GMW PRIVATE LIMITED CORPORATE OVERVIEW & CASE STUDY OF TRCM EXPERIENCE IN POWER SECTOR Executed over 90 power plant contracts, Coal, Gas & Nuclear based ranging from 110 MW to 2000 MW. More than 35 Hydel Power Projects ranging from 5
SLIDE 2
SLIDE 3
MANUFACTURING UNITS
GIDC, VADODARA POR INDUSTRIAL AREA UNA, HIMACHAL PRADESH KARJAN, GUJARAT SILIGURI, WEST BENGAL With a combine area of more than 1 lac sq meter.
SLIDE 4
SLIDE 5
ISO 9001:2015 Certificate from prestigious AQA & TUV ISO 14001 & OHSAS 18001 (Under Implemen tation) Certified by 3rd party agencies like Lloyds Registrar
- f
Shipping (LRS), NTPC,SGS NPCIL,TU V various IIT’s etc. Each product is assembled and undergo rigorous test in our testing facilities before dispatch.
QUALITY CONTROL
Reliable Product & Better Services
SLIDE 6
INHOUSE TESTING PRIOR TO DISPATCH
SLIDE 7
MAXIMIZATION OF GENERATION THROUGH EFFECTIVE TRASH MANAGEMENT CHIPLIMA HEP (72 MW ), OHPC, LIMITED.
REASON FOR THE VERY LOW PLANT AVAILABILITY
Perennial weeds in the power channel and pond area of OHPC ’ s (Orissa Hydro Power Corporation) power plant which also choke the submerged trash rack resulting in head loss and reduced Generation.
20 40 60 80 100
1998-99 1999-2000 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10
Plant Availability in %
% Generation w.r.t Design Energy
SLIDE 8
v
Perennial weeds Choking Trash Rack Panels Trash Rack Panels
SLIDE 9
Existing Gantry Obstructs Movement of TRCM
CHALLENGES
The existing 75 T Gantry on Intake that obstructs the movement
- f Trash Cleaning Mechanism on Intake.
Gantry crane is required for operation of Intake stop logs and
hence cannot be dismantled / removed from site.
Old trash rack panels No device to measure, check & provide warning about total head
loss due to chocking in submerged intake – i.e. absence of monitoring.
SLIDE 10
TECHNICAL PROPOSAL BY GMW
Installation of new rails in existing intake for Trash Rack
Cleaning Machine.
Design and Installation of custom made Trash Rack
Cleaning Machine to suit Intake.
Providing additional Grappler Crane to lift bulk floating
debris.
Machine to have feature to let Gantry cross over for
- peration of Stop Log Gates.
Replacement of Trash Racks Installation of continuous monitoring system.
SLIDE 11
SLIDE 12
GENERATION DATA BEFORE AND AFTER INSTALLATION OF TRCM
SLIDE 13
50 100 150 200 250 300 350 GENERATION IN M ILLION UNIT ( M U) WATER YEAR ( TRCM INSTALLED IN 2010 )
GENERATION (IN M U)
GENERATION ACHIEVED INCREASED TO 60% OF DESIGN VALUE FROM BELOW 30%
SLIDE 14
SLIDE 15
COMMISSIONED IN NOV. 2009 AT CHUKKHA PROJECT, BHUTAN
SLIDE 16
MORE THAN 30 NOS. OF TRASH TROLLEY IN A SINGLE DAY IN RAINY SEASON AND ACHIEVED HIGHER GENERATION GAIN
Collection of Trash in Trash Trolley Disposal of Trash through Trash Trolley
SLIDE 17
SLIDE 18
SLIDE 19
STANDARD FEATURES OF GMW MACHINES
In-house Design. Indigenously procured parts ensuring ease of
maintenance.
Safety Interlocks for reliable and full proof operation. Customized Design for retrofit to existing Intakes. Especially designed Grab for best handling
different types of Trash.
PLC based panel with on screen guidance and
touch screen menu for ease of operation.
Use of Bio-degradable Oils making Eco-Friendly
machines.
SLIDE 20
AFTER INSTALLATION SERVICES
Quick Response Easy Of Maintenance & Operation Availability Of Spare Parts Customize Solutions To Suit Existing Intakes And Himalayan Conditions Provides Operation And Maintenance Round The Clock In Case Of AMC.
SLIDE 21
ADOPTING LATEST TECHNOLOGY
SLIDE 22
GATES MANUFACTURED & SUPPLY BY GMW FOR AFGHAN-INDIA FREINDSHIP DAM INAUGURATION BY OUR HONORABLE PRIME MINISTER SHRI. NARENDRA MODI.