Airly Mine Airly Mine Community Consultative Committee (CCC) Presentation Airly Mine 5 th September 2017 www.centennialcoal.com.au 1. Introduction Reporting Period: May - Sep 2017 Site Name/Location: Airly Mine, Capertee, NSW Summary of
- 1. Introduction
Reporting Period: May - Sep 2017 Site Name/Location: Airly Mine, Capertee, NSW Summary of Consents and Licences: Airly Mine Contact Details:
2
Any Change? SSD_5581 No ML1331 No EPL12374 No A232 No EPBC 2013/7606 Approval granted on 18 May 2017 Position Key Contact Contact Details Mine Manager Bob Miller (02) 6359 2101 Email: bob.miller@centennialcoal.com.au Environment and Community Coordinator Sam Price Office: (02) 6359 2108 Mobile: 0427 647 657 Email: sam.price@centennialcoal.com.au
- 2. Operations Summary
Material Approved Limit (and source) This Reporting Period since previous CCC (May – Aug 2017) Year to Date Annual Forecast Waste Rock/ Overburden
N/A N/A N/A N/A
ROM Coal
1.8MT/annum 259kt 522kt 850kt
Reject
N/A N/A N/A N/A
Saleable Product
N/A 190kt 263kt 850kt
Railing
224kt 464kt 840kt
3
4
Current & Projected Workings
5
Current & Projected Workings
Overview of Operations 2017 YTD
- Nil environmental “non compliances” recorded
- Production and productivity levels exceeded both budget and
forecast
- Successful trial of gate road ‘single unit’ development completed at
increased depth under Airly Mesa
- ‘Super unit’ development extended into shallow workings on
western fringe of Genowlan Mesa
- Permanent employment numbers increased from 78 to 82 persons
- Continued to supply domestic customers (Eraring and Delta) and
export customers through Port Waratah Coal Services.
- Undertook major upgrade of underground ventilation infrastructure
- Commitment resources to continuous miner rebuild program,
underground ventilation and conveyor upgrade
- Developed environmental management plans under SSD_5581
6
Projections for 2017 Operating Context
- Maintain bord and pillar first working operations
employing ‘super unit’ methods in 206 Panel and 207 Panel under Genowlan Mesa
- Undertake gate road development program under Airly
Mesa employing “single unit” methods.
- Gain regulatory approval for conditions contained in the
consent granted for the Airly Extension Project..
- Finalise feasibility report for Phase 2 Mining including:
- Option study on equipment selection near finalisation
- Capital project funding documentation prepared
- Rebuild program commenced for continuous miners
7
- 3. Environmental Performance
8
Airly Mine – Noise Monitoring
- Airly Mine has no specific noise monitoring requirements or noise criteria in either
the Project Approval (DA 162/91) or EPL12374.
- Airly Mine is currently preparing a Noise Management Plan (NMP) in accordance
with SSD_5581.
- 2017 noise monitoring is scheduled for October.
9
Airly Mine Adopted Noise Monitoring Criteria Location Day/Evening/Night Criteria. LAeq, 15minute Night Criteria. LA1,1minute Location A N/A N/A Location B 35 45 Location C N/A N/A Location D N/A N/A Location E N/A N/A Location F N/A N/A
Airly Mine – Noise Monitoring Results
Location Compliant? Location A IA <30 IA N/A Yes Location B IA IA IA 35 Yes Location C <30 35 <20 N/A Yes Location D IA IA IA N/A Yes Location E IA <25 IA N/A Yes Location F IA <30 <30 N/A Yes
10
- LAeq,15minute noise monitoring was conducted at Airly Mine on 13th & 14th
November 2016 for locations A, B and D; and on 20th and 21st November 2016 for locations C, E and F.
IA = Inaudible
Airly Mine – Air Quality Monitoring Results
11
Location Air Quality (g/m2/month) Dust Deposition Gauge Results
Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017
DM1
0.8 0.4 2.4 0.6 0.4 0.8 0.1 0.3
DM2
1 4.2* 0.6 0.3 0.2 0.1 0.2 0.3
DM3
0.4 1.2 0.7 2.6 0.7 0.3 0.5 0.3
DM4
2.2 1.5 0.5 0.3 0.3 0.1 0.2 0.2
Non-compliance Compliance
- *Sample contaminated by external factors such as bird droppings.
- Airly Mine has four depositional dust gauges located across site. These gauges are
monitored monthly for compliance.
- Depositional dust monitoring results for YTD 2017 are provided below.
Airly Mine – Air Quality Monitoring Results
12
Airly Mine - Meteorological Monitoring
13
Month Total Rainfall (mm) Minimum Temperature (
- C)
Maximum Temperature (
- C)
January – 2017 37.4 11.7 38.3 February – 2017 20.8 5.4 41.4 March – 2017 130.6 8 30 April – 2017 21.8 1.6 22.3 May – 2017 28.4
- 3.7
19.7 June – 2017 16.6
- 2.4
16.8 July – 2017 8
- 5.5
20.7 August – 2017 Month not complete at the time of the report.
Airly Mine - Meteorological Monitoring
14
Airly Mine – Water Monitoring Results
15
Discharge water quality
pH Total Suspended Solids (mg/L) Electrical Conductivity (μS/cm) Oil & Grease (mg/L)
January 2015 – August 2017 LDP1 No discharge LDP2 No discharge LDP3 No discharge Non-compliance Compliance
Airly Mine – Subsidence Monitoring
- The subsidence monitoring line over the 121 Panel was
installed during February 2017.
- Pillar monitoring in 121 Panel under the subsidence line
was also during February 2017
- Extraction in this area will be later in 2017
- Quotes are being sourced for photogrammetry survey
16
Subsidence Monitoring Line
17
2016 Groundwater Monitoring Bores
18
Monitoring Location Monitoring Type Final Depth Completion Date
ARP11 Lithgow Seam water level & quality 15.29m 13/10/16 ARP12 Grotto surface/ alluvial water level & quality 2.6m 13/10/16 ARP13 Shoalhaven Group (120m bgl) & Devonian strata (280m bgl) water level & quality 310m 9/12/16 ARP13 SP Lithgow Seam water level & quality 80m 25/11/16 ARP14 Oasis surface/ alluvial water level & quality 2.29m 13/10/16 ARP15 Lithgow Seam (125m bgl), Shoalhaven Group (200m bgl), Devonian strata (365m bgl) water level & quality 375m 12/1/17 ARP15 SP Narrabeen sandstone water level & quality 22.2m 17/1/2017
Airly Mine – Groundwater Monitoring Locations
19
- 4. Environmental Management
20
Airly Mine – Cultural Heritage
21
Historically: Five (5) sites have been undermined: 45-1-2746 (Artefact Scatter) - Dec 2010 45-1-2763 (Artefact Scatter) – Mar 2011 45-1-2761 (Shelter) – Jul 2011 45-1-2762 (Artefact Scatter) – Sep 2015 45-1-2748 (Isolated Find) – May 2017
- No mining related disturbance to any site.
Previous 6 Months: One site (45-1-2748) was undermined; monitoring inspections were carried out as per the ACHMP Upcoming 6 Months: Nil Low level subsidence and tilt as a result of mining, does not pose a risk of harm to these sites Fencing activities completed to help mitigate against potential harm
Airly Mine – Cultural Heritage
22
- A pre-mining inspection of site 45-
1-2748 was completed on 28 March 2017.
- No mining induced impacts to
the site were evident during the pre-mining inspection
- A post-mining inspection of site 45-
1-2748 was carried out on 17 August 2017.
- No mining related disturbance
were evident during the
- inspection. All RAPs were
satisfied with the condition of the site.
Airly Mine – Rehabilitation & Land Management
- Airly Mine does not currently have any land available or subject to rehabilitation
- works. This is not likely to change until mine closure.
- Updated rehabilitation cost estimate was sent to DRE on 31 March 2017.
- A revised MOP/RMP has been developed and has been submitted for consultation
and approval.
- Spring/Summer 2017-18 weed spraying program will recommence in October.
- Surrounding Mine owned land continues to be leased out for agricultural purposes.
- Riparian restoration of Airly Creek on-going. Tube stock scheduled for Spring.
- Tree screen maintenance conducted as required.
23
Airly Mine – Flora, Fauna & Aquatic Ecology Monitoring
24
- Flora and fauna monitoring activities are
conducted by RPS in spring and summer.
- Aquatic ecology monitoring activities were
conducted in May 2017. And are scheduled again for October 2017.
- Stygofauna monitoring was conducted in
August 2017. No stygofauna present.
Glossy-black Cockatoos Leaf-tailed Gecko
- 5. Summary of Incidents / Non-compliances
(CCC Period: Feb - Apr 2017)
Were all conditions of the relevant approval(s) complied with?
DA162/91 YES ML1331 YES EPL12374 YES A232 YES
25
Statement of Compliance:
Relevant Approval Condition # Condition summary Compliance Status Comment / Description Nil
Non-compliance Summary: Incident Summary:
Nature of Incident Detail of Incident Detail of Mitigation / Remediation
Nil
- 6. Community Engagement
- Airly Mine representatives attended and provided updates at the Capertee Valley
Progress Association (CVPA) Monthly Meetings;
- Airly Mine manned the BBQ again for the Train Day Market on Sunday 21 May
2017.
26
Sponsorship/Donations:
- Kandos/Rylstone Show;
- Rylstone Street Feast;
- Capertee Public School;
- Capertee Hall.
- Cudgegong Country Ball
- Rylstone Rural Fire Brigade
- 7. Community Complaints
- One community complaint was received on 10 March 2017 in relation to vibration.
- Airly Mine Community Complaints Register is publically available on the Centennial
Coal website.
27
Community Complaints Register 2017.
Jan
- 17
Feb
- 17
Mar
- 17
Apr
- 17
May
- 17
Jun
- 17
Jul- 17 Aug
- 17
Sep
- 17
Oct
- 17
Nov
- 17
Dec
- 17
Jan
- 18
Total
Air Water Noise Other
1
Subsidence Waste Visual 1
- 8. Activities proposed for the Next Period
Environment
- Scheduled monitoring and reporting
Systems
- Continue to prepare environmental management plans.
- Implementation of compliance database.
Water
- Routine monitoring and reporting
Rehabilitation and Mine Closure
- Nil
Biodiversity
- Routine monitoring and reporting
Approvals
- Awaiting approval of submitted environmental management plans as
required under SSD_5581
- Submit Extraction Plan for First Workings in the Cliff Zone
28
AIRLY MINE
THANK YOU
29