6/12/2015 Construction/Permitting Violations Illicit Discharge/ Illicit Connection/ Improper Disposal Failure to Comply with a Permit Failure to Comply with Permanent Stormwater Management Requirements Failure to Comply with a


slide-1
SLIDE 1

6/12/2015 1

 Construction/Permitting Violations  Illicit Discharge/ Illicit Connection/ Improper

Disposal

 Failure to Comply with a Permit  Failure to Comply with Permanent Stormwater

Management Requirements

 Failure to Comply with a County Request 1. Initiation of construction activity without a site development/land disturbing/grading permit.

slide-2
SLIDE 2

6/12/2015 2

2. Failure to properly operate and/or maintain all BMPs, components, facilities, and equipment associated with site Erosion Prevention and Sediment Control (EPSC).

  • 1. Number of days per violation
  • 2. Calculate economic benefit of non-compliance
  • 3. Potential for harm
  • 4. Extent of deviation
  • 5. Recalcitrance (1.1 to 2.5 multiplication factor)
  • 6. Multiple violations (1.1 to 2.5 multiplication

factor)

  • 7. Repeat Violator (1.1 to 3.0 multiplication factor)
  • 8. Degree of cooperation/good faith efforts (15%)
  • 9. Measures to prevent reoccurrence (15%)

10.Other considerations (20%)

Politics

slide-3
SLIDE 3

6/12/2015 3

Extent of Deviation

Minor Moderate Major

Potential for Harm

Minor $0 – $1,500 $1,500 – $3,000 $3,000 – $4,500 Moderate $1,500 – $3,000 $3,000 – $4,500 $4,500 – $6,000 Major $3,000 – $4,500 $4,500 – $6,000 $6,000 – $7,500 Penalty Range

 Pre-Co

Constructi ction Meeti ting – NTC issued

  • LDA w/o permit

 2nd Inspecti

ction – NTC issued

  • Unmaintained BMPs (2)

 3rd Inspecti

ction – NTC issued

  • Work occurring outside of install/maint. of

stormwater controls

  • Unmaintained BMP (1)
  • Off-site impacts to TSS impaired waterbody
slide-4
SLIDE 4

6/12/2015 4

Schmidt Farms Civil Penalty Calculation Maximum Allowable penalty by ordinance = $108,000 1) Economic Benefit of non-compliance – Undetermined 2) Construction/Permitting Violations = $750

  • A. Potential for Harm – Minor
  • B. Extent of Deviation – Minor

3) Operation & Maintenance = $10,125

  • A. Potential for Harm – Major
  • B. Extent of Deviation – Major
  • C. Multiple Violation Factor – 1.5 ($6750 x 1.5 = $10,125)

4) Failure to Comply with a County Request = $5,250

  • A. Potential for Harm – Major
  • B. Extent of Deviation – Moderate

750 + 10,125 + 5,250 = $16,125 The calculated civil penalty of $16,125 was determined to be more appropriate than the maximum allowable penalty of $108,000. Penalty reduced 15% for reoccurrence prevention and another 20% due to other considerations for a total penalty of $10,965. The penalty is to be paid as follows: $3,655 due on June 27, 2014, September 30, 2014, and December 31, 2014 __________________________ _______ John Schmidt Date