woodhaven cross bay boulevards
play

Woodhaven / Cross Bay Boulevards Public Workshop # 2 June 25, - PowerPoint PPT Presentation

Woodhaven / Cross Bay Boulevards Public Workshop # 2 June 25, 2014 April 23, 2014 | JHS 210 Elizabeth Blackwell| 6:00 - 8:30 PM Agenda Presentation Breakout Session Part 1: SBS Design Puzzle Breakout Session Part 2: SBS Stop Selection


  1. Woodhaven / Cross Bay Boulevards Public Workshop # 2 June 25, 2014 April 23, 2014 | JHS 210 Elizabeth Blackwell| 6:00 - 8:30 PM

  2. Agenda Presentation Breakout Session Part 1: SBS Design Puzzle Breakout Session Part 2: SBS Stop Selection Full Group Discussion and Recap

  3. First Public Workshop – April 23 Introduction to Bus Rapid Transit and Select Bus Service Major comments: • Buses very slow and unreliable in rush hours • Pedestrian crossings difficult and dangerous • Service in Rockaways should be extended • Rockaway Branch is important to consider

  4. 2014 Implementation Bus lanes improve bus speeds by about 10%. Plans include: Offset Bus Lanes between Eliot and Metropolitan Avenues Curbside Bus Lanes approaching Rockaway Boulevard

  5. 2014 Implementation

  6. 2014 Implementation IMPLEMENTATION SCHEDULED FOR 2014

  7. Long Term: Select Bus Service Many corridor issues need to be addressed in a capital project SBS project will look at all potential changes, focusing on: • Faster bus service SBS Corridor • Safer streets for pedestrians and drivers • Maintaining appropriate traffic flow for local and through drivers

  8. SBS and Traffic Flow Most of Woodhaven & Cross Bay have 4-5 lanes/direction. The highest volume is at Union Tpke, where just 3 lanes go over the bridge. Proposed Continue to provide sufficient lanes for general traffic Reconfigure roadway to better use “extra” space without creating merges (bus lanes, medians, narrowed crossing distances) Redesign complex intersections such as Park Lane South Use service roads in appropriate ways Study local, limited, and express bus services

  9. Next Steps Today : Design and SBS station ideas Summer 2014 : MTA Bus and DOT develop designs based on today’s input Fall 2014 : Meetings to present draft plans and get community input Late 2014 : Selection of Preferred Design 2015 : Develop details for Preferred Design, plan capital project

  10. Next: Breakout Sessions April 23, 2014 | JHS 210 Elizabeth Blackwell| 6:00 - 8:30 PM

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend