annual report to the collin county commissioners court
play

Annual Report to the Collin County Commissioners Court July 22, - PowerPoint PPT Presentation

Annual Report to the Collin County Commissioners Court July 22, 2008 Presented by: Chairman Paul N. Wageman and Director Gary Base Executive Director Jorge Figueredo 2 2007 NTTA Revenue 2007 NTTA Debt Service Existing System with SH 121


  1. Annual Report to the Collin County Commissioners Court July 22, 2008 Presented by: Chairman Paul N. Wageman and Director Gary Base Executive Director Jorge Figueredo

  2. 2 2007 NTTA Revenue

  3. 2007 NTTA Debt Service Existing System with SH 121 $3,000,000,000 Current Senior Debt Service Target Coverage (1.50x) Proforma System Net Revenues $2,500,000,000 $2,000,000,000 $1,500,000,000 $1,000,000,000 $500,000,000 $0 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 0 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 FYE 1/1 3

  4. NTTA Is Customer Focused Annual Customer Contacts 2 Million (13% increase in volume) Average Daily Customer Contacts 8,000 Average Daily Transactions 1.2 Million Total Active TollTag Accounts 797,000 Total TollTag Transponders 1,438,876 4

  5. Moving Forward Roadway Centerline Mi. Lane Mi. Addison Airport .67 1.36 Mountain Creek Lake Bridge 1.95 3.90 Dallas North Tollway 30.06 180.50 President George Bush Turnpike 30.09 180.57 Current System TOTAL 62.77 366.33 SH 121 26.20 157.20 Lewisville Lake Toll Bridge 1.70 6.80 PGBT – Eastern Extension 9.90 59.94 SH 161 11.00 66.00 Southwest Parkway 8.40 47.94 Planned NTTA System TOTAL 57.20 337.34 5

  6. Dallas North Tollway Phase 3 • Opened to traffic on September 28, 2007 • 9.6- mile extension from SH SH 121 north to U.S. 380 • All corridor ramps are open open except at County Road 24 and Virginia Parkway • Project Cost: $264 million 6

  7. Dallas North Tollway Phase 3 •Next Step – Irrigation and landscaping installation � Began May 2008 � Expected to last 450 days 7

  8. State Highway (SH) 121 Corridor Update •NTTA assumed interim toll operations for TxDOT in April •Construction and contracts updates • DNT / SH 121 Interchange Design Engineer Services Contract • Segments 1 and 2 Sound walls, pavement markings and signs Contracts awarded • Segment 3 construction contracts awarded – construction underway 8

  9. SH 121 Next Steps •Preston Road bypass opened •Stakeholder aesthetic meetings (ongoing) TxDOT constructed Segment 2 • Electronic toll gantries and plazas Opens in September • Community outreach to promote TollTags 9

  10. SH 121 Ramps and Gantries • Electronic toll collection (cashless) gantries being installed on Segments 1 and 2 Ramp gantry – under construction Main lane toll gantry 10

  11. Dallas North Tollway Phase 4A Limits: U.S. 380 TO FM 428 Total Length: 6 miles Total Project Length: Phases 4 and 5 17.6 miles Opening Date: To be determined 11

  12. Lewisville Lake Toll Bridge Corridor Limits: IH 35E to the Dallas North Tollway Corridor Length: 13.8 miles NTTA Bridge Cost: $122 million Anticipated Opening: Opening: LLTB - 50% Complete Summer ‘09 12

  13. Lewisville Lake Toll Bridge Next Steps: • Cost estimate for electronic toll gantry installation • Staff completion of plans to improve intersections of Sections 1 and 3 • Stakeholder work group planning “Bridging North Texas Communities” event for the opening 13

  14. All-Electronic Toll Collection • Conversion to all- electronic toll collection – President George Bush Turnpike – Dallas North Tollway – Addison Airport Toll Tunnel – Mountain Creek Lake Bridge • Conversion to be completed by 2010 14

  15. PGBT Capacity Improvements Fourth lane in each direction from IH 35E to SH 78 Project Cost: $48 million Project Status: • Design at 60% completion • Construction anticipated from Spring 2009 to Winter 2011 15

  16. Program Management Office • SH 121 • Dallas North Tollway Phases 4 and 5 • Lewisville Lake Toll Bridge • PGBT Eastern Extension • Trinity Parkway • East Branch/SH 190 • SH 161 • Southwest Parkway • SW Parkway (TxDOT)/ Chisholm Trail • SH 170 • SH 360 16

  17. 2009-2013 Strategic Plan WE ARE HERE Phase 1 Phase 2 Phase 3 Phase 4 Plan Development , Internal Plan Stakeholder Approval and Implementation Input Planning Communication 17

  18. The North Texas Tollway Authority provides a fiscally sound system of innovative toll facilities, services and solutions that improves the mobility, quality of life and economy of the North Texas Region. 18

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.