2017 COMPANY PRESENTATION Presentation & Portfolio 1 SC - PowerPoint PPT Presentation

2017 COMPANY PRESENTATION Presentation & Portfolio 1 SC TIEFBAU GmbH SC TIEFBAU GmbH TABLE OF CONTENT We help build OUR COMPANY 4 a better future! PROJECT PORTFOLIO 12 CERTIFICATE 7 CONTACT 44 OUR CUSTOMERS & PARTNERS 11 3


  1. 2017 COMPANY PRESENTATION Presentation & Portfolio 1

  2. SC TIEFBAU GmbH SC TIEFBAU GmbH TABLE OF CONTENT We help build OUR COMPANY 4 a better future! PROJECT PORTFOLIO 12 CERTIFICATE 7 CONTACT 44 OUR CUSTOMERS & PARTNERS 11 3

  3. About Us OUR SC TIEFBAU GmbH COMPANY SC TIEFBAU was founded on We have accomplished complex earnestnessness and devotion, projects in many countries, like specialized on civil, tunnel, road and Germany, Austria, Italy, Poland, railroad engineering. Romania and until now we have not Despite the hard economic times, we reached our limits. managed to prosper and to expand our Because our clients are very important activity. to us, we let their dreams and ideas be Honesty,integrity and devotion those that guide our entire activity. brought us on our current standing We are always looking for challenging and will continue to guide our steps in and new projects, which can lead us to the future. perfection. From tunneling, highways, railroads, We strive to leave behind works that civil buildings, bridges, to bank vaults, proudly represents us, completed with you name it. We have build everything! our solid work performance. We have managed to reach our current We help build a better future! reputation because we have the best Dipl. Ing. Cristian Stingu and qualifjed work team. Chief Executive Offjcer Dipl. Ing. Cristian Stingu C.E.O. , SC TIEFBAU GmbH 4

  4. Certifjcations 7

  5. SC Tiefbau GmbH is entitled to carry out construction work in Austria, within the cross-border service. 8

  6. CLIENTS & PORTFOLIO 11

  7. ESO SUPERNOVA GARCHING PROJECTS PORTFOLIO Construction: Current: Highly complex civil engineering with individual, Visit of the German construction press 09.10.2015; 3D shell curved walls. Webcam: Webcam1 + Webcam2; The outer shells are provided with ramps towards the Core data: approx. 8,000 m² special formwork; inner core. Approx. 1,000 tons of reinforced steel; The completion of the individual bowls is made over the Approx. 5.100 m³ of concrete. last fmoor. The special formwork consists of base grids. Execution The building is done using reusable and disposable 2015 /2016 moldings. The concept and the building was done, using the developed last tower. Using a smart logistic, the construction was made in a very economic way. 12

  8. NESTLÉ BIESSENHOFEN Construction: Customer: HORUS, expansion of production facilities- Nestlé Deutschland AG Biessenhofen; Lyoner Street 23 Massive construction made of reinforced concrete; 60523 Frankfurt Single wall heights of up to 13 m from one piece; Main Contractor: Grossmann-Bau Gmbh Room heights up to 26 m; Ceilings with shale heights up to 15 m; Architect / Construction management Hall construction in FT construction, FT-binding, as well as IE-Food Engineering GmbH FT-prestressed concrete ties; Paul-Gerhardt-Allee 48 Hall roofs with wood construction up to approx. 30 m; 81245 Munich The entire building activity and construction was made Execution time under the conditions of the international food guidelines. May2009 to February 2010 Contract value: ca. 12.500.000,00 € nett 15

  9. BMC MARTINSRIED Construction: Load-bearing interior wall elements are made of Biomedical Center Martinsried-Planegg. reinforced concrete. The project consists of four main buildings, 4,000 m² exposed concrete walls in SB3 and G. T. Two lower fmoors. Columns in SB2. Total fmoor area: approx. 43,300 m³; Overall interior surface: approx. 179,000 m³; Building dimensions: Execution time: Largest length about 180 m; May 2011 to August 2013 Largest width about 105 m; Largest height about 21 m from zero elevation; Main Contractor: Grossmann-Bau Gmbh Greatest depth about -11 m from zero elevation; The lower fmoors are made of reinforced concrete, with role of Contract value: covering of the basement, as a WU-construction. ca. 15.500.000,00 € nett 16

  10. GE Global Research ZN of General Electric Construction: Construction Management: Reinforced concrete UG as WU construction with up to 1.00 m Ernst² Architekten - Munich Offjce high-quality thick fmoor; Heinrich-Groh-Street 9 Up to C50/60 over 3.000 m² sand-lime structure in the basement; 80939 Munich 220 tons steel construction of the excavation pit, shoring, shell and steel construction, roof sealing work. Main Contractor: Grossmann-Bau Gmbh Customer: GE Global Research Execution time: ZN of General Electric January 2014 to November 2014 Germany Holding GmbH Freising Highway 50 Contract value: 85748 Gaching near Munich ca. 7.700.000,00 € nett 19

  11. DAV Climbing Center MÜNCHEN-FREIMANN Construction: Architect: Rgp Architekten Reinforced concrete construction in WU, with walls up to 17 m Residenz Street 27 high; 80333 Munich Inclined roof made of reinforced concrete, with a pitch of 47 °and a height of up to 17 m; Main Contractor: Berlin shoring excavation was highly contaminated with weapons Grossmann-Bau Gmbh and disposal. Execution time: Customer: May 2010 to Oktober 2010 Trägerverein der Münchner Sektionen für die Kletteranlage München-Thalkirchen e.V. Contract value: Thalkirchner Street 207 ca. 1.550.000,00 € nett 81371 Munich, Germany 20

  12. PUBLISHING HOUSE BAIERBRUNN Architect: Baumstark Bielmeier Architekten GbR Construction: Belgrad Street 2480769 Munich Three fmoors construction, with three underground garage and two car elevators; Customer: Isartalmedien GmbH & Co.KG Flat foundation in a 20 m deep excavation pit, over a massive Wolfratshauser Straße 982065 Baierbrunn reinforced concrete fmoor, with an average thickness of 1.20 m. Complete underfmoor as a “white basin”, with heights of up to Construction Management: 6.80 m high-quality exposed concrete surfaces: M3 Bauprojektmanagement GmbH -SB3 visible concrete: Inside the elevators, with lathe inserts; Ernsberger Street 5 -SB4 visible concrete: all arrow projections and support,as well as 81241 Munich the entire portal wall; Concrete brightening by adding 3% titanium dioxide. 23

  13. OFFICE BUILDING H6/H7 AUDI INGOLSTADT It was the task of the architects to create a new Architect:Behnisch Architekten, administrative building of 3-5 fmoors of the exciting Audi AG Munich Design headquarter in Ingolstadt. Due to its amazing appearance and structure, the building is able to adapt to the surrounding Ingolstadt, Germany environment. Audi Real Estate GmbH The highly fmexible and communicative offjce building ofgers around 2,800 work places, a restaurant and a conference Size: 94.750 qm / 1,020,000 sq.ft. room. Volume: 357.380 cbm / 12,618,500 cu.ft. The building also has an underground parking. The plan was designed in two separate phases. Competition The confjguration of the building was made for large 2012, Study offjces, groups and individual offjces, all in variable sizes. 24

  14. AMF ARTHREX FREIHAM Construction: Architect: Gernalplanung O.S.A Ochs Schmidhuber Ar- Construction of an administration and training center chitekten Müller Street 20, 80469 Munich with underground garage; Reinforced concrete massive construction; Customer: - conventional foundation of the underground car park, building Arthrex GmbH strip foundations, fmoor slab + foundation reinforcements; Main Contractor: - structural elements in skeleton construction made of reinforced Grossmann-Bau Gmbh concrete with point-supported ceilings; Execution time: - all staircases, including the elevator cores, scarf and anchor Oktober 2012 to August 2013 image are made according to the architects’ specifjcations; Contract value: - walls have SB4 requirement; ca. 5.500.000,00 € nett - exposed concrete ceilings SB4 in the foyer and over; The staircases have a total surface of approximately 1,000 m². 27

  15. MESSEHALLEN RIEM Messe München GmbH created two new exhibition halls, Architect: Jesse Hofmayr Werner Architekten BDA | with connecting structures between north and south. Nymphenburger Street 86 80636 Munich The buildings are located on the former airport grounds from Munich-Riem. Execution time: The new building was made to be a complete and 2016 / 2017 complex project, regarding the existing hall structure of Messe Main Contractor: München. The building is also oriented in a constructive, creative Grossmann-Bau Gmbh way, using the best materials for the entire construction. Planning: Planning Authority NEUE MESSE Munich Data of individual buildings: OBERMEYER Planen + Beraten GmbH North connection: L: approx. 200 m | Width: approx. 30 m. South connection: L: approx. 200 m | width: approx. 10 m. Specifjcations: ca. 30.000 m³ Mixed Concrete Hall C5: Length: approx. 120 m | Width: approx. 75 m. ca. 6.000 t Structural Steel Hall C6: Length: approx. 120 m | Width: approx. 75 m. 28

  16. WOHNANLAGE UNTERFÖHRING New buildings- multi-family houses with underground parking, Architect:Haushofer & Gnadke Architekten - In Lohwiesenweg / Dorfanger in Unterföhring Engineers | Hansa Street 51,81373 Munich Construction: Main Contractor: Terraced houses made of reinforced concrete or brick Grossmann-Bau Gmbh & Co. KG construction, with FT balconies + stairs + underground garages. Execution time: Customer: April 2010 to April 2011 Deck Grundstücksverwaltungs GmbH & Co. Kroiß GmbH & Co. land ownership I KG Contract value: Feldkirchener Street 14a ca. 2.600.000,00 € nett 85622 Weißenfeld, Germany 31

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.