Area of Road X Improvements I S T I N G E N T R A N C - - PowerPoint PPT Presentation

area of road
SMART_READER_LITE
LIVE PREVIEW

Area of Road X Improvements I S T I N G E N T R A N C - - PowerPoint PPT Presentation

Area of Road X Improvements I S T I N G E N T R A N C E R A M P 300' U S 8 1 / U S U S 8 1 / 2 8 U 7 S N 2 O 8 R 7 T H S O ( U S T P H E E D ( S P L E I E M I D T L I 6 M I 5 T M


slide-1
SLIDE 1

700' AUXILLARY LANE 3 ' T A P E R 300' EXIT RAMP WILLOW SPRINGS RD/BLUE MOUND RD A P P R O X . 6 7 ' T O EXIT RAMP BONDS RANCH RD

  • APPROX. 10800' TO

U S

8 1

/

U S

2 8 7 S

O U T H

(

S P E E D L

I

MI

T 6 5

M

P H

)

U S

8 1

/

U S

2 8 7

N O R T H

(

S P E E D L

I

MI

T 6 5

M

P H

)

E N T R A N C E R A

M

P X

I

S T

I

N G E N T R A N C E R A MP

900' 820'

Area of Road Improvements

slide-2
SLIDE 2

700' AUXILLARY LANE 3 ' T A P E R

300'

EXIT RAMP WILLOW SPRINGS RD/BLUE MOUND RD A P P R O X . 6 7 ' T O EXIT RAMP BONDS RANCH RD

  • APPROX. 10800' TO

U

S 8 1

/

U

S 2 8 7 S

O U T H

(

S P E E

D L

I

MI

T

6 5

M

P

H

)

U

S 8 1

/

U

S 2 8 7

N O R T H

(

S P E E

D L

I

M

I

T

6 5

M

P

H

)

E N T R A N C E R A

MP

XI

S T

I

N G E N T R A N C E R A

MP

900' 820'

slide-3
SLIDE 3

US 287

10/10/2018

NISD/TxDOT

Limits: South of Blue Mound Road Existing Conditions: Scope of Work: Project Size: Roadway Length (lf): lf Stabilization Width (ft) : ft Stab Area :

  • sy

Binder Width (ft): ft Binder Area:

  • sy

Surface Width (ft): ft Surface Area:

  • sy

Additional Areas (sy): 0 sy Estimate: Roadway Materials: Sq Yds Rate/SY Cost Estimate Final $ Estimate $ Final Lime 40 lb/sy 165.00 $ $/tn 185.00 tn tn 30,525.00 $ Prime (30/70 AEP) 0.15 gal/sy 2.05 $ $/gal 1500 gal gal 3,075.00 $ Tack Coats 0.10 gal/sy 3.25 $ $/gal 2446 gal gal 7,950.80 $ HMAC Binder 0.11 tn/sy 65.00 $ $/tn 4623 tn tn 300,495.00 $ HMAC Surface 0.110 tn/sy 70.00 $ $/tn 1641 tn tn 114,870.00 $ Material Subtotal 456,916 $ Misc Cost SWPPP/Compost/Seeding 75,000.00 $ Traffic Control 15,000.00 $ Pipe/SET 9,500.00 $ Striping/Signs 7,500.00 $ Milling 5.00 $ $/sy 1702 sy sy 15,000.00 $ Materials + Misc Cost 578,915.80 $ 10% Contingency 57,891.58 $ Sub Total for Materials &

  • Misc. Costs:

636,807.38 $ Engineering Fees: 225,525.00 $ Total Cost: 862,332.38 $ Material cost based on Sept 2018 pricing. Construction Time Estimate: days Comments: Assume can get an exception on asphalt in surface mix TxDOT supply sign stubs and post TXDOT supply TCP for night closure (Incl police) TxDOT to provide thermo striping and Markers Does not include any Signal Work Based on quantites taken from 60% plans TxDOT provide dump site for concrete TxDOT remove existing CTB TCP revised to eliminate CTB in Traffic Control Plan Estimate includes repair & overlaying existing frontage road The existing frontage road has a few pending base failures. Existing ramp to be removed. Extend existing frontage road and relocate SB enterance ramp downstream from new Eagle Blvd. Prepared by: Richard Schiller Tarrant County - Precinct Three US 287 Frontage Rd & Ramp - FY 19