KENYA POWER PRESENTATION TO KENYA POWER PRESENTATION TO Presented - - PowerPoint PPT Presentation

KENYA POWER PRESENTATION TO KENYA POWER PRESENTATION TO Presented by: Presented by: Eng. Joseph K. Njoroge, Managing Director & CEO 15th July, 2011 STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM The companys prepaid metering


slide-1
SLIDE 1

KENYA POWER PRESENTATION TO KENYA POWER PRESENTATION TO

Presented by: Presented by:

  • Eng. Joseph K. Njoroge, Managing Director & CEO

15th July, 2011

slide-2
SLIDE 2

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

  • The company’s prepaid metering project, which

commenced on a pilot basis in April 2009

  • It was introduced for purposes of meeting certain key
  • bjectives that include:

– improvement of the Company’s services to its customers through giving them the power to control their electricity supply, li i i f i d bill – elimination of estimated bills, – improvement of billing accuracy; – elimination of disconnection and reconnection; – enhanced privacy, – decongestion of the Company’s banking halls; – and enhancement of ease of bill payment.

  • The pilot was successful.
slide-3
SLIDE 3

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

METERING PROGRESS: METERING PROGRESS:

  • Following the successful pilot project, rollout
  • f the project commenced in March 2011 and
  • f the project commenced in March 2011, and

by 30th June 2011 a total of 123,000 prepaid meters had been installed throughout the meters had been installed throughout the country with a majority of them in Nairobi. Th j i i i d i i

  • The project is continuing and we anticipate

connection of a total of 520,000 meters by the d f h fi i l end of the current financial year.

slide-4
SLIDE 4

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

CHALLENGES FACING PREPAID PROJECT:

  • 1. STEP TARIFF FOR DOMESTIC CUSTOMERS

Prepaid customers are being educated to understand domestic tariff (DC) as applied to Prepaid as follows: i i d & h i. Fixed & Energy Charges: a) Monthly Fixed Charge of KSh 120.00* charged every calendar month. b) E h f b) Energy charges of : ‐ ‐ KSh 2.00 per Unit for 0 ‐ 50 Units bought; ‐ KSh 8.10 per Unit for 51‐1,500 Units bought; KSh 18 57 U i f U i b h b 1 500 ‐ KSh 18.57 per Unit for Units bought above 1,500.

  • This is why say Kshs. 500 will not get one the same number of

units at various times of the month depending on the unit band units at various times of the month depending on the unit band the customer purchase falls in

slide-5
SLIDE 5

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

CHALLENGES FACING PREPAID PROJECT:

  • 1. STEP TARIFF FOR DOMESTIC CUSTOMERS
  • ii. 3rd Party Charges (Variable from Month to Month)

– Fuel Cost Adjustment (due to low hydrology necessitating use of thermal units) – Foreign Exchange Adjustment – Inflation Adjustment

  • This is why the same amount of say Kshs. 500 will not get
  • ne the same number of units for different months of the

year all other factors remaining constant year, all other factors remaining constant.

slide-6
SLIDE 6

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

CHALLENGES FACING PREPAID PROJECT: 1 STEP TARIFF FOR DOMESTIC CUSTOMERS 1. STEP TARIFF FOR DOMESTIC CUSTOMERS

  • iii. Taxes & Levies
  • The customer shall pay any taxes, levies or duties imposed from time to time by the

Government Government.

  • At present, the following are levied by the Government:
  • i. VAT* at 12% charged to:

) d h

  • a) Fixed Charge
  • b) Demand Charge (not applicable to domestic customers)
  • c) Foreign Exchange Fluctuation Adjustment
  • d) Fuel Cost and;
  • e) Inflation Adjustment
  • f) Taxable value of electrical energy consumed in a manner required by the

Government.

  • ii. Rural Electrification Programme (REP) levy at 5% of revenue from Unit sales.
  • iii. Energy Regulatory Commission (ERC) levy at 3 Kenya cents/kWh
slide-7
SLIDE 7

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

CHALLENGES FACING PREPAID PROJECT: 1. STEP TARIFF FOR DOMESTIC CUSTOMERS

  • iv. Taxable Value of Electrical Energy
  • As per the Fifth Schedule of the Value Added Tax Act Cap 476:
  • “VAT shall be exempt in the supply of electrical energy to a domestic

household where the consumption does not exceed two hundred kilowatt‐hours (200kWh).” Wh d 200kWh i ti l th VAT h h ll

  • When one exceeds 200kWh in a particular month, VAT charges shall

be levied on all the electrical energy (units) bought from the beginning of the month.

  • This is why sometimes customers are requested to top up money

so as to get units/tokens when one exceeds 200kWh

slide-8
SLIDE 8

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

MITIGATION ON STEP TARIFF (DC): ( )

  • Carrying out intensive customer education as

regards KPLC tariffs through

  • ur

Customer Relations Officers especially the Domestic Tariff Relations Officers, especially the Domestic Tariff (DC).

  • Enhanced sensitization to be done using both

Enhanced sensitization to be done using both print and electronic media.

  • Lobbying Finance Ministry to exempt charging of

VAT f fi 200 i f ll P l VAT for first 200 units for all customers. Proposal already sent to ERC for tariff review.

slide-9
SLIDE 9

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

CHALLENGES FACING PREPAID PROJECT: CHALLENGES FACING PREPAID PROJECT: PREPAID METERS k l d h h h

  • Kenya Power acknowledges that

there has been a few cases of faulty meters which are so f b l 4% f h l l i f h far below 4% of the total population of the meters installed

  • This is within the internationally acceptable

failure limit for both postpaid and prepaid meters

slide-10
SLIDE 10

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

CHALLENGES FACING PREPAID PROJECT: MITIGATION ON PREPAID METERS

  • Kenya Power has set up special rapid response teams to

expeditiously attend to these cases. expeditiously attend to these cases.

  • Kenya Power has advertised contacts of the personnel

involved in the resolution of these cases.

  • We have also set up a dedicated call centre for prepaid
  • We have also set up a dedicated call centre for prepaid

customers.

  • These personnel, who have been stationed in the prepaid

project sites will provide rapid response capability to enable project sites, will provide rapid response capability to enable the company resolve any faulty meter cases including the refund of any over charged units.

  • Kenya Power will also proactively inspect and change all
  • Kenya Power will also proactively inspect and change all

meters that are suspected to be faulty.

slide-11
SLIDE 11

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

CHALLENGES FACING PREPAID PROJECT: CHALLENGES FACING PREPAID PROJECT: VENDING OF ELECTRICITY TOKENS

  • Vending services for prepaid

customers is being provided as customers is being provided as follows:

slide-12
SLIDE 12

Vendor Name Vendor Location Business Hours Kenya Power & Lighting Kenya Power & Lighting Co. Stima Plaza 8.00a.m. – 4.30p.m. Kenya Power & Lighting Co. Electricity House 8.00a.m. – 4.30p.m. Uchumi Capital Centre Mombasa Road 8.00a.m. – 8.00p.m. Uchumi Ngong Hyper Ngong Road 8.00a.m. – 8.00p.m. Uchumi Langata Road 8.00a.m. – 8.00p.m. Sarit Centre (KPLC Office) Sarit Centre 8.00a.m. – 4.30p.m. Thik (KPLC Offi ) Thik 8 00 4 30 Thika (KPLC Office) Thika 8.00a.m. – 4.30p.m. Mobile vending services ( MPESA & AIRTEL MONEY) Stima Plaza 24hrs ) Nyeri Office Nyeri 8.00a.m. – 4.30p.m. Nakuru Office (E/Hse) Nakuru 8.00a.m. – 4.30p.m. Eldoret Office Eldoret 8 00a m 4 30p m Eldoret Office Eldoret 8.00a.m. – 4.30p.m. Makadara Office Makadara 8.00a.m. – 4.30p.m. Eastleigh Office Eastleigh 8.00a.m. – 4.30p.m.

slide-13
SLIDE 13

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

CHALLENGES FACING PREPAID PROJECT: MITIGATION ON VENDING OF TOKENS

  • Provision of sufficient, convenient vending points will be

enhanced through engagement of three additional 3rd Party enhanced through engagement of three additional 3 Party National vendors, who will substantially increase the vending footprint.

  • The process is at an advanced stage; and upon completion,

prepaid customers will be able to purchase tokens at convenient points near their residence. convenient points near their residence.

  • Reliability of the mobile phone vending services will also be

enhanced in liaison with the concerned mobile phone enhanced in liaison with the concerned mobile phone service providers.

slide-14
SLIDE 14

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

BENEFITS OF PREPAID ELECTRICITY: BENEFITS OF PREPAID ELECTRICITY:

  • No more disconnections
  • No more paying of accounts deposits
  • Total control of your consumption on

y p daily basis (pay when you want to and pay any amount) pay any amount)

  • Eliminates unpleasant surprises (like

high monthly bills and disconnections) high monthly bills and disconnections)

slide-15
SLIDE 15

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM

BENEFITS OF PREPAID ELECTRICITY: S O C C :

  • No reconnection fees when you forget to

make payments p y

  • Eliminates corruption in the disconnection

and reconnection of power

  • No estimated bills
  • No more under or over estimated bills due

to premises access problems

  • Employment creation‐contractors and 3rd

party vendors

slide-16
SLIDE 16

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM BENEFITS OF PREPAID ELECTRICITY: BENEFITS OF PREPAID ELECTRICITY:

  • No more waiting for electricity bills

g y

  • Enhanced privacy
  • Instant reconnection upon purchase
  • f units
  • f units
  • No more queuing to pay bills
  • Reduces landlord‐tenant conflicts
slide-17
SLIDE 17

STATUS OF THE ROLLOUT OF PREPAYMENT METERING SYSTEM CUSTOMER SATISFACTION SURVEY CUSTOMER SATISFACTION SURVEY (Conducted by Strategic Business Options ‐ June 2011):

slide-18
SLIDE 18

Findings Findings

Pre Paid Customers

slide-19
SLIDE 19

Appeal

  • Convenient
  • Cheaper
  • Ability to monitor and regulate usage
  • Easy to top up

Likes

  • No bills
  • Limited places where one can buy the tokens
  • Delays in topping up through M‐pesa
  • Long digits / code

Dislikes

g g

  • Units are not constant – varying rates of units for

the same amount

  • Long queues

Dislikes

slide-20
SLIDE 20

Pre Paid Meter – Length of time used

100%

  • Q. When did you start using the pre paid meter?

60% 70% 80% 90% 100%

20% 40% 17%

30% 40% 50% 60%

17% 10% 9% 3%

0% 10% 20%

Less than two Two months Six months One year ago Two years ago More than Less than two months Two months ago Six months ago One year ago Two years ago More than two years ago Majority of pre paid customers have used the service for less than a year Majority of pre paid customers have used the service for less than a year.

slide-21
SLIDE 21

Customer Experience during Installation

100% 90% 100% 54% 46% 32% 59% 40% 50% 60% 70% 80% 32% 8% 0% 10% 20% 30%

Y N N I h th l ti M l dl d h KPLC t h i i Yes No No I choose the location My landlord choose the location KPLC technician choose the location Did you receive a package in the form of a flier from KPLC about prepaid meters before installation Were you asked for a bribe before your pre paid meter was Who choose the location of your Customer Interface Unit (CIU) ? before installation paid meter was installed ?

54% of pre paid customers did not receive any package prior to installation while 34% choose the location of their CIU the location of their CIU. No customer was asked for a bribe prior to installation.

slide-22
SLIDE 22

After Care Service

Do you know what number to call when you have a problem with your pre paid meter? Would you recommend the pre paid meter to people who are currently not on pre paid meter?

After Care Service

p y p p

Yes No

100%

75% 44% 56%

0% 50%

25% Yes No Most pre paid customers are not aware of the number to call when they have a problem with their meters. 25% would not recommend the pre paid meters to others. This was driven by the perception that pre paid meters were more expensive compared to post paid.

slide-23
SLIDE 23

Overall Satisfaction

100%

  • Q. Overall, how satisfied are you with the pre paid meter?

46%

50% 60% 70% 80% 90% 100%

15% 17% 15% 7%

0% 10% 20% 30% 40%

Extremely satisfied Satisfied Neither satisfied nor disatisfied Disatisfied Not satisfied at all

There are high levels of satisfaction among pre paid customers. Only 22% of pre paid customers were dissatisfied.

“KPLC h ld b i h i l h Wi h f 3000 “KPLC should bring purchase points closer to the customers. With an estate of over 3000 units we would qualify to have a pay point in the estate which can serve the surrounding areas as well” Nyayo Embakasi customer

slide-24
SLIDE 24

Mfangano Island Customers

Likes Dislikes

  • Convenient
  • Able to monitor usage
  • Delays caused when buying tokens

through M‐pesa g

  • Cheaper compared to using

generators

  • No bills
  • Power going off at midnight
  • Varying rates of units for the same

amount “Units keep changing all the time, I bought a token for 1000 shillings and it gave me 56 units, now it has gone down to 40 units”

slide-25
SLIDE 25

Mfangano Island Customers

Suggestions for improvement:

  • ll

k h ff

  • Sell Tokens at the Post Office
  • Have offices close to the island
  • Provide a toll free customer care line
  • Reduce power rationing – provide power throughout the

night

slide-26
SLIDE 26

Post Paid customers perception about Pre Paid Meters

Have you heard about the pre paid meter service from Kenya Power?

Source of awareness TV 54% d d f l

Yes 57% No 43%

Friends and family 45% Radio 34% Newspapers 26% Fliers attached to bills 18%

57%

Posters 9%

57% of post paid customers have heard about the pre paid meter service mainly through TV and word of mouth (friends and family). If given a choice, 59% of the post paid customers would like to switch to the pre paid meters.

slide-27
SLIDE 27

POWER QUALITY AND RELIABILITY

INTRODUCTION:

  • The quality of power in the country is affected by
  • The quality of power in the country is affected by

several factors:

– weather, , – equipment failure, – vandalism, d t – wear and tear, – age of network, – fast growth in development, g p ,

  • Availability of adequate generation capacity is

important in order to keep pace with power d th needs growth.

slide-28
SLIDE 28

POWER QUALITY AND RELIABILITY

CHALLENGES:

  • 1. VANDALISM OF TRANSFORMERS

REGION JUNE MAY APRIL MARCH TOTAL ANNUALIZED REGION JUNE MAY APRIL MARCH TOTAL ANNUALIZED

NAIROBI 46 60 41 40 187

North 18 20 11 11 South 16 27 10 12 West 12 13 20 17

COAST Nil 5 nil 3 8 Mt KENYA 24 26 30 24 104

North 8 10 17 12 South 16 16 13 12

WEST 14 15 20 19 68

West Kenya 7 5 12 8 Central Rift 4 8 7 5 North Rift 3 2 1 6 North Rift 3 2 1 6

TOTAL 367 1101

slide-29
SLIDE 29

POWER QUALITY AND RELIABILITY

CHALLENGES:

  • 1. VANDALISM OF TRANSFORMERS
  • Transformers lost due to vandalism per month 92 units

Transformers lost due to vandalism per month, 92 units

  • Cost of replacement – at Kshs 800,000 per unit – loss is

73,600,000 per month. Th t l i l t th t i ti t d t f

  • The actual economic loss to the country is estimated at four

times this , i.e. Kshs 294,400,000 , money that could be utilized to provide other services or in improving the network network.

  • Vandalized transformers affect the customers directly fed

by the said unit, and all those connected to the same main line once the transformers fail the Kenya Power system line, once the transformers fail , the Kenya Power system takes as a fault on the line, and isolates the whole line, thus inconveniencing many people. It also aggravates the said customers as engineers try to locate the fault supply is customers as engineers try to locate the fault, supply is switched on and off several times.

slide-30
SLIDE 30

POWER QUALITY AND RELIABILITY

MITIGATION ON VANDALISM OF TRANSFORMERS:

  • Welding the transformers to the structures
  • Reposition transformers to individual compounds ( it has its

d b k )

  • wn drawbacks)
  • Media campaigns “Mulika Mwizi” appealing to the public to

report vandals and to “own” the infrastructure.

  • Lobbying parliament and the government to make

“vandalism’” a capital offence or treat it as economic sabotage.

  • Enhanced inspections of the transformers
  • Community policing
slide-31
SLIDE 31

POWER QUALITY AND RELIABILITY

MITIGATION ON VANDALISM ON TRANSFORMERS:

  • Use of “dry” type transformers in area most prone to

vandalism

  • Installation of intruder alerts on Transformers in areas prone

Installation of intruder alerts on Transformers in areas prone to vandalism

  • We are also automating parts of the Nairobi and Mombasa

networks to ensure we can locate faults fast, and thus ensure low outage time as we shall eliminate the driving (with all the jams) required to locate and restore supplies at this time. jams) required to locate and restore supplies at this time.

  • We are also increasingly using concrete poles on new and

reinforcement projects to stop power lines falling and thus d l causing outages due to rotten poles.

slide-32
SLIDE 32

POWER QUALITY AND RELIABILITY

NETWORK REINFORCEMENT AND NEW PROJECTS:

  • To address wear and tear and ageing of the

network, we have embarked on a program to , p g upgrade it

  • This involves adding new lines and

This involves adding new lines and substations

  • The following projects are on going in

The following projects are on going in Nairobi and are expected to be completed before June 2012:

slide-33
SLIDE 33

NETWORK REINFORCEMENT AND NEW PROJECTS

SUB STATION TARGETTED AREA

PROJECTS:

LAVINGTON 66/11KV Lavington, Kawangware, Kilimani areas KABETE 66/11KV Naivasha road Kawangware Waiyaki way Uthiru KABETE 66/11KV Naivasha road, Kawangware, Waiyaki way, Uthiru areas BOMAS 66/11KV Langata area, Karen, Magadi road , Ongata Rongai KIAMBU 66/11KV Kiambu – KIST area, Kirigiti EASTLEIGH Eastleigh area and parts of Eastlands 66/11KV MUTHURWA 66/11 kV CBD and parts of Eastlands, Industrial area 66/11 kV RUAI 66/11 KV Ruai ‐ Tala

slide-34
SLIDE 34

POWER QUALITY AND RELIABILITY

NETWORK REINFORCEMENT AND NEW PROJECTS:

  • These projects will greatly enhance the

quality and reliability of power in Nairobi q y y p

  • They will enable the connection of

another 300 000 new customers (Nairobi another 300,000 new customers (Nairobi takes 60%) in an effort to connect all K b 2030 Kenyans by year 2030.

slide-35
SLIDE 35

POWER QUALITY AND RELIABILITY

OTHER NETWORK REINFORCEMENT PROJECTS BEING UNDERTAKEN COUNTRYWIDE: BEING UNDERTAKEN COUNTRYWIDE:

slide-36
SLIDE 36

No. Project Status

Funding

Total Project Funding (KShs Mill.) Githunguri 33/11kV S/S New 7.5MVA Project start date 1 S/S 2010/11, 121.5 2 Ndenderu Road Substation New 2x10MVA 66/11kV S/S Project start date 2010/11, 356.4 New Athi Substation New 1x23MVA Project start date 2 66/11kV S/S 2010/11, 194.4 4 Kiambu Town 66/11kV S/S New 2x23MVA 66/11kV S/S Project start date 2010/11, 356.4 Rironi 66/11kV S/S New 2x10MVA Project start date 5 66/11kV S/S 2010/11, 330.5 6 Lower Kabete Substation New 2x10MVA 66/11kV S/S Project start date 2010/11, 317.5 Githunguri Substation New 1x23MVA Project start date 7 66/11kV S/S 2010/11, 378.3 8 Athi River EPZ reinforcement 66/11kV S/S New 1x23MVA 66/11kV S/S Project start date 2010/11, 187.9 Vill F S b t ti N 2 23MVA P j t t t d t 9 Villa Franca Substation New 2x23MVA 66/11kV S/S Project start date 2010/11, 304.6 10 Uplands Substation New 1x23MVA 66/11kV S/S Project start date 2010/11, 256 N M t i 66k li 20K 66kV P j t t t d t 11 Ngong – Matasia 66kv line 20Kms , 66kV line Project start date 2010/11, 64 12 Reconductoring 66kv lines 200Kms , 66kV line Project start date 2010/11, 561.3

slide-37
SLIDE 37

13 Mishomoroni Substation New 7.5MVA S/S & 16Km , 33kV line Project start date 2010/11, 210.6 14 Kwale 33kv line 90Kms , 33kV line Project start date 2010/11, 159.6 15 Shimoni – line33kv line 76Kms , 66kV line Project start date 2010/11, 142.6 16 Coast 33kv line Various Project start date 2010/11, 208.2 17 Kwale 33kv line Various Project start date 2010/11, 57.5 j , 18 Ahero S/S New 2.5MVA S/S & 20Km , 33kV line Project start date 2010/11, 121.5 19 Chepseon S/S New 2.5MVA S/S, 5Km , 33kV line,10kms 11kV line Project start date 2010/11, 81 20 Elgon View New 7.5MVA S/S 2Km ,33kV line,2kms 11kV line, Project start date 2010/11, 178.2 21 Kaplamai New 2.5MVA S/S 2Km ,33kV line,2kms 11kV line,, Project start date 2010/11, 194.4 Kibos S/S New 7.5MVA S/S 4Km ,33kV 22 , line,2kms 11kV line, Project start date 2010/11, 194.4 23 Majengo S/S New 2.5MVA S/S, 2Km ,33kV line,2kms 11kV line, Project start date 2010/11, 81 24 Maseno S/S New 7 5MVA S/S Project start date 2010/11 137 7 24 Maseno S/S New 7.5MVA S/S Project start date 2010/11, 137.7 25 Maseno S/S New 1x7.5MVA S/S & 40Km , 33kV line Project start date 2010/11, 187.9 26 Kericho S/S New 1x7.5MVA S/S Project start date 2010/11, 90.7 27 Kapsowar 33kV lines 70Km , 33kV line Project start date 2010/11, 142.6 28 Kabarak University S/S New 1x7.5MVA S/S Project start date 2010/11, 90.7

slide-38
SLIDE 38

29 Kaplamai New 2.5MVA S/S 2Km ,33kV line,2kms 11kV line,, Project start date 2010/11, 167.7 30 Kapsarman 33kV lines 87Km 33kV line Project start date 2010/11 142 6 30 Kapsarman 33kV lines 87Km , 33kV line Project start date 2010/11, 142.6 31 Matutu s/stn New 2.5MVA S/S Project start date 2010/11, 167.7 32 Kibos S/S New 7.5MVA S/S 4Km ,33kV line,2kms 11kV line, Project start date 2010/11, 71.3 West Kenya 33kv lines 412Km 33kV 33 West Kenya 33kv lines 412Km , 33kV lines Project start date 2010/11, 915.3 34 Gatundu 33/11kV S/S New 7.5MVA 33/11kV, 10Km ,33kV line,10kms Project start date 2010/11, 202.5 35 Juja (Ndarugu) 33/11kV S/S New 7.5MVA 33/11kV 5Km ,33kV line,4kms 11kV line, Project start date 2010/11, 97.2 Mwea 33/11/kV s/s New 1x7.5 MVA Txs, 36 22Km ,33kV line,5kms 11kV line, Project start date 2010/11, 153.9 37 Tala 33/11kV S/S New 7.5MVA 33/11kV, 33Km ,33kV line,5kms 11kV line, Project start date 2010/11, 162 Kangema (Muranga) 33/11kv substation 38 g ( g ) new 2x7.5MVA txs, 13km 33kV line and 10km 11kV line Project start date 2012/13, 218.7 Tala 33/11kv substation new 2x7.5MVA 39 txs, 20km 33kV line and 5km 11kV line Project start date 2012/13 105.3 40 Kianjai 33/11kV S/S Uprate to 2x2.5MVA an additional feeder Project start date 2010/11 71.3 TOTAL FUNDING 8,183

slide-39
SLIDE 39

ENHANCING GENERATION CAPACITY:

  • Kenya Power has entered into Power Purchase Agreements (PPA’s)

with several generating companies to ensure Kenyans will continue to with several generating companies to ensure Kenyans will continue to enjoy available power

  • The table below shows the planned generation:

Project Energy Source Capacity Expected (MW) date Tana Redevelopment Hydro 20 Jan 2011 Olkaria Wellhead Geo 70 Jun 2011 Kipevu MSD Thermal 120 Jan 2011 Triumph Power Athi River Thermal 81 Apr 2012 Gulf Power Athi River Thermal 84 Apr 2012 Melec Powergen Thika Thermal 87 Jun 2012 Sangoro Power Plant Hydro 21 Dec 2011 Eburru Geo 2.2 Dec2011 Ngong Wind PII Wind 20.4 Jan 2012 Aeolus Kinangop Wind 60 March 2013 Lake Turkana Power Wind 300 Dec2013 Olkaria Extension Geo 140 Jun 2013 Kindaruma Upgrade Hydro 32 Dec 2013 Athi River Mining Coal Coal 19.5 Dec 2013 Olkaria IV Geo 140 Dec 2013 Orpower additional Geo 52 Dec 2013 Mombasa Coal Plant Coal 300 Dec2014 Ethiopia Import Import 200 Dec 2014 1749

slide-40
SLIDE 40

Thank you