 MULTI-MODAL CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-019 Citywide Bike Infrastructure $ - $ 500 $ 125 BRIDGES CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR None $ - $ - $0

(In – Thou housan sands ds)

slide-18
SLIDE 18

ROADWAY REHABILITATION CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-044 Federal Routes Reconstruction JOC - NE $ - $ 1,710 $ 430 508-046 Federal Routes Reconstruction JOC - NW $ - $ 1,710 $ 430 508-051 Federal Routes Reconstruction JOC - SW $ - $ 1,710 $ 430 508-053 Federal Routes Reconstruction JOC - SE $ - $ 1,710 $ 430 508-072 Concrete Roadway Repairs $ - $ 4,800 $ 1,200 508-056 Citywide System Preservation $ - $ 2,500 $ 625 527-009 Greenmount Ave - 29th to 43rd $ - $ - $ 300 STUDIES CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-085 ADA Self Evaluation $ - $ - $ 250 508-899 Siting Evaluation-2601 Falls Road Facility $ - $ - $ 115 508-641 Planning Studies $ - $ - $ 100 TRAFFIC CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 512-005 TMC Upgrade $ - $ 800 $ 200 512-077 Traffic Signal Reconstruction $ 520 $ 6,060 $ 995 512-078 ITS Improvements Citywide $ - $ 5,000 $ 1,250 512-080 Traffic Safety Improvements $ - $ 3,000 $ 750 Sub-Total $ 1,445 $ 30,000 $10,000

FY19 DOT CIP HUR, CTB, FEDERAL FUNDING REQUEST

(In – Thou housan sands ds)

slide-19
SLIDE 19

FY19 DOT CIP HUR, CTB, FEDERAL FUNDING REQUEST

(In – Thou

  • usan

sands ds) FY 19 DOT CIP FUNDING REQUEST

COUNTY TRANSPORTATION BONDS FEDERAL HUR

TOTAL $ 15,000 $ 30,000 $ 10,000

COUNTY TRANSPORTATION BONDS ONLY CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 504-300 Reconstruct Tree Root Damaged Sidewalks $ 1,950 $ - $ - 506-754 Annual Urgent Needs Bridges Repairs $ 1,000 $ - $ - 514-002 Resurfacing JOC - Urgent Needs $ 2,305 $ - $ - 514-214 Resurfacing -- Northwest $ 2,075 $ - $ - 514-215 Resurfacing -- Southwest $ 2,075 $ - $ - 514-216 Resurfacing -- Southeast $ 2,075 $ - $ - 514-846 Resurfacing -- Northeast $ 2,075 $ - $ - Sub-Total $ 13,555 $ - $ -

slide-20
SLIDE 20

JUSTIFICATION – PRIORITY PROJECTS

Impl mplemen ementa tati tion

  • n Tools

s - Citywid ywide e Transp spor

  • rta

tati tion

  • n Plan,

n, Capit ital al Project ct Deliv iver ery Service ices, s, Asset t Managemen gement t (FY1 FY19 9 Tot

  • tal = $2.9 million
  • n)
  • Overa

erall cost st saving ings of at least st 10% annual ally

  • Based

ed on average age spendin ding g of $80 million ion per year, $8 million ion avera erage ge annual al savings ngs

  • Greater transpar

sparency ncy

  • Commu

mmuni nity ty engagement gement processes sses

IMPLEMENTATION TOOLS CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-641 Citywide Transportation Plan $ - $ - $ 400 508-378 Capital Project Delivery Services $ 675 $ 500 $ 825 527-044 Asset Management $ 250 $ - $ 250

slide-21
SLIDE 21

COMPREHENSIVE TRANSPORTATION PLAN

  • Basel

eline ine – Docume uments ts all existi sting ng condit itio ions, ns, uses and plans, s, includi uding ng land use and transpo sporta tati tion

  • n related

ed elemen ents ts of neighb hbor

  • rhood
  • od plans.

ns.

  • Public

ic Outreach reach – Basel selin ine e pre resen enta tation tion and next t steps s developme elopment nt.

  • Compreh

prehen ensiv sive e Transp spor

  • rta

tati tion

  • n Vision
  • n Plan – Utilizes

izes all inp nputs ts as well as land use and movemen ement t projecti ctions

  • ns to prescr

cribe ibe an end stat ate e vision.

  • n.

JUSTIFICATION – PRIORITY PROJECTS

slide-22
SLIDE 22

GOVERNANCE

COST CONTROL PROJECT DELIVERY

CAPITAL PROJECT DELIVERY SERVICES

Ac Acquire ire program/ am/pr proje ject ct management gement tools s and exper erti tise. se.

  • Industr

ustry accept epted ed hardware are and softw tware are

  • Schedul

duling ng and contr trol

  • ls

s defin initi tion

  • n and experti

tise se

  • On

On-Time/ Time/On-Budg Budget et project ct deliver ery

JUSTIFICATION – PRIORITY PROJECTS

slide-23
SLIDE 23

ASSET MANAGEMENT

GRAPHICS-COURTESY OF APPLIED PAVEMENT TECHNOLOGY

  • What

t are we responsible

  • nsible for?
  • What

t conditions ditions is it in?

  • What

t is the life-cy cycle cle replacem acement nt?

  • Fundin

ing g requir quiremen ements ts

JUSTIFICATION – PRIORITY PROJECTS

slide-24
SLIDE 24

Local Rehabilitation tation – ADA, Side dewalk alks, s, Alley, , Material rials Comp mpliance nce (FY19 9 Tot

  • tal = $895

5 thousa usand) nd)

  • Criti

tica cal non-federa deral match h

  • Priori
  • ritize

zed d based on inpu nput t and condition

LOCAL REHABILIATION CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-465 Curb Repair-Slab Repair - ADA Ramps Upgrades Citywide $ - $ - $ 100 504-100 Sidewalk Reconstruction $ - $ - $ 245 504-200 Alley Reconstruction $ - $ - $ 250 508-029 Materials and Compliance Testing $ - $ - $ 300

JUSTIFICATION – LOCAL REHABILITATION

slide-25
SLIDE 25

LOCAL REHABILITATION

slide-26
SLIDE 26

Multi ti-Mo Modal dal (FY1 Y19 Tot

  • tal

l = $ $625 5 thous usand) nd)

  • Renewal of the use of the roadway

y net etwork k for multi ti modal purposes rposes

  • Curre

rrent nt locati tions ns being g designed gned or adjust usted ed

MULTI-MODAL CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-019 Citywide Bike Infrastructure $ - $ 500 $ 125

JUSTIFICATION – MULTI-MODAL

  • Centre

tre Stree eet t – Pac Paca Stree reet t to Fallsw sway

  • Jones

s Falls s Trail l - Calvert t Stre reet et to Mark rket et Place

  • Covingt

ngton n Street t – Key Highw hway y to Fort Avenue

  • Drui

uid d Hill Par Park – Swan wan Drive e to Sisso sson n Stre reet et

  • Arlingt

ngton n Avenue e – Hollins ns Mark rket et to Pigtown Main n Stre reet et

  • Roland

d Avenue ue – Coldsp sprin ring Lane to Northe hern rn Par Parkwa way

  • Melrose
  • se Avenue

ue – Roland d Avenue ue to Bellona na Avenue ue

  • Euta

taw Place – Drui uid d Par Park Lake Drive to Drui uid d Hill Avenue ue

  • Pot
  • tomac Stree

eet t – Phase II – Eastern ern Avenue e to Boston

  • n

Stre reet et

slide-27
SLIDE 27

MULTI-MODAL

slide-28
SLIDE 28

Bridg dges es (FY19 9 Tot

  • tal = $0)

$0)

  • $0 req

equest est

  • Over

er $100M wo worth h of rehabil habilitati itation/

  • n/rep

eplace laceme ment t proj

  • jects

ts curren ently ly funded ded

  • Developin

loping ongoi

  • ing fundin

ing strat ateg egy

BRIDGES CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR None $ - $ - $0

JUSTIFICATION - BRIDGES

slide-29
SLIDE 29

Roadwa way y Rehabilitati tation n (FY 19 Tot

  • tal = $

$18 18 million) n)

  • Lowest

t rated ed on condi dition

  • n asse

sess ssme ment nt eva valuati ation

  • Every

y $1 in local match captur ures s $4 in federal eral aid

ROADWAY REHABILITATION CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-044 Federal Routes Reconstruction JOC - NE $ - $ 1,710 $ 430 508-046 Federal Routes Reconstruction JOC - NW $ - $ 1,710 $ 430 508-051 Federal Routes Reconstruction JOC - SW $ - $ 1,710 $ 430 508-053 Federal Routes Reconstruction JOC - SE $ - $ 1,710 $ 430 508-072 Concrete Roadway Repairs $ - $ 4,800 $ 1,200 508-056 Citywide System Preservation $ - $ 2,500 $ 625 527-009 Greenmount Ave - 29th to 43rd $ - $ - $ 300

JUSTIFICATION – ROADWAY REHABILITATION

slide-30
SLIDE 30

ROADWAY REHABILITATION

slide-31
SLIDE 31

Studi udies es (FY19 9 Tot

  • tal = $465 thousa

usand nd)

  • Assess

ess non non-federa derally y funde nded d require quireme ments nts

  • Det

etermines rmines how to upgra rade de det eteri riora rated ed fa faciliti lities es

  • Speci

cific c planning nning studi udies es to prepa pare re for future ture capita tal requ quest sts

STUDIES CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 508-085 ADA Self Evaluation $ - $ - $ 250 508-899 Siting Evaluation-2601 Falls Road Facility $ - $ - $ 115 508-641 Planning Studies $ - $ - $ 100

JUSTIFICATION - STUDIES

slide-32
SLIDE 32

Traffic c (FY19 9 Tot

  • tal = $18

18.6 6 million)

  • Needed upgra

raded ded operati tion

  • nal

l effici cien ency

  • Priori
  • ritize

zed d trans nsit movement nt

  • Moderni

rnize zed d techno hnology

  • Safer

r stre reets ts

TRAFFIC CIP PROJECT COUNTY TRANSPORTATION BONDS FEDERAL HUR 512-005 TMC Upgrade $ - $ 800 $ 200 512-077 Traffic Signal Reconstruction $ 520 $ 6,060 $ 995 512-078 ITS Improvements Citywide $ - $ 5,000 $ 1,250 512-080 Traffic Safety Improvements $ - $ 3,000 $ 750

JUSTIFICATION - TRAFFIC

slide-33
SLIDE 33

TRAFFIC

slide-34
SLIDE 34

MOVING FORWARD WITH THESE INVESTMENTS

DOT will be proacti

tive with

th a g greater r emp mphasi asis s on multi timoda

  • dal trans

nspo portati tation n options ns. . DOT will have a r roadmap map for investme estment nt and impr mproveme ments nts. . DOT will use techno hnology y and best practi tice ces s to manage and prioriti ritize ze. . DOT will establish sh a p project ct manageme ment nt structur ructure to priorit ritize ze capita tal projec ects ts through ugh an asset t management nt approach. ch. DOT will be t transpare nsparent. nt.

slide-35
SLIDE 35

DOP & DOT-CIP 2013-2017 PROJECTS

slide-36
SLIDE 36

DOT-CIP 2019 PROJECTS