progress in mining r d
play

Progress in Mining R&D Progress Update to MEMSA 15 June 2017 - PowerPoint PPT Presentation

Progress in Mining R&D Progress Update to MEMSA 15 June 2017 Rationale for TARA In the quest for mechanised mining solutions, the Mining Industry needs to be aware of what capability and offerings of local OEMs. Need to assess


  1. Progress in Mining R&D Progress Update to MEMSA 15 June 2017

  2. Rationale for TARA • In the quest for mechanised mining solutions, the Mining Industry needs to be aware of what capability and offerings of local OEMs. Need to assess “Who has what and at where • along the TRL journey is the technology” • The Mining Precinct through the SAMERDI initiative is developing a tool to assist local OEMs’ get in contact with mining companies penetrate the market; • Technology Availability and Readiness Atlas (TARA) based on Technology Readiness Levels (TRL) • A database under development

  3. A Mine for testing • Under what conditions are the OEMs prepared to utilize the site, in terms of the utilization of equipment at the test mine? This will cover costs, Ts&Cs etc. • Will the OEMs provide operators, or operator training, and under what conditions? • Will OEMs use the existing workshops (surface and underground), and under what conditions? • Are OEMs prepared to work collectively, to help develop systems rather than testing individual pieces of equipment? • How will OEM competitiveness and IP be dealt with in an “open” environment? • Will OEMs provide maintenance staff? • How will interfaces be managed between OEM owned IP on data collection and a common platform to the control room?

  4. R&D Challenge to OEMs Challenge 1: Rapid Reef Development. • Need to find a rapid reef development solution, which uses a continuous mining application, such as a roadheader for hard rock mines. – AngloGold Ashanti looking fora development system that can be used in conjunction with their reef boring work. Operate in quartzite rock (>270 MPa), on reef, cutting on strike, headings of the order of 4 meters wide by 3 metres – Sibanye and AngloPlatinum - Bord and Pillar development on reef, in platinum operations. Similar dimensions, but rock> 180 MPa. • The system must cover support installation and cleaning.

  5. R&D Challenge to OEMs Challenge 2: Modernising the Current Mining • How to improve the cycle through a focus on People, Processes and Technologies, in an integrated way. • Previously “silo” approach to technology. Can existing solutions be revisited in a systems approach? • This challenge therefore requires OEMs to come together to consider the complete cycle and all of its activities, in order to create a balanced system that can at least double face advance, while also improving health and safety.

  6. Mining Demonstrators • MEMSA members have been invited to use the space at the Mining Precinct to advertise their offerings. • This is the 2 nd call for the utilisation of the space. • Not only physical equipment, other material can be proposed and will be considered. • Need to get as many as possible in preparation for the launch (at some point!).

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend