- WorldClass,
World Class, Highest Quality Shovel Ready, Frac Sand Product - - PowerPoint PPT Presentation
World Class, Highest Quality Shovel Ready, Frac Sand Product - - PowerPoint PPT Presentation
World Class, Highest Quality Shovel Ready, Frac
- VictoryNickel
CompanyProfile
- SupplyingCanadawithHighest
QualityFrac Sand
- MultiPhasedBusinessPlan
- Phase1complete
- Salesongoing
- Phase2approvedbyboard
- OwnershipofWisconsinandManitoba
fracsandresources
- PermittingofWisconsinproperty
underway
- Phase3Winnipegsiteselectionongoing
- Developmentofdomesticandadditional
Wisconsinsandprogramsareinprogress
- OneCompany
TwoCompellingInvestmentOpportunities
- WellPositionedforResurgencein
NickelMarket
- FourNickelProjectsinCanada:
- Over1billionlbs nickelinM&Iresource
- FlagshipMinagoProjectinManitoba:
- Feasibilitystudycomplete,permittedfor
development
- FracsandcoproductatMinago
- CompanyHistory
FromNickeltoFracSand
2007: VictoryNickelcreated 2009: FeasibilitystudyforMinago:significant frac sandbyproductvalueidentified 2011: Minago permittedforproduction 201112: Meaningfuldeclineinnickelprices 2012: VictorySilicacreatedtohelpunlock valueoffrac sandatMinago 2013: Fracsandbusinesscreated,independentof Q12014:Proofofconcept:firstfrac sandsales Q32014:7PersonsPlantcommissioningcomplete Q42014:OptionsignedtoacquireWIfracsandresource 2016: 7PersonsPlant oncare&maintenancedueto downturn Q12017:Fracsandsalesresume
FracSand Nickel
- ExperiencedManagement
VictorySilicaLimited
- RenéR.Galipeau/Chairman
35+yearsminingexperiencewithHudsonBay,BreakwaterResources,LacMinerals,RioAlgom.CurrentViceChair&CEOofVictoryNickel.
KenMurdock/CEO&Director
Engineerwithover25yearsexperienceintheaggregate/construction&oilfieldmaterials/frac sandindustries.Inadditiontooperatingas anindependentconsultantinCanadaandWisconsin,frac sandindustryexperienceincludesCanfrac Sands(operations),UnitedIndustrial Services (design,permitting,construction,operationandmarketingofasilicasandprojectinPeaceRiver)andLafargeCement.
TroyBergen/PlantManager,SevenPersonsFracSandFacility
- OperatedtheSevenPersonsfracsandfacilitybetween2008and2010withpreviousowner3RSandLtd. Prior tothat,hewasOperations
ManagerwithCleanEarthEnvironmentalLtd.
PaulL.JonesGeologicalConsultant
GeologistandQPwith25+yearsexperiencewithmorethan20juniors
SeanStokes/CorporateSecretary
(SeeVictoryNickelAppendix)
- ShaleGas/TightOilRevolution
FracSandBoom
- Unconventional‘shalegas’and‘tightoil’previouslyuneconomictorecoveratalarge
scale
- Efficiencygainsinhorizontaldrillingandtheintroductionof‘fracking’helpedunlock
vastnaturalgasandoilresources
- TherapidimplementationoftechnologychangedtheNorthAmericanenergy
landscape,witha“sand boom”beingaresultingfactor
FracsandisaneffectivewaytoparticipateinNorthAmerica’s rampant‘unconventional’oilandgasproductiongrowth
- Whatis‘Fracking’?FracSand?
Notallsandmakesfrac sand!
- Hydraulic fracturing or‘fracking’isatechniqueusedinthedevelopmentof
- il&gasformationsto increase flow and extend w ell life.
Proppant (suchasfrac sand)holdsor‘props’theformationopen,increasesporosity,
andincreasesoil/gasflowtothewellhead
- Frac sand mustmeetuniqueAPIspecificationssuchasmineralogy,
roundness andstrength foruseintheoil&gasindustryasaproppant
Victory Silica’s FracSand
30/50 20/40
- Proppant/FracSandMarket
HydraulicallyFracturedWellsontheRise
USOilProduction(20002015)
- Proppant/FracSandMarket
RigCountontheRise
NorthAmericanRigCounts(JanNov2016)
- Proppant/FracSandMarket
FracSandIntensityontheRise
- IndustryAverageProppantperFracJob
- Averagesanduseperwellhasincreasedby128%Q12016overQ22012
- Refrackingofwells
- Uncompletedwellsinventory
- Proppant/FracSandMarket
ProppantDemandontheRise
- QuarterlyNorthAmericanProppantDemand
- FracSandPriceIndex
FracSandPricingontheRise
- Manitoba,Saskatchewan,Alberta,B.C.,NorthDakota
NorthAmericanShaleBasins
InitialSupplyOpportunities
- VictorySilicaBusinessPlan
Phased Approach– ClearPathforGrowth
Phase1:MarketEntry
SevenPersons(dry)Plant:
processinginfrastructurein Alberta(500ktpa)
Shipcontracted(wet)sand
fromWisconsin
Washplantcapability Strategicstoragecapacity
Phase3:Growth
Winnipeg(dry)plant:
processinginfrastructurein Manitoba(1,040ktpa)
Siteidentifiedwithfavourable
logistics(CN,CP,BNSF)
Initiallysuppliedfrom
Wisconsin
MinagoSand
Longertermupside Currentlylookingatsmaller
pitconfigurationtotargetfrac sandonly
Phase2:VerticalIntegration
WisconsinmineJVincludingwashplant
- wnership/frac sandpropertyoption
Securityofsandsupply/qualitycontrol Marginenhancement
- Processingpurchasedimportwetsand
(concentrate)fromWisconsin
- SevenPersonsPlant
- Fullyfunctioningsandplanton22.4acres
- 22,000tonsproductstoragecapacity
- $6.0Mcapextotakedryplantcapacityto
500,000tpa(complete)
- 120,000tpa washplantcapability
Phase1:MarketEntry
SevenPersonsPlant– MedicineHat,Alberta
- DrySandProgram
Shipdry,finishedWisconsinnorthernwhitefracsandbyrailtoFort Saskatchewantransload EnhancedpricingandmarginduetocloserproximitytocustomersinGrande Prairieandotherplayswherefracsandiscurrentlyindemand 7PersonsPlantavailableasbackupintheeventofrail/othersupplydisruptions
- DomesticSandProgram
SupplyingdomesticandimportedsandwasalwaysapartofinitialPhase1plan; highdemandforWisconsinsandin2014putdomesticsandsalesonhold Today’smarketrealitiesmakesdomesticsandmoreattractiveforcostsavings 7PersonsPlanthas120,000tpa wetsandprocessingfacilityalreadyonsite; ~$150,000capextogetwetplantupandrunning,whennecessary
VictorySilica
OngoingSupplementalPrograms
- Phase2:VerticalIntegration
WisconsinProperty/WashPlant
- Securesandsupply,enhancemargins
- Enteredintooptionagreementtoacquire
Wisconsinfrac sandproperty
- ApprovalfromBoardorDirectorstoproceed
withPhase2,includingconstructionofa 1,000,000tpy fracsandwashplantinWI
- Oilpricecrashputthisonhold
- Providessignificantflexibilitytoadaptto
marketconditions
- Phase3:Growth
WinnipegProcessingSite
- BuildprocessingfacilityinWinnipeg
Leaseexistingrailsupportedindustrial
site
Constructnewdryplant– 18mos.
fromstart
SupplyfromWisconsinandarea
(Minago longertermsupplyoption)
TargetWesternCanada(CN)andUS
Bakken (CP,BNSF)markets
- Minago Project
Nickel/FracSandCoProduction
OneofCanada’slargest undevelopedsulphidenickelresources Positivefeasibility study completed;permitted forproduction
Frac sand asignificantvaluedriver:US$2.90/lbNiincoproductvalue
basedonfeasibilitystudy
Superb location:Manitoba;road,rail,poweraccess
11.2milliontonnefrac sandresource,2 billion tonne potential
Potentialforsmaller,lesscapitalintensivepitconfigurationtotargetfrac sandonly
Valuable“CALL OPTION ” onnickelat$10.00/lb+
- MinagoProject
CoProduct:FracSand
FeasibilityStudyHighlights
- 11.2milliontonnesmarketablefrac
sandinpitfootprintalone
- Minedoverfirstthreeyears
- Salesover10years
- Coproductvalueperpoundofnickel
=$4.04(US$3.68);optimized:$3.18 (US$2.90)
- Fulldetailsinfeasibilitystudy
availableonSEDAR
- FracSand
Nickel
- MinagoProject
FracSandPotential
Existingresourcewithincurrentpitshell: 15Mt Existing&proposedquarryleases: 75Mtpotential* Proposedquarryexplorationpermits: 475Mtpotential* Entirelandpackage(mineralleases+ miningclaims): 2Bt potential*
The“Call Option”
- CompanyProfile
NickelProjects
FourAdvancedSulphide NickelProjects
Over1billionpoundsofnickelinMeasuredandIndicatedresources and300millionpoundsofInferredresources,NI43101compliant
LynnLakeoptionedtoCorazonMining
- MinagoProject
TheProperty
- Welllocated
- Sulphidenickeldeposit
- Exceptionalmetallurgy
- Openpitandundergroundmining
potential
- Bankablefeasibilitystudyonopen
pitonly
- Exceptionalexplorationupside
- MinagoProject
ReservesandProductionUpside
- NoseDepositopenpit:
8.6yearminelife Feasibilitystudydoesnotinclude:
- NoseDepositU/G(inferred
resource)
- NorthLimb:Explorationtarget
- Mineralizationopentowest,
northandatdepth
- Combinedresourcesprojected
minelifeof>20years
- MinagoProject
NickelConcentrateAssay
- MinagoProject
FeasibilityStudyOptimization
- MinagoSulphideNickelProject:EconomicSummaryComparison
BaseCase Dec.14,20091
($millionexcept%&yrs)
BaseCase July19,20111,2
($millionexcept%&yrs)
AtToday’sMetalPrices
Undiscountedcashflow 917.7 1,418.4 951.3 NPV@8% 293.8 513.0 278.0 NPV@6% 402.6 669.3 392.6 IRR 17.7% 22.4% 16.5% PreProductionCapital 593.0 585.1 558.0
- 1. ThreeyeartrailingaverageUS$metalpricesandexchangerateasofmarketcloseDecember10,2009:Ni:
$11.19/lb;Cu:$2.91/lb;Pd:$322.4/oz;Pt:$1,353.98/oz;Au:$836.25/oz;Co:$27.73/lb;Ag:$14.25/oz;$Can/$US exchangerate:1.097
- 2. Updatedresource
- MinagoProject
CostSummary
- C1 CashCostPerlb Ni
Feasibility Study After Optimization NetofCredits* US$1.94(C$2.12) US$2.20 (C$2.41) MetalByProduct Credits US$0.72(C$0.79) US$0.77(C$0.85) FracSandByProduct Value US$3.68(C$4.04) US$2.90 (C$3.18) CashCostperlbNickel BeforeCredits US$6.34(C$6.95) US$5.87(C$6.44)
*NetC1costsincreasewhenmetalproductionincreaseswithoutcorrespondingfrac sandincrease(samesizepit)
- MelProject
Overview
100%owned 25kmnorthofThompson Nearsurface,ramp/pitaccessible
resource
Directshippotential MillingagreementwithValeatcash
cost+5%*
Ongoingeconomicevaluation Metallurgicaltesting
Classification Tonnes (millions) Grade (%Ni) InSituNickel (millionslb)
Mel** Indicated 4.3 0.875 83 Inferred 1.0 0.839 19
- LacRocher Project
Overview
Nearsurfacedeposit,highgrade component,directshippotential PEAindicatesbreakeven~C$10 Ni/lbandC$3.84/lbCu
EISsubmitted,accessroad
complete
Onsiteupgrading:DMS,optical
sortingbeingevaluated
Classification Tonnes (millions) Grade (%Ni) InSituNickel (millionslb) LacRocher** Measured 0.29 1.23 8 Indicated 0.51 1.05 12 TotalM&I 0.80 1.12 20 Inferred 0.44 0.65 6
**At0.5%nickelcutoff
- VictoryNickel
BoardandManagement
CynthiaThomas/Chair
MBA,20+yearsinternationalminingandprojectfinance,formerDirectorMiningInvestmentBanking– ScotiaMcLeod
RenéR.Galipeau/CEO&Director
30+yearsminingexperiencewithHudsonBay,BreakwaterResources,LacMinerals,RioAlgom
PeterR.Jones
Engineer,formerCEOofHudbayMinerals,40+yearsminingexperiencewithHudbay,Cominco,CapeBretonDevelopment,Granduc OperatingCo.andAdanacMolybdenum
MichaelAnderson
Lawyer,nineyearsasGeneralCounselandSecretarywithDenisonMines,previouslyapartnerwithGowlingLafleurHendersonLLP,in housecounselwithJohnLabatt,GeneralCounselforSwiftCanadian
RolandHorst
35yearsminingexperienceasaCEO,banker,investmentbankerandgeologist
- PaulL.Jones/GeologicalConsultant
GeologistandQPwith25+yearsexperiencewithmorethan20juniors
SeanStokes/VPCorporateAffairs&CorporateSecretary–VictoryNickelInc.
20+yearsfinance,businessdevelopment,communicationsexperience,incl.TiberonMinerals,LibertyMinerals,ScandinavianMinerals, NuinscoResources
- Disclaimer