COMPLETED PIPELINES FT Completed Pipelines SNOWSWICK BLUNSDEN - - - PowerPoint PPT Presentation

completed pipelines ft completed pipelines
SMART_READER_LITE
LIVE PREVIEW

COMPLETED PIPELINES FT Completed Pipelines SNOWSWICK BLUNSDEN - - - PowerPoint PPT Presentation

COMPLETED PIPELINES FT Completed Pipelines SNOWSWICK BLUNSDEN - 2019 Instalcom for Thames Water 900mm water pipe Ejoint Endoprene coating Eurokote 468 lining K -60 Canusa HSS FT Completed Pipelines PURTON RESERVOIR -


slide-1
SLIDE 1

COMPLETED PIPELINES

slide-2
SLIDE 2

FT Completed Pipelines

SNOWSWICK – BLUNSDEN - 2019

Instalcom for Thames Water

  • 900mm water pipe
  • Ejoint
  • Endoprene coating
  • Eurokote 468 lining
  • K-60 Canusa HSS
slide-3
SLIDE 3

FT Completed Pipelines

PURTON RESERVOIR - 2019

Murphy for Bristol Water

  • 900mm water pipe
  • Ejoint
  • Bare external
  • Eurokote 468 lining
  • K-60 Canusa HSS and

WrapidBond

slide-4
SLIDE 4

FT Completed Pipelines

COPTHALL CUTTING – HS2 - 2019

Barhale for Affinity Water

  • 800mm water pipe
  • Ejoint
  • Eurokote 468 coating
  • Eurokote 468 lining
  • K-60 Canusa HSS
slide-5
SLIDE 5

FT Completed Pipelines

KIRKLAND BRIDGE - 2018

ABV for Scottish water

  • 1400mm waste water

pipe

  • Victaulic couplings
  • Versathane PU coating
  • Versathane PU lining
slide-6
SLIDE 6

FT Completed Pipelines

DENWALK BRIDGE - 2018

ABV for Scottish water

  • 1400mm waste water

pipe

  • Victaulic couplings
  • Versathane PU coating
  • Versathane PU lining
slide-7
SLIDE 7

FT Completed Pipelines

EAST RENFREWSHIRE RESILIENCE – HIGHLEES 2017

CWA for Scottish Water 2017

  • 23km 900mm pipe
  • Ejoint
  • 3LPE coated
  • Eurokote 468 lining
  • Bespoke fittings
  • K-60 Canusa HSS and

WrapidBond/Coat

slide-8
SLIDE 8

FT Completed Pipelines

WELSH WATER – HEREFORD - 2017

  • 450mm, 600mm and

700mm water pipes

  • Ejoint
  • 3LPE coated
  • Eurokote 468 lining
slide-9
SLIDE 9

FT Completed Pipelines

EAST RENFREWSHIRE RESILIENCE – AMLAIRD 2016

CWA for Scottish Water 2016

  • 23km

900 & 1000mm water pipe

  • Ejoint
  • 3LPE coated
  • Eurokote 468 lining
  • Bespoke fittings
  • K-60 Canusa HSS and

WrapidBond/Coat

slide-10
SLIDE 10

FT Completed Pipelines

AXFORD TO OGBOURNE HONDA RAIL CROSSING 2016

SMB JV for Thames Water

  • 600mm water pipe
  • Ejoint
  • Eurokote 468 lining
  • 3LPE coated
  • Bespoke spacers
  • K-60 Canusa HSS
slide-11
SLIDE 11

FT Completed Pipelines

TALA EAST & WEST TIE IN & MEGGET –2016

Farrans for Scottish Water

  • 900mm water pipe
  • Ejoint
  • Eurokote 468 Thixo lining
  • 3LPE coated
  • Bespoke fittings
  • K-60 Canusa HSS
slide-12
SLIDE 12

FT Completed Pipelines

TRANSPORT FOR LONDON UTILITY BRIDGES 2015-16

Upper Holloway, Ardeligh Green, Power Road Bridge - Skanska

  • various diameter water

pipes

  • Ejoint & socket weld
  • Eurokote 468 & cement

mortar linings

  • 3LPE and Versathane

coated

  • Bespoke fittings
  • K-60 Canusa HSS
slide-13
SLIDE 13

FT Completed Pipelines

M1 J11a - 2014

Amey for Affinity Water

  • 700mm
  • Socket weld
  • Cement mortar linings
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS
slide-14
SLIDE 14

FT Completed Pipelines

Prestwich Pumping Main - 2014

United Utilities

  • 250mm and 800mm
  • Ejoint
  • Epoxy linings
  • Versathane coated
  • Bespoke fittings
  • WLO Canusa HSS
slide-15
SLIDE 15

FT Completed Pipelines

MINSTER large diameter tanks - 2014

South East Water

  • 2000mm
  • Butt weld
  • Epoxy lined and coated
  • Bespoke manufacture
  • WLO Canusa HSS
slide-16
SLIDE 16

FT Completed Pipelines

WHITENDALE - 2014

O’Connor for United Utilities

  • 800mm
  • Ejoint
  • Epoxy lined
  • 3LPE coated
  • Bespoke manufacture
  • WLO Canusa HSS
slide-17
SLIDE 17

FT Completed Pipelines

PURTON WTW – 2012

Bristol Water

  • 420m of 1400mm Water pipes
  • Ejoint
  • 3M Epoxy lining
  • 3LPE coated
  • 20 bespoke connection pieces &

fittings

  • WLO Canusa HSS
slide-18
SLIDE 18

FT Completed Pipelines

ABBERTON ENHANCEMENT – 2012

Carilion for Essex and Suffolk Water

  • 2.5km 1200mm, 1000mm, 900mm

and 600mm water pipes

  • Ejoint
  • 3M Epoxy lining
  • 3LPE coated
  • 100+ bespoke connection pieces

& fittings

  • WLO Canusa HSS
slide-19
SLIDE 19

FT Completed Pipelines

BELLINGTON AUGER CROSSINGS – 2012

Morgan Sindall for Severn Trent Water

  • 500mm water pipes
  • Socket weld
  • Cement lining
  • 3LPE coated
  • WLO Canusa HSS
slide-20
SLIDE 20

FT Completed Pipelines

GLOUCESTER SECURITY OF SUPPLY and MITCHELDEAN – SEVERN TRENT 2009 & 2012

Morgan Sindall for Severn Trent Water

  • 26kms of 600mm water pipes
  • Socket weld
  • Seal coated cement lining
  • 3LPE coated
  • Bends, tees and other fittings
  • WLO Canusa HSS
slide-21
SLIDE 21

FT Completed Pipelines

FINSBURY PARK REPLACEMENT MAINS – 2011

Thames Water

  • 1200mm water pipes
  • Ejoint
  • 3M epoxy lining
  • 3LPE coated
  • WLO Canusa HSS
slide-22
SLIDE 22

FT Completed Pipelines

TAUNTON WTW –2011

Trant Engineering for Wessex Water

  • 100mm & 600mm water

pipes

  • Socket weld and butt weld
  • Seal coated cement lining
  • 3LPE coated
  • Bespoke bends
  • PLA and WLO Canusa HSS
slide-23
SLIDE 23

FT Completed Pipelines

DUTCH INTERCONNECTOR GAS MAIN – 2011

Nacap

  • Canusa GTS 65
  • 3 layer sleeves
slide-24
SLIDE 24

FT Completed Pipelines

CARSTAIRS PIPEBRIDGE – 2011

Farrans for Scottish Water

  • 300mm pipes
  • Pipebridge carrying sewage

sludge

  • Epoxy internal lining (capable of

dealing with aggressive nature of sludge)

  • Epoxy coating
  • Dark green exterior (in keeping with

the environment)

slide-25
SLIDE 25

FT Completed Pipelines

WING PIPELINE – 2010

J N Bentley for Anglian Water

  • 1000mm water pipe
  • Ejoint
  • 3M Epoxy lined
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS
slide-26
SLIDE 26

FT Completed Pipelines

  • Multiple km 80mm to 1200mm

water pipe

  • Spigot and Socket, Ejoint and

socket weld

  • Cement lined and epoxy lined
  • 3LPE coated
  • 100+ fittings for welded

systems and 100s for spigot & socket, including valves, couplings, bolt sets

  • 100s of Canusa sleeves

STRATFORD PARK, LONDON 2010

Olympic Delivery Authority

slide-27
SLIDE 27

FT Completed Pipelines

  • 600mm water pipe
  • Ejoint
  • 3M Epoxy
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

CANOE PARK – 2009

Olympic Delivery Authority

slide-28
SLIDE 28

FT Completed Pipelines

  • 18km 1200mm water

pipe

  • Ejoint
  • 3M Epoxy
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

WELM PHASE 1 – 2009

Murphy for United Utilities

slide-29
SLIDE 29

FT Completed Pipelines

  • 1200mm water pipe
  • Flanged and tie bars
  • 3M Epoxy
  • 3M Skotchkote coating
  • Bespoke fittings

OLDHAM WTW – 2009

United Utilities

slide-30
SLIDE 30

FT Completed Pipelines

BRAY MAIN – 2008

Holleran for South East Water

  • 17km 1200mm water pipe
  • Socket weld
  • Cement lined
  • 3LPE coated
  • 150+ fittings
  • 1500 Canusa sleeves
slide-31
SLIDE 31

FT Completed Pipelines

  • 3.2km 400mm water pipe
  • Socket weld
  • Seal coated cement
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

BLYTH MAIN – 2008

Northumbrian Water

slide-32
SLIDE 32

FT Completed Pipelines

  • 1400mm water pipe
  • Square ends
  • 3M Epoxy lined
  • Sinta PE coated
  • Bespoke fittings
  • WLO Canusa HSS

BUDDS FARM – 2007

4D for Southern Water

slide-33
SLIDE 33

FT Completed Pipelines

  • 500mm brine main
  • Ejoint
  • 3M Epoxy lined
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

BRINE MAIN – E-ON POWER 2007

slide-34
SLIDE 34

FT Completed Pipelines

TRIMPLEY – 2007

McAlpine for Severn Trent Water

  • 500mm water pipe
  • Ejoint
  • 3M Epoxy
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS
slide-35
SLIDE 35

FT Completed Pipelines

RIVER MAIN – E-ON POWER 2007

  • Multiple km 500mm raw

water pipe

  • Ejoint
  • 3M Epoxy
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS
slide-36
SLIDE 36

FT Completed Pipelines

GASPORT – ACCELERATE ENERGY 2006

  • 3km 200mm seamless gas

pipes

  • Butt weld
  • 3LPE coating
  • GTS-65 Canusa HSS
slide-37
SLIDE 37

FT Completed Pipelines

  • 800mm water pipe
  • Socket weld
  • Cement lined
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

BARCOMBE PIPELINE – 2006

South East Water

slide-38
SLIDE 38

FT Completed Pipelines

  • 1200mm water pipe
  • Ejoint
  • 3M Epoxy
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

DUNORE TO HYDEPARK – 2006

Murphy for DOE

slide-39
SLIDE 39

FT Completed Pipelines

  • 1.4km 450mm water pipe
  • Socket weld
  • Seal coated cement
  • 3LPE coating
  • Bespoke fittings
  • TBK Canusa HSS

SWAYTHLING – 2006

4D for Southern Water

slide-40
SLIDE 40

FT Completed Pipelines

  • 800m 150mm water pipe
  • Socket weld
  • Seal coated cement
  • 3LPE coating
  • Bespoke fittings
  • WLO Canusa HSS

ST CATHERINE’S – 2006

4D for Southern Water

slide-41
SLIDE 41

FT Completed Pipelines

  • 13.4km 1200mm water

pipe

  • Ejoint
  • 3M Epoxy
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

WOODFORD – 2005

Murphy for Thames Water

slide-42
SLIDE 42

FT Completed Pipelines

BARROW HYDROCARBON PIPELINE 2005

  • 700mm & 150mm hydrocarbon pipes
  • WLO Canusa HSS

INTERCONNECTOR – N GRID 2005

  • 1200mm gas pipeline
  • WLO Canusa HSS
slide-43
SLIDE 43

FT Completed Pipelines

  • 600mm, 350mm &

300mm water pipe

  • Ejoint and

spigot & socket

  • 3M Epoxy & Cement lined
  • 3LPE coated
  • Bespoke fittings
  • WLO and PMA

Canusa HSS DARTFORD PARK – 2005

McAlpine for Thames Water

slide-44
SLIDE 44

FT Completed Pipelines

  • 500mm water pipe
  • Socket weld and

Spigot & socket

  • Seal coated cement
  • 3LPE coating
  • Bespoke and DI fittings
  • WLO & PMA Canusa H

Canusa HSS SS BISHOPSTON – 2005

Severn Trent Water

slide-45
SLIDE 45

FT Completed Pipelines

  • 800mm water pipe
  • Square ends
  • 3M Epoxy
  • 3M Skotchkote coating
  • Bespoke fittings
  • Cold tapes

SNIPERLEY GRANGE – 2005

Northumbrian Water

slide-46
SLIDE 46

FT Completed Pipelines

  • 700mm water pipe
  • Ejoint
  • 3M Epoxy
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

HOLYWELL DENE – 2005

Northumbrian Water

slide-47
SLIDE 47

FT Completed Pipelines

  • 400mm & 600mm

water pipe

  • Flanged
  • Cement lined
  • 3LPE coated
  • WLO Canusa HSS

ELRED – 2004

Thames Water

slide-48
SLIDE 48

FT Completed Pipelines

  • 500mm & 700mm

water pipe

  • Ejoint
  • 3M Epoxy
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

GREAT BARFORD – 2004

Laing for Anglian Water

slide-49
SLIDE 49

FT Completed Pipelines

  • 900mm & 1200mm

water pipe

  • Ejoint
  • 3M Epoxy
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

BARROW – 2004

Laing for Anglian Water

slide-50
SLIDE 50

FT Completed Pipelines

  • 400mm & 600mm

water pipe

  • Socket weld
  • Cement mortar
  • 3LPE coating
  • TBK Canusa HSS

STOURPORT – 2004

Walter Lawrence for South Staffordshire Water

slide-51
SLIDE 51

FT Completed Pipelines

  • 1.6km 1100mm water

pipe

  • Socket weld
  • 3M Epoxy
  • 3M Skotchkote coating
  • Bespoke fittings
  • WLO Canusa HSS

BIRMINGHAM HOSPITAL – 2004

Morgan Est for Severn Trent Water

slide-52
SLIDE 52

FT Completed Pipelines

  • 11km 300mm water pipe
  • DKM
  • Cement lined
  • 3LPE coated
  • Bespoke fittings
  • PMA Canusa HSS

PERRY OAKS – 2003

Subterra for Thames Water

slide-53
SLIDE 53

FT Completed Pipelines

  • 200mm water pipe
  • Socket weld
  • Cement lined
  • 3LPE coated
  • Bespoke fittings
  • WLO Canusa HSS

SEAL SANDS – BOC 2003

slide-54
SLIDE 54

FT Completed Pipelines

  • 250mm water pipe
  • butt weld
  • Seal coated cement
  • 3LPE
  • Bespoke fittings
  • TBK Canus

Canusa a HSS HSS HAMS HALL – 2002

McAlpine for Severn Trent Water

slide-55
SLIDE 55

FT Completed Pipelines

  • 450mm DI pipe
  • Spigot and socket
  • WLOX Canusa HSS

ALBERT DOCKS – 2002

Thames Water

slide-56
SLIDE 56

FT Completed Pipelines

  • 20km 1000mm steel
  • Spigot weld
  • WLO Canusa HSS

DUNDEE WATER SUPPLY – 2002

Farrans Construction for Scottish Water

slide-57
SLIDE 57

FT Completed Pipelines

  • Multiple km 100mm to

300mm water pipe

  • Spigot & socket
  • Cement lined
  • 3LPE coated
  • WLO Canusa HSS

VARIOUS SCHEMES – 2000-2009

Thames Water

slide-58
SLIDE 58

Project Management

The FT Group has many years experience in project management. This starts with the marketing and promotion of the materials available through to presentations and complex negotiations on requirements and price. Once an order has been secured the FT Project Team work with the supply chain to facilitate the supply to the

  • client. This includes provision of relevant documentation and manufacturing schedules.

The FT Project Team then arranges the logistics, collaborating with the client and the site in order to deliver the required materials in the time frame required. Finally, by attending site, the FT Project Team are on hand to provide training and to advise where and if

  • required. This includes for QA checks on materials arriving on site.
slide-59
SLIDE 59

Contacts

Ian Harding – Managing Director 07974 217905 Duncan Frazer – Head of Business 07768 132900 Tel: 01543 416024 Fax: 01543 416261 Email: enquiries @ftpipelinesystems.co.uk www.ftpipelinesystems.co.uk Certified for : ISO 9001 ISO 14001 OHSAS 18001