WELCOME Berry bridge & Northern Interchange Work since last - PowerPoint PPT Presentation

Foxground and Berry bypass WELCOME Berry bridge & Northern Interchange Work since last time RMS to review possibilities for graphically representing the view from the northern off ramp across to the new highway at the next meeting.


  1. Foxground and Berry bypass WELCOME Berry bridge & Northern Interchange

  2. Work since last time… RMS to review possibilities for graphically representing the view from the northern off ramp across to the new highway at the next meeting. � RMS to provide a detailed plan of the proposed access road for residents living next to the highway north of Berry. � RMS to advise group as to how many poplar trees at Woodhill Mountain Road will need to be removed to accommodate the upgrade. �

  3. Work since last time… RMS to provide the working group with visuals to demonstrate the trade off between minimising the height of the bridge deck, the width of the bridge headstock and the number and size of the piers. � RMS to provide working group with an artist pallet of colours for the bridge and colours/materials/design options for safety rail. � RMS to provide, at the next group meeting, examples of alternative bridge designs. � RMS to provide visuals of abutments for the working group to review. �

  4. Work since last time.. RMS to investigate the validity of the heritage listing of the poplar tress on Woodhill Mountain Road. � Woodhill Mountain Road off ramp - RMS to take this issue off line for resolution with Shoalhaven Council and the Berry Alliance. Outcome to be reported back to the group. � RMS to provide traffic figures to the working group. Figures to highlight any increased traffic impacts on local roads. �

  5. Work since last time… RMS to provide working group with a visual representative of the current concept design (super tee bridge, with a total of three bridge joints and pillars located at 35 metre intervals). � RMS to advise the group as to how it will relocate the existing power lines at Woodhill Mountain Road. � RMS to provide working group with a visual representation of the current concept design (super tee bridge, with a total of three bridge joints and pillars located at 35 metre intervals). �

  6. CM+ Bridge Design Investigations

  7. Thank you Berry project office Broughton Court, shop 3/113 Queen Street, Berry. Email us on foxgroundandberrybypass@rta.nsw.gov.au Visit the project website www.rta.nsw.gov.au/fbb Call project information line 1800 605 976 LCE

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.