87th air base wing
play

87th Air Base Wing Joint Base McGuire-Dix-Lakehurst Restoration - PowerPoint PPT Presentation

87th Air Base Wing Joint Base McGuire-Dix-Lakehurst Restoration Advisory Board 13 February 2020 87th Air Base Wing Review of Action Items and Perfluorooctane Sulfonate (PFOS) and Perfluorooctanoic Acid (PFOA) Update Mr. James Richman


  1. 87th Air Base Wing Joint Base McGuire-Dix-Lakehurst Restoration Advisory Board 13 February 2020

  2. 87th Air Base Wing Review of Action Items and Perfluorooctane Sulfonate (PFOS) and Perfluorooctanoic Acid (PFOA) Update Mr. James Richman Remediation Program Manager AFCEC/CZOE

  3. Action Items ◼ New Jersey Department of Environmental Protection (NJDEP) asked if vapor extraction was required at other Thermal In Situ Sustainable Remediation (TISR) remediation systems in New Jersey (TISR is the technology being used at TU003). If so, a permit equivalent for the system at TU003 may be required. ▪ Vapor extraction is not required or a part of the TISR systems at the 2 other sites in New Jersey or any of the sites at which Arcadis is deploying the technology at across the country. ◼ Mr. Frank Storm suggested the notice of the Restoration Advisory Board (RAB) meetings be posted in the Pineland Tribune ▪ Joint Base McGuire-Dix-Lakehurst (JB MDL) considered this request but as th eir distribution area does not cover areas north of JB MDL, including Wrightstown, Cookstown, and Jackson Township, it was decided the current newspapers are the appropriate outlet. “WIN AS ONE” 3

  4. PFOS/PFOA Investigation Update ◼ On-Base Actions/Projects: ▪ Completed installation of Ion exchange resin treatment system for 2 on-base backup wells at JBMDL-Lakehurst (Tanaq-HGL) (April 2019) ▪ Install new deep well at JBMDL-Lakehurst (Cape-Weston)  Final Engineering Evaluation/Cost Analysis (EE/CA); Nov 2019 *  Final Action Memo planned for Feb/Mar 2020  60% design complete  Major Modification Permit submitted Dec 2019  Water Allocation Permit planned May/June 2020 ▪ Update Base/Regional Conceptual Site Model (CSM) (Tehama-HGL with USGS)  Multi-year effort (2018-2020)  Includes modeling/mapping for groundwater/surface water to support future investigations ▪ Remedial Investigation (RI) programming for initial bases in FY21; Air Force prioritizing * * Updated since previously reported “WIN AS ONE” 4

  5. PFOS/PFOA Off-base Sampling Update ◼ Off-Base Actions/Projects: ▪ Off-base sampling areas ▪ Confirmed 5 areas where PFOS/PFOA was migrating off-base ▪ JBMDL, EPA, and NJDEP agreed to initial boundaries of ESI areas ▪ Properties with private drinking water wells were identified and were offered sampling of their drinking water (initial sampling Dec 2016) ▪ PFOS/PFOA concentrations exceeding Lifetime Health Advisory (HA) of 70 parts per trillion (ppt) were mitigated (e.g. bottled water, filtration system) ▪ PFOS/PFOA concentrations detected less than Lifetime HA were offered routine monitoring ▪ Data Gaps: ▪ Existing NJDEP Well Database is not complete ▪ Depth of private wells unknown by majority of owners * Updated since previously reported “WIN AS ONE” 5

  6. McGuire Area 4 “WIN AS ONE” 6

  7. Dix Area 14 “WIN AS ONE” 7

  8. Lakehurst Areas 16 & 17 “WIN AS ONE” 8

  9. Lakehurst Area 18 “WIN AS ONE” 9

  10. PFOS/PFOA Off-base Sampling Update Off-Base Drinking Water Sampling Status (13 Jan 2020) Routine PFOS/PFOA Packages Response Monitoring Areas Distributed Samples Percentage > EPA HA Locations 4 42 30 71% 0 1 14 40 27 68% 0 1 16 98 75 77% 1 13 17 77 53 69% 0 6 18 10 9 90% 4* 6 * 1 property connected TOTALS: 267 194 73% 5 27 to municipal water no longer counted in total “WIN AS ONE” 2 PFNA detections < 13 ppt 10

  11. PFOS/PFOA Off-base Sampling Update ◼ Off-Base mitigations: ▪ Area 16 - 1 RO Unit ▪ Area 18 - 1 GAC systems, 3 bottled water ▪ Connection to municipal water and well abandonment in progress ▪ NJDEP mitigations - NJDEP providing mitigation where Air Force samples < EPA Lifetime HA level (70 ppt PFOS/PFOA, individual or combined) but > NJDEP proposed MCL of 13 ppt PFOS or 14 ppt PFOA ▪ Area 16 - 1 GAC system, 1 pending ▪ Area 17 - 1 GAC system ▪ Area 18 - 1 pending GAC – granular activated carbon HA – Health Advisory MCL – Maximum Contaminant Level RO – reverse osmosis “WIN AS ONE” 11

  12. PFOS/PFOA Off-base Sampling Update Off-base Actions/Projects (cont.) ▪ New Off-base Sampling Contract (FY18) Objectives: ▪ Confirm limits of existing ESI areas are protective ▪ Install limited number of monitoring wells (MWs) in existing ESI areas to evaluated PFOS/PFOA concentrations ▪ MWs installed to multiple depths in surficial aquifer ▪ Expand areas if PFOS/PFOA detected above NJDEP proposed Maximum Contaminant Levels (MCLs) ▪ Perform hydrologic study of Pine Lake (Manchester Township) and Little Pine Lake (Pemberton Township) ▪ Team with US Geological Survey ▪ Install MWs and collect surface water samples to evaluate if lakes are “losing” ▪ If confirmed, create new ESI area and identify private drinking water receptors “WIN AS ONE” 12

  13. PFOS/PFOA Update QUESTIONS? “WIN AS ONE” 13

  14. 87th Air Base Wing Joint Base McGuire-Dix-Lakehurst Performance Based Remediation Contract Update Mr. Tim Llewellyn, Project Manager Arcadis 14

  15. SUMMARY OF PROGRESS ◼ Continuing development and submittal of National Priorities List (NPL) documents for the McGuire Area Operable Units (OUs) ▪ OU3 Remedial Design (RD) will be submitted to Air Force (AF) this month with action planned for Fall 2020 ▪ OU1 Proposed Plan (PP) in public comment period and a Record of Decision (ROD) is planned for this year ▪ OU4 Feasibility Study (FS) moving toward finalization and a PP and ROD are also targeted for this year ◼ State led sites at McGuire and Dix ▪ Remedies in place operating well (TU003 supplemental remedy is starting up this week) ▪ 10 more sites have a 2020 closure goal (30 closed to date under the performance-based remediation [PBR])—111 total for JB MDL ◼ Active remedies (air sparge [AS]/soil vapor extraction [SVE] systems) • McGuire: TU013 is in a rebound study (with systems back on currently) • McGuire : TU023 has achieved remedial goals and will move toward closure this year • Dix : NW044 and TU019a are all in rebound studies (with systems back on currently) • Dix : All remedial goals at TU970 have been achieved and the system will be removed upon final NJDEP approval of closure • Lakehurst : Areas A/B/C systems have been running well – enhancements have been deployed “WIN AS ONE” 15

  16. FOCUSED PRESENTATIONS ◼ LF019 Time Critical Removal Action (TCRA) Status (Shell Casing Removals) ◼ TU003 Revised Remedy Buildout Complete ◼ TU011 Soil Excavation Complete ◼ BOMARC Remedial Construction has Started “WIN AS ONE” 16

  17. PBR UPDATE McGUIRE NPL SITES “WIN AS ONE” 17

  18. McGuire Update OU1 Summary Work started on next document Work pending FS COMPLETE PP COMPLETE ROD FY20 Operable Unit 1: Two former landfill sites and one former recycling yard Status: Pre-Design investigation of LF003 landfill cover complete PP Final Remedy under public comment REMEDY Fiscal Year (FY)20/21 Path forward: ROD FY20 Remedial Action targeted late 2020/2021 if public concurs with remedy “WIN AS ONE” 18

  19. McGuire Update OU2 Status Summary Work started on next document Work pending FS FY20 PP FY21 Operable Unit 2: 10 sites: Former aircraft maintenance; oil water separators; former power plant; etc. Status: Draft Final FS under preparation (responding to regulator comments) ROD FY21 Path forward: FS evaluates groundwater remedies (in-situ chemical oxidation [ISCO]; AS/SVE; hydraulic containment; monitored natural attenuation [MNA]) and excavation or land-use restrictions for soils REMEDY FY22 PP and Public Meeting early FY21 ROD FY21 Remedial Action to be implemented 2022 “WIN AS ONE” 19

  20. McGuire Update OU3 Summary Work started on next document Work pending FS Complete PP Complete ROD Complete (LF019 FY21) Operable Unit 3: Three former landfill sites and one sludge disposal site Status: Final ROD for 3 of the 4 sites and action moving forward Discarded and expended 106 mm cartridges (primers may be REMEDY intact) found in limited area at LF019 and a removal action is required before the ROD can be finalized FY20/21 Path forward: Remedial Action will be implemented late FY20 except LF019 LF019-- TCRA to remove discarded cartridges ROD and Action in FY21 “WIN AS ONE” 20

  21. OU3 SITE LOCATIONS “WIN AS ONE” 21

  22. OU3 REMEDIAL DESIGN – SOIL CAPS “WIN AS ONE” 22

  23. LF019 TCRA Update 106 mm Recoilless Cartridge Casings “WIN AS ONE” 23

  24. LF019 TCRA Update ◼ Contract to Remove the Items Awarded September 2019 to Seres- Arcadis Joint Venture ◼ First 4 months • Near Final Project Management Plan: Plan that defines how the project is executed, monitored, and controlled. • AF review of Explosive Safety Submittal (ESS): Department of Defense (DoD) only document that sets separation distances and other requirements to provide the maximum possible protection to people and property . • AF review of Action Memorandum (AM): U.S. Environmental Protection Agency (EPA)/NJDEP reviews the AM that documents the AF’s decision to undertake a TCRA of Material Potentially Presenting an Explosive Hazard (MPPEH) at LF019. “WIN AS ONE” 24

  25. “WIN AS ONE” 25

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.