GMW PRIVATE LIMITED CORPORATE OVERVIEW & CASE STUDY OF TRCM - - PowerPoint PPT Presentation

gmw private limited
SMART_READER_LITE
LIVE PREVIEW

GMW PRIVATE LIMITED CORPORATE OVERVIEW & CASE STUDY OF TRCM - - PowerPoint PPT Presentation

GMW PRIVATE LIMITED CORPORATE OVERVIEW & CASE STUDY OF TRCM EXPERIENCE IN POWER SECTOR Executed over 90 power plant contracts, Coal, Gas & Nuclear based ranging from 110 MW to 2000 MW. More than 35 Hydel Power Projects ranging from 5


slide-1
SLIDE 1

GMW PRIVATE LIMITED

CORPORATE OVERVIEW & CASE STUDY OF TRCM

slide-2
SLIDE 2

EXPERIENCE IN POWER SECTOR

Executed over 90 power plant contracts, Coal, Gas & Nuclear based ranging from 110 MW to 2000 MW. More than 35 Hydel Power Projects ranging from 5 MW to 1200 MW Exporters of HM Equipment (Gates, Hoists, Trash Rake Cleaning Machines) and Travelling Band Screens. Design, Manufacture, supplied and Commissioned more than 50 TRCM’s till date.

slide-3
SLIDE 3

MANUFACTURING UNITS

GIDC, VADODARA POR INDUSTRIAL AREA UNA, HIMACHAL PRADESH KARJAN, GUJARAT SILIGURI, WEST BENGAL With a combine area of more than 1 lac sq meter.

slide-4
SLIDE 4
slide-5
SLIDE 5

ISO 9001:2015 Certificate from prestigious AQA & TUV ISO 14001 & OHSAS 18001 (Under Implemen tation) Certified by 3rd party agencies like Lloyds Registrar

  • f

Shipping (LRS), NTPC,SGS NPCIL,TU V various IIT’s etc. Each product is assembled and undergo rigorous test in our testing facilities before dispatch.

QUALITY CONTROL

Reliable Product & Better Services

slide-6
SLIDE 6

INHOUSE TESTING PRIOR TO DISPATCH

slide-7
SLIDE 7

MAXIMIZATION OF GENERATION THROUGH EFFECTIVE TRASH MANAGEMENT CHIPLIMA HEP (72 MW ), OHPC, LIMITED.

REASON FOR THE VERY LOW PLANT AVAILABILITY

Perennial weeds in the power channel and pond area of OHPC ’ s (Orissa Hydro Power Corporation) power plant which also choke the submerged trash rack resulting in head loss and reduced Generation.

20 40 60 80 100

1998-99 1999-2000 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10

Plant Availability in %

% Generation w.r.t Design Energy

slide-8
SLIDE 8

v

Perennial weeds Choking Trash Rack Panels Trash Rack Panels

slide-9
SLIDE 9

Existing Gantry Obstructs Movement of TRCM

CHALLENGES

The existing 75 T Gantry on Intake that obstructs the movement

  • f Trash Cleaning Mechanism on Intake.

Gantry crane is required for operation of Intake stop logs and

hence cannot be dismantled / removed from site.

Old trash rack panels No device to measure, check & provide warning about total head

loss due to chocking in submerged intake – i.e. absence of monitoring.

slide-10
SLIDE 10

TECHNICAL PROPOSAL BY GMW

 Installation of new rails in existing intake for Trash Rack

Cleaning Machine.

 Design and Installation of custom made Trash Rack

Cleaning Machine to suit Intake.

 Providing additional Grappler Crane to lift bulk floating

debris.

 Machine to have feature to let Gantry cross over for

  • peration of Stop Log Gates.

 Replacement of Trash Racks  Installation of continuous monitoring system.

slide-11
SLIDE 11
slide-12
SLIDE 12

GENERATION DATA BEFORE AND AFTER INSTALLATION OF TRCM

slide-13
SLIDE 13

50 100 150 200 250 300 350 GENERATION IN M ILLION UNIT ( M U) WATER YEAR ( TRCM INSTALLED IN 2010 )

GENERATION (IN M U)

GENERATION ACHIEVED INCREASED TO 60% OF DESIGN VALUE FROM BELOW 30%

slide-14
SLIDE 14
slide-15
SLIDE 15

COMMISSIONED IN NOV. 2009 AT CHUKKHA PROJECT, BHUTAN

slide-16
SLIDE 16

MORE THAN 30 NOS. OF TRASH TROLLEY IN A SINGLE DAY IN RAINY SEASON AND ACHIEVED HIGHER GENERATION GAIN

Collection of Trash in Trash Trolley Disposal of Trash through Trash Trolley

slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19

STANDARD FEATURES OF GMW MACHINES

 In-house Design.  Indigenously procured parts ensuring ease of

maintenance.

 Safety Interlocks for reliable and full proof operation.  Customized Design for retrofit to existing Intakes.  Especially designed Grab for best handling

different types of Trash.

 PLC based panel with on screen guidance and

touch screen menu for ease of operation.

 Use of Bio-degradable Oils making Eco-Friendly

machines.

slide-20
SLIDE 20

AFTER INSTALLATION SERVICES

Quick Response Easy Of Maintenance & Operation Availability Of Spare Parts Customize Solutions To Suit Existing Intakes And Himalayan Conditions Provides Operation And Maintenance Round The Clock In Case Of AMC.

slide-21
SLIDE 21

ADOPTING LATEST TECHNOLOGY

slide-22
SLIDE 22

GATES MANUFACTURED & SUPPLY BY GMW FOR AFGHAN-INDIA FREINDSHIP DAM INAUGURATION BY OUR HONORABLE PRIME MINISTER SHRI. NARENDRA MODI.

slide-23
SLIDE 23
slide-24
SLIDE 24

THANK YOU