area of road
play

Area of Road X Improvements I S T I N G E N T R A N C - PowerPoint PPT Presentation

Area of Road X Improvements I S T I N G E N T R A N C E R A M P 300' U S 8 1 / U S U S 8 1 / 2 8 U 7 S N 2 O 8 R 7 T H S O ( U S T P H E E D ( S P L E I E M I D T L I 6 M I 5 T M


  1. Area of Road X Improvements I S T I N G E N T R A N C E R A M P 300' U S 8 1 / U S U S 8 1 / 2 8 U 7 S N 2 O 8 R 7 T H S O ( U S T P H E E D ( S P L E I E M I D T L I 6 M I 5 T M 900' P 6 H 5 ) M P H ) WILLOW SPRINGS RD/BLUE MOUND RD E A N P T P R R O A N EXIT RAMP X C . 6 E 7 0 R 0 A ' M T O P 820' APPROX. 10800' TO BONDS RANCH RD EXIT RAMP 700' AUXILLARY LANE 3 0 0 ' T A P E R

  2. X I S T I N G E N T R A N C E R A M P 300' U S 8 1 / U S U S 8 1 / 2 8 U 7 S N 2 O 8 R 7 T H S O ( U S T P E H E D ( S L P I E M E D I T L 6 I 5 M I T M 900' P 6 H 5 ) M P H ) WILLOW SPRINGS RD/BLUE MOUND RD A E N P P T R R O A N X EXIT RAMP . C 6 E 7 0 R 0 ' A T M P O 820' APPROX. 10800' TO BONDS RANCH RD EXIT RAMP 700' AUXILLARY LANE 3 0 0 ' T A P E R

  3. US 287 10/10/2018 NISD/TxDOT Limits: South of Blue Mound Road Existing Conditions: The existing frontage road has a few pending base failures. Existing ramp to be removed. Scope of Work: Extend existing frontage road and relocate SB enterance ramp downstream from new Eagle Blvd. Project Size: Roadway Length (lf): lf Stabilization Width (ft) : ft Stab Area : - sy Binder Width (ft): ft Binder Area: - sy Surface Width (ft): ft Surface Area: - sy Additional Areas (sy): 0 sy Estimate: Roadway Materials: Sq Yds Rate/SY Cost Estimate Final $ Estimate $ Final Lime 40 lb/sy $ 165.00 $/tn 185.00 tn tn $ 30,525.00 Prime (30/70 AEP) 0.15 gal/sy $ 2.05 $/gal 1500 gal gal $ 3,075.00 Tack Coats 0.10 gal/sy $ 3.25 $/gal 2446 gal gal $ 7,950.80 HMAC Binder 0.11 tn/sy $ 65.00 $/tn 4623 tn tn $ 300,495.00 HMAC Surface 0 0.110 tn/sy $ 70.00 $/tn 1641 tn tn $ 114,870.00 Material Subtotal $ 456,916 Misc Cost SWPPP/Compost/Seeding $ 75,000.00 Traffic Control $ 15,000.00 Pipe/SET $ 9,500.00 Striping/Signs $ 7,500.00 Milling $ 5.00 $/sy 1702 sy sy $ 15,000.00 Materials + Misc Cost $ 578,915.80 10% Contingency $ 57,891.58 Sub Total for Materials & Misc. Costs: $ 636,807.38 Engineering Fees: $ 225,525.00 Total Cost: $ 862,332.38 Material cost based on Sept 2018 pricing. Construction Time Estimate: days Comments: Assume can get an exception on asphalt in surface mix TxDOT supply sign stubs and post TXDOT supply TCP for night closure (Incl police) TxDOT to provide thermo striping and Markers Does not include any Signal Work Based on quantites taken from 60% plans TxDOT provide dump site for concrete TxDOT remove existing CTB Prepared by: Richard Schiller TCP revised to eliminate CTB in Traffic Control Plan Tarrant County - Precinct Three Estimate includes repair & overlaying existing frontage road US 287 Frontage Rd & Ramp - FY 19

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend