Progress in Mining R&D Progress Update to MEMSA 15 June 2017 Rationale for TARA In the quest for mechanised mining solutions, the Mining Industry needs to be aware of what capability and offerings of local OEMs. Need to assess


slide-1
SLIDE 1

Progress Update to MEMSA 15 June 2017

Progress in Mining R&D

slide-2
SLIDE 2

Rationale for TARA

  • In the quest for mechanised mining

solutions, the Mining Industry needs to be aware of what capability and offerings of local OEMs.

  • Need to assess “Who has what and at where

along the TRL journey is the technology”

  • The Mining Precinct through the SAMERDI

initiative is developing a tool to assist local OEMs’ get in contact with mining companies penetrate the market;

  • Technology Availability and Readiness Atlas

(TARA) based on Technology Readiness Levels (TRL)

  • A database under development
slide-3
SLIDE 3
  • Under what conditions are the OEMs prepared to utilize the site, in terms of

the utilization of equipment at the test mine? This will cover costs, Ts&Cs etc.

  • Will the OEMs provide operators, or operator training, and under

what conditions?

  • Will OEMs use the existing workshops (surface and underground), and under

what conditions?

  • Are OEMs prepared to work collectively, to help develop systems rather than

testing individual pieces of equipment?

  • How will OEM competitiveness and IP

be dealt with in an “open” environment?

  • Will OEMs provide maintenance staff?
  • How will interfaces be managed between

OEM owned IP on data collection and a common platform to the control room?

A Mine for testing

slide-4
SLIDE 4

Challenge 1: Rapid Reef Development.

  • Need to find a rapid reef development solution,

which uses a continuous mining application, such as a roadheader for hard rock mines.

– AngloGold Ashanti looking fora development system that can be used in conjunction with their reef boring work. Operate in quartzite rock (>270 MPa), on reef, cutting on strike, headings of the order of 4 meters wide by 3 metres – Sibanye and AngloPlatinum - Bord and Pillar development on reef, in platinum operations. Similar dimensions, but rock> 180 MPa.

  • The system must cover support

installation and cleaning.

R&D Challenge to OEMs

slide-5
SLIDE 5

Challenge 2: Modernising the Current Mining

  • How to improve the cycle through a focus on

People, Processes and Technologies, in an integrated way.

  • Previously “silo” approach to technology. Can

existing solutions be revisited in a systems approach?

  • This challenge therefore requires OEMs to come

together to consider the complete cycle and all of its activities, in order to create a balanced system that can at least double face advance, while also improving health and safety.

R&D Challenge to OEMs

slide-6
SLIDE 6
  • MEMSA members have been invited to use the

space at the Mining Precinct to advertise their

  • fferings.
  • This is the 2nd call for the utilisation of the space.
  • Not only physical equipment, other material can be

proposed and will be considered.

  • Need to get as many as possible in

preparation for the launch (at some point!).

Mining Demonstrators