World Class, Highest Quality Shovel Ready, Frac Sand Product - - PowerPoint PPT Presentation

world class highest quality shovel ready frac sand
SMART_READER_LITE
LIVE PREVIEW

World Class, Highest Quality Shovel Ready, Frac Sand Product - - PowerPoint PPT Presentation

World Class, Highest Quality Shovel Ready, Frac


slide-1
SLIDE 1
  • WorldClass,

ShovelReady, NickelSulphide Project HighestQuality FracSandProduct Availableinthe CanadianMarket

slide-2
SLIDE 2
  • VictoryNickel

CompanyProfile

slide-3
SLIDE 3
  • SupplyingCanadawithHighest

QualityFrac Sand

  • MultiPhasedBusinessPlan
  • Phase1complete
  • Salesongoing
  • Phase2approvedbyboard
  • OwnershipofWisconsinandManitoba

fracsandresources

  • PermittingofWisconsinproperty

underway

  • Phase3Winnipegsiteselectionongoing
  • Developmentofdomesticandadditional

Wisconsinsandprogramsareinprogress

  • OneCompany

TwoCompellingInvestmentOpportunities

  • WellPositionedforResurgencein

NickelMarket

  • FourNickelProjectsinCanada:
  • Over1billionlbs nickelinM&Iresource
  • FlagshipMinagoProjectinManitoba:
  • Feasibilitystudycomplete,permittedfor

development

  • FracsandcoproductatMinago
slide-4
SLIDE 4
  • CompanyHistory

FromNickeltoFracSand

2007: VictoryNickelcreated 2009: FeasibilitystudyforMinago:significant frac sandbyproductvalueidentified 2011: Minago permittedforproduction 201112: Meaningfuldeclineinnickelprices 2012: VictorySilicacreatedtohelpunlock valueoffrac sandatMinago 2013: Fracsandbusinesscreated,independentof Q12014:Proofofconcept:firstfrac sandsales Q32014:7PersonsPlantcommissioningcomplete Q42014:OptionsignedtoacquireWIfracsandresource 2016: 7PersonsPlant oncare&maintenancedueto downturn Q12017:Fracsandsalesresume

FracSand Nickel

slide-5
SLIDE 5
  • ExperiencedManagement

VictorySilicaLimited

  • RenéR.Galipeau/Chairman

35+yearsminingexperiencewithHudsonBay,BreakwaterResources,LacMinerals,RioAlgom.CurrentViceChair&CEOofVictoryNickel.

KenMurdock/CEO&Director

Engineerwithover25yearsexperienceintheaggregate/construction&oilfieldmaterials/frac sandindustries.Inadditiontooperatingas anindependentconsultantinCanadaandWisconsin,frac sandindustryexperienceincludesCanfrac Sands(operations),UnitedIndustrial Services (design,permitting,construction,operationandmarketingofasilicasandprojectinPeaceRiver)andLafargeCement.

TroyBergen/PlantManager,SevenPersonsFracSandFacility

  • OperatedtheSevenPersonsfracsandfacilitybetween2008and2010withpreviousowner3RSandLtd. Prior tothat,hewasOperations

ManagerwithCleanEarthEnvironmentalLtd.

PaulL.JonesGeologicalConsultant

GeologistandQPwith25+yearsexperiencewithmorethan20juniors

SeanStokes/CorporateSecretary

(SeeVictoryNickelAppendix)

slide-6
SLIDE 6
  • ShaleGas/TightOilRevolution

FracSandBoom

  • Unconventional‘shalegas’and‘tightoil’previouslyuneconomictorecoveratalarge

scale

  • Efficiencygainsinhorizontaldrillingandtheintroductionof‘fracking’helpedunlock

vastnaturalgasandoilresources

  • TherapidimplementationoftechnologychangedtheNorthAmericanenergy

landscape,witha“sand boom”beingaresultingfactor

FracsandisaneffectivewaytoparticipateinNorthAmerica’s rampant‘unconventional’oilandgasproductiongrowth

slide-7
SLIDE 7
  • Whatis‘Fracking’?FracSand?

Notallsandmakesfrac sand!

  • Hydraulic fracturing or‘fracking’isatechniqueusedinthedevelopmentof
  • il&gasformationsto increase flow and extend w ell life.

Proppant (suchasfrac sand)holdsor‘props’theformationopen,increasesporosity,

andincreasesoil/gasflowtothewellhead

  • Frac sand mustmeetuniqueAPIspecificationssuchasmineralogy,

roundness andstrength foruseintheoil&gasindustryasaproppant

Victory Silica’s FracSand

30/50 20/40

slide-8
SLIDE 8
  • Proppant/FracSandMarket

HydraulicallyFracturedWellsontheRise

USOilProduction(20002015)

slide-9
SLIDE 9
  • Proppant/FracSandMarket

RigCountontheRise

NorthAmericanRigCounts(JanNov2016)

slide-10
SLIDE 10
  • Proppant/FracSandMarket

FracSandIntensityontheRise

  • IndustryAverageProppantperFracJob
  • Averagesanduseperwellhasincreasedby128%Q12016overQ22012
  • Refrackingofwells
  • Uncompletedwellsinventory
slide-11
SLIDE 11
  • Proppant/FracSandMarket

ProppantDemandontheRise

  • QuarterlyNorthAmericanProppantDemand
slide-12
SLIDE 12
  • FracSandPriceIndex

FracSandPricingontheRise

slide-13
SLIDE 13
  • Manitoba,Saskatchewan,Alberta,B.C.,NorthDakota

NorthAmericanShaleBasins

InitialSupplyOpportunities

slide-14
SLIDE 14
  • VictorySilicaBusinessPlan

Phased Approach– ClearPathforGrowth

Phase1:MarketEntry

SevenPersons(dry)Plant:

processinginfrastructurein Alberta(500ktpa)

Shipcontracted(wet)sand

fromWisconsin

Washplantcapability Strategicstoragecapacity

Phase3:Growth

Winnipeg(dry)plant:

processinginfrastructurein Manitoba(1,040ktpa)

Siteidentifiedwithfavourable

logistics(CN,CP,BNSF)

Initiallysuppliedfrom

Wisconsin

MinagoSand

Longertermupside Currentlylookingatsmaller

pitconfigurationtotargetfrac sandonly

Phase2:VerticalIntegration

WisconsinmineJVincludingwashplant

  • wnership/frac sandpropertyoption

Securityofsandsupply/qualitycontrol Marginenhancement

slide-15
SLIDE 15
  • Processingpurchasedimportwetsand

(concentrate)fromWisconsin

  • SevenPersonsPlant
  • Fullyfunctioningsandplanton22.4acres
  • 22,000tonsproductstoragecapacity
  • $6.0Mcapextotakedryplantcapacityto

500,000tpa(complete)

  • 120,000tpa washplantcapability

Phase1:MarketEntry

SevenPersonsPlant– MedicineHat,Alberta

slide-16
SLIDE 16
  • DrySandProgram

Shipdry,finishedWisconsinnorthernwhitefracsandbyrailtoFort Saskatchewantransload EnhancedpricingandmarginduetocloserproximitytocustomersinGrande Prairieandotherplayswherefracsandiscurrentlyindemand 7PersonsPlantavailableasbackupintheeventofrail/othersupplydisruptions

  • DomesticSandProgram

SupplyingdomesticandimportedsandwasalwaysapartofinitialPhase1plan; highdemandforWisconsinsandin2014putdomesticsandsalesonhold Today’smarketrealitiesmakesdomesticsandmoreattractiveforcostsavings 7PersonsPlanthas120,000tpa wetsandprocessingfacilityalreadyonsite; ~$150,000capextogetwetplantupandrunning,whennecessary

VictorySilica

OngoingSupplementalPrograms

slide-17
SLIDE 17
  • Phase2:VerticalIntegration

WisconsinProperty/WashPlant

  • Securesandsupply,enhancemargins
  • Enteredintooptionagreementtoacquire

Wisconsinfrac sandproperty

  • ApprovalfromBoardorDirectorstoproceed

withPhase2,includingconstructionofa 1,000,000tpy fracsandwashplantinWI

  • Oilpricecrashputthisonhold
  • Providessignificantflexibilitytoadaptto

marketconditions

slide-18
SLIDE 18
  • Phase3:Growth

WinnipegProcessingSite

  • BuildprocessingfacilityinWinnipeg

Leaseexistingrailsupportedindustrial

site

Constructnewdryplant– 18mos.

fromstart

SupplyfromWisconsinandarea

(Minago longertermsupplyoption)

TargetWesternCanada(CN)andUS

Bakken (CP,BNSF)markets

slide-19
SLIDE 19
  • Minago Project

Nickel/FracSandCoProduction

OneofCanada’slargest undevelopedsulphidenickelresources Positivefeasibility study completed;permitted forproduction

Frac sand asignificantvaluedriver:US$2.90/lbNiincoproductvalue

basedonfeasibilitystudy

Superb location:Manitoba;road,rail,poweraccess

11.2milliontonnefrac sandresource,2 billion tonne potential

Potentialforsmaller,lesscapitalintensivepitconfigurationtotargetfrac sandonly

Valuable“CALL OPTION ” onnickelat$10.00/lb+

slide-20
SLIDE 20
  • MinagoProject

CoProduct:FracSand

FeasibilityStudyHighlights

  • 11.2milliontonnesmarketablefrac

sandinpitfootprintalone

  • Minedoverfirstthreeyears
  • Salesover10years
  • Coproductvalueperpoundofnickel

=$4.04(US$3.68);optimized:$3.18 (US$2.90)

  • Fulldetailsinfeasibilitystudy

availableonSEDAR

  • FracSand

Nickel

slide-21
SLIDE 21
  • MinagoProject

FracSandPotential

Existingresourcewithincurrentpitshell: 15Mt Existing&proposedquarryleases: 75Mtpotential* Proposedquarryexplorationpermits: 475Mtpotential* Entirelandpackage(mineralleases+ miningclaims): 2Bt potential*

slide-22
SLIDE 22

The“Call Option”

slide-23
SLIDE 23
  • CompanyProfile

NickelProjects

FourAdvancedSulphide NickelProjects

Over1billionpoundsofnickelinMeasuredandIndicatedresources and300millionpoundsofInferredresources,NI43101compliant

LynnLakeoptionedtoCorazonMining

slide-24
SLIDE 24
  • MinagoProject

TheProperty

  • Welllocated
  • Sulphidenickeldeposit
  • Exceptionalmetallurgy
  • Openpitandundergroundmining

potential

  • Bankablefeasibilitystudyonopen

pitonly

  • Exceptionalexplorationupside
slide-25
SLIDE 25
  • MinagoProject

ReservesandProductionUpside

  • NoseDepositopenpit:

8.6yearminelife Feasibilitystudydoesnotinclude:

  • NoseDepositU/G(inferred

resource)

  • NorthLimb:Explorationtarget
  • Mineralizationopentowest,

northandatdepth

  • Combinedresourcesprojected

minelifeof>20years

slide-26
SLIDE 26
  • MinagoProject

NickelConcentrateAssay

slide-27
SLIDE 27
  • MinagoProject

FeasibilityStudyOptimization

  • MinagoSulphideNickelProject:EconomicSummaryComparison

BaseCase Dec.14,20091

($millionexcept%&yrs)

BaseCase July19,20111,2

($millionexcept%&yrs)

AtToday’sMetalPrices

Undiscountedcashflow 917.7 1,418.4 951.3 NPV@8% 293.8 513.0 278.0 NPV@6% 402.6 669.3 392.6 IRR 17.7% 22.4% 16.5% PreProductionCapital 593.0 585.1 558.0

  • 1. ThreeyeartrailingaverageUS$metalpricesandexchangerateasofmarketcloseDecember10,2009:Ni:

$11.19/lb;Cu:$2.91/lb;Pd:$322.4/oz;Pt:$1,353.98/oz;Au:$836.25/oz;Co:$27.73/lb;Ag:$14.25/oz;$Can/$US exchangerate:1.097

  • 2. Updatedresource
slide-28
SLIDE 28
  • MinagoProject

CostSummary

  • C1 CashCostPerlb Ni

Feasibility Study After Optimization NetofCredits* US$1.94(C$2.12) US$2.20 (C$2.41) MetalByProduct Credits US$0.72(C$0.79) US$0.77(C$0.85) FracSandByProduct Value US$3.68(C$4.04) US$2.90 (C$3.18) CashCostperlbNickel BeforeCredits US$6.34(C$6.95) US$5.87(C$6.44)

*NetC1costsincreasewhenmetalproductionincreaseswithoutcorrespondingfrac sandincrease(samesizepit)

slide-29
SLIDE 29
  • MelProject

Overview

100%owned 25kmnorthofThompson Nearsurface,ramp/pitaccessible

resource

Directshippotential MillingagreementwithValeatcash

cost+5%*

Ongoingeconomicevaluation Metallurgicaltesting

Classification Tonnes (millions) Grade (%Ni) InSituNickel (millionslb)

Mel** Indicated 4.3 0.875 83 Inferred 1.0 0.839 19

slide-30
SLIDE 30
  • LacRocher Project

Overview

Nearsurfacedeposit,highgrade component,directshippotential PEAindicatesbreakeven~C$10 Ni/lbandC$3.84/lbCu

EISsubmitted,accessroad

complete

Onsiteupgrading:DMS,optical

sortingbeingevaluated

Classification Tonnes (millions) Grade (%Ni) InSituNickel (millionslb) LacRocher** Measured 0.29 1.23 8 Indicated 0.51 1.05 12 TotalM&I 0.80 1.12 20 Inferred 0.44 0.65 6

**At0.5%nickelcutoff

slide-31
SLIDE 31
  • VictoryNickel

BoardandManagement

CynthiaThomas/Chair

MBA,20+yearsinternationalminingandprojectfinance,formerDirectorMiningInvestmentBanking– ScotiaMcLeod

RenéR.Galipeau/CEO&Director

30+yearsminingexperiencewithHudsonBay,BreakwaterResources,LacMinerals,RioAlgom

PeterR.Jones

Engineer,formerCEOofHudbayMinerals,40+yearsminingexperiencewithHudbay,Cominco,CapeBretonDevelopment,Granduc OperatingCo.andAdanacMolybdenum

MichaelAnderson

Lawyer,nineyearsasGeneralCounselandSecretarywithDenisonMines,previouslyapartnerwithGowlingLafleurHendersonLLP,in housecounselwithJohnLabatt,GeneralCounselforSwiftCanadian

RolandHorst

35yearsminingexperienceasaCEO,banker,investmentbankerandgeologist

  • PaulL.Jones/GeologicalConsultant

GeologistandQPwith25+yearsexperiencewithmorethan20juniors

SeanStokes/VPCorporateAffairs&CorporateSecretary–VictoryNickelInc.

20+yearsfinance,businessdevelopment,communicationsexperience,incl.TiberonMinerals,LibertyMinerals,ScandinavianMinerals, NuinscoResources

slide-32
SLIDE 32
  • Disclaimer