SLIDE 1
COLONIAL BEACH PUBLIC SCHOOLS NEW ELEMENTARY SCHOOL
Progress Update February 17, 2016
SLIDE 2 Agenda
- Schedule
- Budget
- Design Update
SLIDE 3
Schedule – Completed
− Design Meeting – January 11, 2016 − Schematic Design Deliverable – January 15, 2016 − Request for Qualifications for General Contractors – January 22, 2016 − Meeting with Dominion Power – January 28, 2016 − Site Plan submission and CUP application to Town – February 5, 2016 − Water Systems Design Meeting with Town – February 9, 2016
SLIDE 4
Schedule – Upcoming
− RFQ responses due February 18, 2016 − Design Development Submission – March 14, 2016 − Dominion Design Proposal for HS Power Line Relocation – TBD
SLIDE 5
Budget
− CBPS is working with the e-Rate program to obtain funding for IT- related items − Skanska and RRMM have worked together to identify cost savings measures that do not impact program in order to remain within budget − Project remains within budget of $8,500,000
SLIDE 6
SITE / FLOOR PLAN
SLIDE 7
FLOOR PLAN
SLIDE 8
MAIN ENTRANCE
SLIDE 9 SITE PLAN FOR TOWN REVIEW
Site Plan Updates:
connection to First Street
two locations
connection at Jackson Street
route for electrical service to ES
conduit for relocated HS service
SLIDE 10
FLOOR PLAN
SLIDE 11 FLOOR PLAN
Artifacts:
- School bell
- Gym floor section with logo
- Salvaged brick
SLIDE 12 GYM AND CAFETERIA PLAN
Artifacts:
- School bell
- Gym floor section
with logo
with descriptive plaques
SLIDE 13
TYPICAL CLASSROOMS TYPICAL CLASSROOMS
SLIDE 14
TYPICAL CLASSROOMS
SLIDE 15 ART & MUSIC ROOMS
ENLARGED ART & MUSIC ROOMS
SLIDE 16 HVAC SYSTEM
HVAC System Design:
- Cost-effective rooftop HVAC system
- Very similar to high school
- Units located over corridor for sound control
- One unit per classroom with own thermostat
SLIDE 17 ADMIN & MEDIA CENTER
ENLARGED ADMINISTRATION & MEDIA CENTER WING
SLIDE 18
GYM AND CAFETERIA PLAN
SLIDE 19
KITCHEN PLAN
SLIDE 20 NEXT STEPS
Site Planning and Design:
- Meet with the Colonial Beach Building Official and the state
Fire Marshall.
- Respond to any comments on the Site Plan submittal
provided to the Town of Colonial Beach and to the DEQ.
- Prepare for the Conditional Use Permit application
meetings.
- Continue to develop and update the Site and Landscape
plans for the project.
SLIDE 21 NEXT STEPS
Building Planning and Design:
- Continue with the development of the plans for the building
design for submitting the Design Development package in mid-March.
- Present the proposed Kitchen Design to the kitchen design
committee, and update the Kitchen Plan with any changes.
- Present the Proposed Designs for the Art classroom, Music
classroom and Media Center to the Principal and teachers.
SLIDE 22
Thank you!