Welcome CAU-Express 2014 CAUx Keynote - Tools Richard Ay , ICAS Challenges Tighter project deadlines Profitable Job-to-job Squeezed process resources reinvention Successful Increased quality and accuracy requirements True Costs of
CAUx Keynote - Tools
Richard Ay, ICAS
Challenges Tighter project deadlines Squeezed resources Job-to-job process reinvention Increased quality and accuracy requirements
Profitable Successful
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
True Costs of Design/Engineering Mistakes
www.freedigitalphotos.netOperations Construction Design engineering Process engineering Focus on accurate engineering
Optimizing Project Information Flow
Operations Construction Design engineering Process engineering
Flow sheets P&IDs Line list Equipment list Valve list Data sheets Isometrics Layouts GAs Stress Eng. Vessel Eng.
- Mech. Eng.
Isometrics GAs Welding docs QA docs Erection docs Test docs As-built P&IDs As-built Isometrics As-built GAs Commissioning
BOMs BOMs Data sheets
Equipment valve lists
P&ID vs Plant Audit
Line lists
Seamless Workflows
External project databases
Intelligent P&IDs and collaboration Intelligent 3D design and collaboration Pipe stress analysis Pressure vessel analysis Construction drawings
P&ID E&I Plant Professional fieldPipe Design Review CAESAR II PV Elite ISOGEN OrthoGen PV Fabricator
External project databases P&ID E&I PV Elite ISOGEN OrthoGen PV Fabricator
Value of Integration
Plant Professional fieldPipe Design Review CAESAR II
2014 Drivers of Success Award Winners
DoS Winner for CADWorx: Richard Design Services
DoS Winner for CADWorx: Richard Design Services USD
$360
million
200,000ft
450
equipment pieces
pipes CADWorx Plant Professional CAESAR II
6,500
piping isometrics
12 month
within schedule
100,000
man-hours Isometric drawings completed concurrently with engineering
Project engineering was completed in 200,000 hours. Without CADWorx, an additional 100,000 hours would have been needed.
Front-end dev. Detail design Design mgmt.
Instrumentation
Michael Tran, Design Coordinator
DoS Winner for CAESAR II: L & T Chiyoda (LTC)
DoS Winner for CAESAR II: L & T Chiyoda (LTC) USD
$25
million
Flange leakage
2 month
within plant shutdown
API check NEMA check WRC calculation
Fourth-chamber separator
Reactor regenerator
Standpipes
Third-stage separator
Fines disposable hopper Design
Engineering Procurement
Construction CommissioningRR analysis covering multiple skin temperatures Stiffening model with user-defined cold modulus of elasticity
$1 million
Material costs
CAESAR II
Critical systems analyzed using CAESAR II were later verified to almost exactly match the behavior in the field.
Pradeep Darji, Manager
DoS Winner for PV Elite: Engineers India Limited
Tail gas Sulphur
DoS Winner for PV Elite: Engineers India Limited
Constant heating supplied
Unique equipment designed to support 62.4MT hydrotest weight Included leg and base plate design, and steam coil
PV Elite
Numerous design and
process engineering
edits
tight
within schedule
15%
Material costs
The results reaffirmed the confidence EIL has shown towards PV Elite for over a decade.
SourabhAgarwal, Sr. Engineer
Delivering Value
Integration Partnerships
Support Innovation
World Leading Capabilities 3rd party solution 3rd party partners
i i i i
CADWorx
CADWorx Delivering Innovation Globally
Semiconductor Water treatment Mining
CADWorx fieldPipe
CADWorx fieldPipe Delivering Value Leica
Laser scanner Dismantle and replace reactor, and effected pipework New steam and condensate pipe spools generated Phosgene reactor to tie-in with existing piping
i
Critical reactor fabrication errors resolved Piping adjusted to accommodate new nozzle locations Smooth turnaround – no piping or mechanical interferences
CADWorx fieldPipe in Action
Full Range of Supported Input Devices
Data acquisition scope
(no. of pipelines)
Degree of automation
DPI-7 MS50 P20
Right tool
The
Right job
for the
TS15
OrthoGen for CADWorx from 3DS OrthoGen for CADWorx from 3DS
OrthoGen Automated tags Automated dimensions Automated BOMs
Bill of Materials
CAESAR II
Productivity T echnical capabilities
CAESAR II Update
Static and dynamic analysis Interoperability Piping code and material database updates Flange enhancements Documentation/help Modeling and usability
CAESAR II
“Man is a tool-using
- animal. Without tools, he
is nothing. With tools, he is all.”
Thomas Carlyle
With The Right Tools…
30%
CAESAR II users trained
HxGN Live 2014 Conference CAESAR II Fundamentals
- nline training
CAU Express Conferences worldwide
PV Elite
PV Elite Update Largest code database NozzlePro CodeCalc
i
PV Elite
TANK
TANK Update
API-650 12th Ed. API-653 4th Ed. API-2000 6th Ed.
TANK
CADWorx E&I
Maximize productivity Minimize errors CADWorx E&I Owner EPC
Cabinet layout PLC diagram Instrument list Connection Bus diagram Functional diagram T erminal diagram Equipment data Single line Data sheet Specification General layout
CADWorx E&I
GT STRUDL
Intergraph Acquires GT STRUDL
GT STRUDL
NRC quality regulations
Chemical
Consumer goods
Marine
Mining
Nuclear Oil & gas
Pharmaceutical
Solar
Cleanrooms
Wind
Metals
GT STRUDL Development Roadmap
Identify Define Analyze Prioritize & select Design Verify
Release How will system work? How will it happen? Most valuable?
Bringing it all Together
Integration of CADWorx Plant Design Suite with SmartPlant Enterprise
SPI SPEL B SPRD SPMAT S3D SPR SP Constrc. P&ID Plant E&I
A Promise to You Never forget Rule No.1
Show fairness & honesty Broaden integration Optimize productivity
Ready for the Future? Production ready software Support & Training Product integration Global user community
i
“Man is a tool-using animal. Without tools, he is nothing. With tools, he is all.”
Thomas Carlyle
One More Thing…
Intergraph iPad App
Available to download today