A Trim Trail for Beddington Agenda Item 8 A proposal by Karen - - PowerPoint PPT Presentation

a trim trail for beddington
SMART_READER_LITE
LIVE PREVIEW

A Trim Trail for Beddington Agenda Item 8 A proposal by Karen - - PowerPoint PPT Presentation

Page 17 A Trim Trail for Beddington Agenda Item 8 A proposal by Karen Savage & Tracey Lloyd Park Agenda Item 8 The Proposal: We would like to work with the council and park guardians to have a Page 18 Trim Trail installed in


slide-1
SLIDE 1

A Trim Trail for Beddington Park

A proposal by Karen Savage & Tracey Lloyd

Page 17

Agenda Item 8

slide-2
SLIDE 2

The Proposal:

We would like to work with the council and park guardians to have a Trim Trail installed in Beddington Park. Aimed at adults, a Trim Trail for Beddington Park would bring a whole new dimension to the park.

Page 18

Agenda Item 8

slide-3
SLIDE 3

Why?

Inactivity: is behind a wide range of health issues which costs the NHS money. Cost: can be a barrier to fitness – this would be a free resource for the community Facility For Adults: the trail would make the park even more of a destination. The existing facilities are aimed mainly at young children. This would be aimed at adults and the teenage local school children. This is a different offering to the existing gym equipment which limits the number of users to

  • ne person per machine and one exercise per
  • machine. Each piece of trail equipment would

be multi-functional & accommodate a larger number of users. There is trend towards this style of ‘obstacle running’ e.g. ToughMudder TH THIS WOULD OF OFFER A A STRUCTURED, DE DESIGNED & & COMPLETE CA CARDIO-VASCULAR & & STRE TRENGTH TRA TRAINING WORKOUT

Page 19

Agenda Item 8

slide-4
SLIDE 4

Where & what would it look like?

Our ambition is to have 15 obstacles in groups of 2 or 3 around the park. It would run alongside the main paving areas to ensure maximum visibility/access & for safety reasons. We would work with the council and Friends of Beddington Park to ensure that the trail is entirely in-keeping with the style of the park and will not be an eye-

  • sore. They would be made of play-grade

timber with a life span of around 10-15 years.

Page 20

Agenda Item 8

slide-5
SLIDE 5

Page 21

Agenda Item 8

slide-6
SLIDE 6

Instruction

  • Karen Savage would offer free

monthly ‘introduction to the Trim Trail’ sessions

  • Signs at each obstacle showing
  • ptions and instructions for

exercises

Page 22

Agenda Item 8

slide-7
SLIDE 7

Cost?

Based on indicative quotes we would anticipate a cost of £15,000 based on £1,000 per obstacle. We are exploring additional sources

  • f funding to supplement the

proposal.

Page 23

Agenda Item 8

slide-8
SLIDE 8

What about safety & maintenance?

  • Maintenance could be tied in with the

checks on the playground

  • A rubber-type surface would be underneath

each obstacle to provide grip

  • The design would be durable and risk

assessed.

  • It will be made of treated, play-grade

timber

Page 24

Agenda Item 8

slide-9
SLIDE 9

Support:

  • Within less than 24 hours of launching our

Change.org petition we had more than 150 signatures of support!

  • Th

The e curr current tal ally ly is s over er 600!

  • Click this link for the very latest support!

https://t.co/awoMjCzI24

  • Th

The e Cha hair irman of

  • f Th

The e Fri Friends Of f Beddin ington Park ark , , Ala lan Carr arroll ll, is also on-board with the initiative

Page 25

Agenda Item 8

slide-10
SLIDE 10

CONTACT DETAILS:

KAREN SAVAGE kar aren@be-epic.co.uk 07 0770 702 51 5160 6035 TRACEY LLOYD tr tracey.ll lloyd@gmail. il.com 07 0792 921 93 9353 5399

Page 26

Agenda Item 8