FRANCE
Country presentation - 2018
IEA-PVPS Task 1, Caux meeting 2019
Daniel Mugnier
FRANCE Country presentation - 2018 IEA-PVPS Task 1, Caux meeting - - PowerPoint PPT Presentation
FRANCE Country presentation - 2018 IEA-PVPS Task 1, Caux meeting 2019 Daniel Mugnier General framework and support policies www.ademe.fr Country presentation France Daniel Mugnier IEA-PVPS -T1 Caux meeting 2019 2 Date General
IEA-PVPS Task 1, Caux meeting 2019
Daniel Mugnier
2
Date
www.ademe.fr
Country presentation – France Daniel Mugnier IEA-PVPS
3
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
COP21 Paris Agreements 2015 : Energy Transition Act for Green Growth
Target = 32%of RE in 2030 Policies should support self-consumption
2018 : Energy Programme Decree (PPE)
18,2 – 20,2 GW in 2023 (2016) to now 20,6 GW PV in 2023
35,6 - 44,5 GW PV in 2028 Targets ambitious, current combined commissioned and proj ect (grid connection queue) volume of approximately 13 GW
4
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
Increasing the maximum size limit for systems in the self-consumption call for tenders to 1 MW, up from 500 kW Encouraging investments in innovative agrivoltaic or floating photovoltaics systems, as well as more citizen orientated measures such as affirming support for both local government and citizen investment in photovoltaics Enlarging the geographical perimeter for virtual collective self- consumption proj ects to better include urban development zones and eco- villages, and a dedicated call for tenders for these systems.
5
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
New FiT scheme published in mai 2017 !
No self-consumption : FiT garanteed for 20 years Partial self-consumption : Bonus % Wp + FiT 20 garanteed for 20 years for surplus Special FiT for each French overseas department BIPV incentives stopped in Oct 2018 : FiT now equal for BIPV and BAPV
End of more than a decade of targeted support mechanisms for building integration PV
(BIPV)
Feed-in tariffs mostly stable, with a 0 to less than 1%
variation across all segments
Tariff revision mechanism based on the volume of grid connection requests and general
inflation – a low variation indicates low grid connection request volumes.
BIV
6
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
T a (no self-consumption) T ariff Q4 2018 Power of PV installation (kW) Pa (partial self-consumption) T ariff Q4 2018 0,1859 EUR/kWh ≤3 kW 0,10 EUR/kWh (+0,39 EUR/W installed) 0,158 EUR/kWh 3 kW to 9 kW 0,10 EUR/kWh (+0,29 EUR/W installed) 0,1207 EUR/kWh 9 kW to 36 kW 0,06 EUR/kWh (+0,19 EUR/W installed) 0,1119 EUR/kWh 36 kW to 100 kW 0,06 EUR/kWh (+0,09 EUR/W installed) Average selling price (EUR/AverakWh) 0,0827 (4th Call) Call for T enders 100 kW to 500 kW Average selling price (EUR/AverakWh) 0,0827 (4th Call)
7
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
System type and size Building mounted systems and parking canopies Building mounted systems Ground-based systems and parking canopies Building mounted systems for self- consumption Innovative solar systems Wind and/or ground-based photovoltaic systems Individual system size limits 100 kW to 500 kW 500 kW to 8 MW Ground: 500 kW to 30 MW Canopies: 500 kW to 10 MW 100 kW to 1 MW 100 kW to 3 MW 5 MW to 18 MW Support Mechanism Call for Tenders 2017– 2019 Call for Tenders 2017– 2019 Call for Tenders 2017– 2019 Call for Tenders** 2017– 2020 Call for Tenders 2017– 2019 Call for Tenders 2018 Volume 825 MW in 9 calls of 75 MW to 100 MW) 1050 MW in 9 calls
to 150 MW 3,92 GW in 6 calls of 500 MW to 850 MW 450 MW in 9 calls of 50 MW 210 MW in 3 calls of 70 MW 200 MW in 1 call Remuneration type PP A*** FIP**** FIP Self-consumption + bonus on self- consumption + FIP PP A (5 MW) FIP (65 MW) FIP Average tendered price (or bonus for self-consumption) 4th call: 82,7 EUR/MWh 4th call: 72,24 EUR/MWh 4th call: 58,2 EUR/MWh 4th call: 29,8 EUR/MWh 1st call: 80,7 EUR/MWh 54,94 EUR/MWh
* ZNI: non-interconnected territories (Corsica and French overseas departments) * * Call for Tender is not limited to photovoltaics systems; other REStechnologies are eligible * * * PPA = Power Purchase Agreement at tendered rate * * * * FIP = Market sales + Additional Remuneration (Feed in premium) Contract at tendered rate
9
Date
www.ademe.fr
Country presentation – France Daniel Mugnier IEA-PVPS
10
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
Evolution of annual flux for connected installations (MW) Evolution in 2018 per trimester(MW)
11
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
Evolution of the trimester growth rate for connected installations (MW)
12
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
8029 MW
13
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
3970 MW
14
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
S hare of PV electricity on the total consumption Evolution per trimester
17
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
18
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
19
Date
www.ademe.fr
Country presentation – France Daniel Mugnier IEA-PVPS
21
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
Increased concentration of the photovoltaic energy production market with over 29%
French Two major players acquired – one by Engie, one by Total, consolidating Engie’s position as the maj or PV generator – but also developer - in France, with nearly twice the installed capacity as the next company, EDF EN Two maj or financial funds, the state’s Caisse des Dépôts and Mirova, the “ responsible investment” branch of national corporate banking and investment firm Natixis, have entered the top 25 through minority participation in a large number of projects
*
22
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
Industry action (the inauguration of France’s first photovoltaics recycling plant in southern France, operating on behalf of PV Cycle) Contributions to the European Preparatory Study on a PV EcoDesign and Eco-Label Exchanges on photovoltaics carbon footprint calculations for the national E+C- building label Continuation of environmental criteria in Tenders and a dedicated discussion group at the ADEME collaborative workshop for the revision of its Strategic Roadmap for Photovoltaics
24
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
First perimeter defined in mai-2017
Downstream a single low-tension/ high tension transformer Consumers and producers have to gather within a single legal entity Consumers and producers have to define a dispatching key
Difficulties to deploy the first proj ects
Very expensive : need of 70-80% public funding
PE (22,5 €/ MWh) and TCFE non-exempted for self-consumed electricity
Specific issues to handle:
25
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
Survey : 63%of french are interested in self-consumption, even if it cost a bit more Half new residential PV installed in 2017 is individual self-consumption Cities are veryyy interested in collective self-consumption ~ 100 proj ects in the DSO pipe (asked connection to grid) ~10 advanced proj ets
Prémian (Investissements d’Avenir DIGISOL)
« Les Souffleurs » (social building Gironde Habitat) SEM Morbihan Energies SmartMagne, Marmagne
26
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
28 kWp 1 producer, 7 consumers 52000 € investment 1158 € annual electricity savings 19,5 % solar fraction
92,7 % 7,3 % Autoconsommation Excédent
Building owner & producter : Commune de Prémian « Personne Moral Organisatrice » : Prémian Energie Positive Engineering company : TECSOL
Installation connected Dynamic repartition Sunchain with Blockchain technology
Crédit : Cegelec
Selfconsumption Excess
27
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
27
Proj ect owner
Commune de Prémian
Proj ect status Operationnal Subsidies (% ) 80 Solar kWh supply price (c€/ kWh)*
2,2
(26% ) CSPE & TCFE (c€/ kWh)
3,2
(38% ) CSV TURPE 5 bis (c€/kWh) **
3,1
(36% ) Solar kWh price (c€/kWh)
8,5
(100% ) Grid kWh price (c€/ kWh) in 2018 (variable part) 11,1
* Membership fee to the PMO covering OPEX of solar system ** Variable grid access part (Composante de S
= + + +
28
Country presentation – France Daniel Mugnier IEA-PVPS
Date
www.ademe.fr
40,6 19,6 12,8 10 20 30 40 50
Payback (years)
Brutto Payback with or without TURPE exemption S ans subventions Avec subventions
TURPE exemption Actual situation TURPE & CSPE exemption
8,1 3,9 2,6 Without subsidies With subsidies
30
Date
www.ademe.fr
Country presentation – France Daniel Mugnier IEA-PVPS
daniel.mugnier@ tecsol.fr
www.ademe.fr
celine.mehl@ ademe.fr paul.kaaij k@ ademe.fr
www.tecsol.fr