AN EXCITING EVOLUTION!

EASTMAIN RESOURCES INC. INVESTOR PRESENTATION I SEPTEMBER 2016

EASTMAIN INVESTOR PRESENTATION 1

slide-2
SLIDE 2

FORWARD LOOKING STATEMENTS

EASTMAIN INVESTOR PRESENTATION 2

Certain information set forth in this presentation may contain forward-looking statements that involve substantial known and unknown risks and uncertainties. Forward-looking statements consist of statements that are not purely historical, including statements regarding beliefs, plans, expectations or timing of future plans, and include, but not limited to, statements with respect to any potential director nominations, actions taken in respect

  • f director nominations received by Eastmain, actual results of current and future exploration activities at the

Company's properties, and the potential success of the Company’s future exploration and development

  • strategies. These forward-looking statements are subject to numerous risks and uncertainties, certain of which

are beyond the control of Eastmain, including, but not limited to he results of matters to be considered at the upcoming annual and special meeting of shareholders of Eastmain, the impact of general economic conditions, industry conditions, dependence upon regulatory approvals, the availability of financing, timely completion of proposed studies and technical reports, and risks associated with the exploration, development and mining industry generally such as economic factors as they affect exploration, future commodity prices, changes in interest rates, safety and security, political, social or economic developments, environmental risks, insurance risks, capital expenditures, operating or technical difficulties in connection with development activities, personnel relations, the speculative nature of gold exploration and development, including the risks of diminishing quantities of grades of Mineral Resources, contests over property title, and changes in project parameters as plans continue to be refined. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. The Company assumes no obligation to update such information, except as may be required by law.

slide-3
SLIDE 3

THE NEW EASTMAIN

ADVANCING ASSETS TO DEVELOPMENT

EASTMAIN INVESTOR PRESENTATION 3

THE TRIANGLE OF SUCCESS

KEY PROJECTS

CLEARWATER PROJECT

The Anchor Project’s High-Grade Resource with Open-pit and Underground potential

EASTMAIN MINE PROJECT

A Past-Producer with Historic Resources and Growth Potential

ÉLÉONORE SOUTH JV

Indicative Geochemical Signature

8 OTHER SIGNIFICANT LAND PACKAGES

Interesting prospective potential Total of 137,665 total hectares

TOP LAND POSITION IN THE JAMES BAY GOLD DISTRICT

Top mining jurisdiction Access to roads and power

slide-4
SLIDE 4

EASTMAIN September 7, 2016

Shares outstanding 175,104,814 Options (W Avg Life - 6.83 yrs, $0.69) 10,303,605 Warrants (Expire 11/10/18 , $0.50) 6,899,999 Fully-Diluted 192,308,418 Market Capitalization (20-day VWAP) $137 million Share Price (20-day VWAP) $0.78 52 Week High/Low $0.90 - $0.29 Daily Average Volume (30 day avg) 1,171,079

CASH POSITION

$19.0 M

H2 2016 BUDGET FORECAST:

$12.6 M

EASTMAIN INVESTOR PRESENTATION 4

CAPITAL STRUCTURE SEPTEMBER 1, 2016

TX:ER

slide-5
SLIDE 5

Beacon Securities - Mike Bandrowski Cormark Securities - Tyron Breytenbach Mackie Research Capital - Barry Allan/Ryan Hanley Macquarie Capital - Michael Gray Paradigm Capital - Don Blyth

EASTMAIN INVESTOR PRESENTATION 5

TOP SHAREHOLDERS Polygon 17.1 million 9.7% Integra Gold 15.9 million 9.1% Integra Warrants 6.4 million Goldcorp 10.5 million 6.0% Gabelli & Company 3.5 million 2.0% Van Eck 2.8 million 1.6% Don Robinson 2.7 million 1.6% Caisse du Depot (SODOMEX) 2.6 million 1.5% US Global 2.5 million 1.4% Galileo 1.8 million 1.0% Sentry 1.3 million 0.7% Konwave AG (Gold 2000) 1.1 million 0.6% BMO Asset Management 0.7 million 0.4%

ANALYST COVERAGE

CAPITAL STRUCTURE

TX:ER

Insiders 3% Retail 54% Institutional & Major Shareholders 28% Integra 9% Goldcorp 6%

OWNERSHIP

TOP INSIDERS Blair Schultz 0.8 million 0.5% Claude Lemasson 0.8 million 0.5% Joe Fazzini 0.3 million 0.1% Mike Hoffman 0.2 million 0.1% Timo Jauristo 0.2 million 0.1% Laurie Curtis 0.1 million 0.1%

slide-6
SLIDE 6

EVOLUTION OF THE BOARD AND MANAGEMENT

EASTMAIN INVESTOR PRESENTATION 6

Claude Lemasson President & CEO (Apr. 2016) and Director (Nov.2015) Laurence (Laurie) Curtis Chairman (Sept. 2015) Michael Hoffman Mine Engineer & Executive (Mar. 2016) Blair Schultz Capital markets experience (Apr. 2016) WORLD-CLASS BOARD OF DIRECTORS Timo Jauristo Geologist, ex-Goldcorp Corp Dev Exec (Apr. 2016) Stephen De Jong Integra President & CEO (Apr. 2016) George Salamis Integra Chairman (Apr. 2016) INTEGRA TECHNICAL ADVISORS Familiarity with Management and the Éléonore Project (Goldcorp) and the James Bay region Hervé Thiboutot, Geological Engineer Integra Senior VP Jacques Simoneau, P.Geo. Integra Exploration Manager Claude Lemasson, P.Eng, MBA President & CEO

  • Highly-skilled mining professional
  • 30 yrs of mine dev’t & operational experience
  • Direct experience with Goldcorp’s Éléonore

project in northern Québec Joe Fazzini, CPA, CFA, CA CFO & VP Corporate Development

  • 10+ yrs advising and auditing global gold and

base metal producers through PwC & Dundee Capital Markets. Alison Dwoskin, CPIR Manager, Investor Relations

  • 10+ yrs in mining Investor Relations

STRENGTHENED MANAGEMENT TEAM Bill McGuinty, P.Geo VP Exploration

  • 30 yrs experience in Canada and Latin

America, from exploration to environmental and feasibility studies. Manuel Ng-Lai, P.Eng Project Engineer

  • 10+ yrs resource modelling and project

engineering in the technical services department Carl Corriveau, P.Eng, SEG Exploration Manager

  • 20+ yrs industry experience, including

project management and evaluation, advancing projects from exploration through economic studies

slide-7
SLIDE 7

JAMES BAY GOLD CAMP

EMERGING GOLD DISTRICT

EASTMAIN INVESTOR PRESENTATION 7

Production

The Canadian Shield has produced over 200 million

  • unces of gold

Life Cycle

James Bay is one of the youngest camps in the Canadian shield

Exploration

Potential for many more discoveries as exploration advances

Development

Rapidly improved infrastructure to speed up pace of exploration

  • 1. The production and reserve figure for James Bay Central Camp includes Eastmain’s resources as there are currently no reserves. 2. The Eastmain mine extracted 40,000 ounces in 1995. 3. Casa Berardi and

Chibougamau are located in Southern James Bay Source: Company reports, government studies, and academic journals.

Central James Bay Rice Lake Casa Berardi Detour Hemlo Chibougamau Red Lake Rouyn-Noranda Val D’or Kirkland Lake Timmins 7 2 3 23 21 7 28 20 30 45 74

Production & Reserves (Millions of Ounces) First Gold Pour (Year)

2014 2005 1988 1983 1981 1952 1930 1927 1923 1915 1909

District

slide-8
SLIDE 8

SUPERIOR INFRASTRUCTURE IN A TOP JURISDICTION

137,665 HECTARES IN NEWEST GOLD DISTRICT

EASTMAIN INVESTOR PRESENTATION 8

Note: Clearwater is accessible via a commercial airport at Nemaska, located 80 kms south

  • f the project. Route 167 Nord has been constructed from Temiscamie north to the Renard

Project, providing permanent road access to the Eastmain Mine project.

Ruby Hill Lac Lessard

Eastmain Mine

Route 167 Nord Newly Constructed

Clearwater & Lac Clarkie

Lac Hudson Reservoir Lidge Lac Elmer Road King Radisson

Éléonore South JV

JAMES BAY REGION

50KM

Eastmain

James Bay

Mistissini Temiscamie Éléonore Mine Goldcorp Renard Mine Stornoway Troilus Mine Copper One Wemindji Waskaganish Chisasibi Nemaska

slide-9
SLIDE 9

EASTMAIN INVESTOR PRESENTATION 9

CLEARWATER PROJECT

HIGHLIGHTS

EAU CLAIRE: Mineral Resource Estimate1 Total Measured & Indicated: 951,000 oz @ 4.09 g/t Au - 7,225,000 tonnes Total Inferred: 633,000 oz @ 3.88 g/t Au – 5,072,000 tonnes

Size and Location 51,614 hectares James Bay gold district greenstone belt, volcanics

Infrastructure Hydro-power (20 kms away), road and nearby airports 30 person camp incl. full-kitchen, core-shack and cabins

Note 1. Technical Report for the Eau Claire Deposit, Clearwater Project by SRK Consulting (June 2015) filed

  • n SEDAR.
470,000 mE 480,000 mE 5,780,000 mN 5,790,000 mN 5,800,000 mN 5,800,000 mN 5,790,000 mN 460,000 mE 5,780,000 mN 450,000 mE 5 km 2.5 EASTMAIN Project: Title: V3B Mafic Volcanic Rock S Volcanoclastic Sediment S4 Polymictic Conglomerate V1 Felsic Volcanic Rock S9 Iron Formation VQ, VTL, VQTL Quartz +/- Tourmaline Vein, QFP Quartz Feldspar Porphyry M8 Schist / Alteration Zone >50% I3B, I4B Diabase, Pyroxenite Hydrology (rivers and lakes) Claim Block Area Outline L E G E N D Geology I2 Diorite I1D Tonalite Other Symbols
slide-10
SLIDE 10

EASTMAIN INVESTOR PRESENTATION 10

EAU CLAIRE MINERAL RESOURCE

OPPORTUNITY TO IMPROVE QUALITATIVE AND QUANTITATIVE DATA

77%

More drilling data in next mineral resource update Q1 2017

13,000 metres - drilling from 2015 63,300 metres - planned in 2016

Note: 5,000 metres drilled in 2014 at the Clovis Lake target, Clearwater Project

EAU CLAIRE DEPOSIT OVERVIEW: LOOKING WEST 450 West Zone Outcrop on Hilltop OPEN PIT POTENTIAL

Eau Claire Mineral Resource Drilling

99,000 m drilled 2011-2013 0 m drilled 2014-2015 99,000 m drilled since 2011

slide-11
SLIDE 11

2016 DRILLING PROGRAM

PLAN VIEW

450 West Zone 850 West Zone

EASTMAIN INVESTOR PRESENTATION 11

EAU CLAIRE DEPOSIT

FOCUS ON QUALITY AND GROWTH

2016 EXPLORATION BUDGET

$7.7m

850 & 450 WEST ZONE DRILLING 2016 PROGRAM – 55,700M 951,000 gold ounces (M&I) From surface to 400 m deep 2015 MINERAL AND RESOURCE ESTIMATE:

ü Open pit infill and step-out (blue) 11,200 m ü Shallow underground infill (pink) 26,000 m ü Delineation and conversion drilling:Inf. - > Meas. & Indic. (green and orange) 18,500 m

2015 Definition drilling intersected multiple high-grade gold intervals laterally and down- plunge of the current Measured & Indicated resource. The deposit is open laterally to the east and down plunge to the southeast and

  • southwest. Based
  • n SRK June 11,

2015 mineral resource, “Technical Report for the Eau Claire Gold Deposit, Clearwater Project, Quebec”. LONGITUDINAL VIEW (Facing North)

CONCEPTUAL

slide-12
SLIDE 12

EASTMAIN INVESTOR PRESENTATION 12

CLEARWATER & LAC CLARKIE GEOLOGY

MULTIPLE TARGETS ON TWO MAJOR STRUCTURAL FEATURES

2016 EXPLORATION PROGRAM

ü Drill-ready open pit exploration targets (within 15 km) of the Eau Claire Deposit 7,600 m drilling ü Lac Clarkie Phase 1 & 2 initial exploration programs include mag surveys, mapping and prospecting to identify priority drilling targets

5,800,000 mN 5,790,000 mN 80,000 mN

5

km

2.5 V3B Mafic Volcanic Rock S Volcanoclastic Sediment S4 Polymictic Conglomerate V1 Felsic Volcanic Rock S9 Iron Formation VQ, VTL, VQTL Quartz +/- Tourmaline Vein, QFP Quartz Feldspar Porphyry M8 Schist / Alteration Zone >50% I3B, I4B Diabase, Pyroxenite Hydrology (rivers and lakes) Claim Block Area Outline Geology I2 Diorite I1D Tonalite Other Symbols

Clearwater Property Exploration Drilling (m) Snake Lake 4,700 Clovis Lake 1,300 Knight 500 Natel 500 Serendipity 300 Beluga 300 Total Clearwater Property Exploration 7,600

slide-13
SLIDE 13

EASTMAIN INVESTOR PRESENTATION 13

CLEARWATER PROJECT

LOOKING FORWARD

Upcoming Catalysts Drilling results (starting October 2016) Mineral resource update (Q1 2017) Preliminary Economic Assessment (mid-2017) 2016 Exploration Program 63,000 m ($7.7 million) drilling Open pit infill, shallow underground infill, conversion drilling, drill-ready open pit targets (w/in 15 km) Lac Clarkie LIDAR and mag surveys, prospecting, mapping and geochemical surveying for target definition Exploration Upside District-scale greenstone belt Identified targets in close proximity to Eau Claire deposit High-grade outcropping - potential for several small- medium open pits Potential for Eleonore-style and Eau Claire-style mineralization elsewhere on the property

Note 1. Technical Report for the Eau Claire Deposit, Clearwater Project by SRK Consulting (June 2015) filed on SEDAR.

slide-14
SLIDE 14

EASTMAIN INVESTOR PRESENTATION 14

EASTMAIN MINE PROJECT

THE RIGHT LOCATION

Otish Park Eastmain Mine Camp looking NW along mine trend to surface targets Route 167 Road, part of Plan Nord Eastmain Mine

All season road built in 2014 by Quebec gov’t and Stornoway.

slide-15
SLIDE 15

EASTMAIN INVESTOR PRESENTATION 15

EASTMAIN MINE PROJECT

HIGHLIGHTS

Note 1. The Eastmain Mine (past-producing) Historical Resources is not NI 43-101

  • compliant. A

Qualified Person has not done sufficient work to classify them as mineral resources. The issuer is not treating these historical resources as current mineral resources and these resources should not be relied on.

Historical Mining and Resource Estimate Mined: 40,000 ozs at 10.58 g/t Au (1995) Resource1: 255,750 oz of 10 g/t Au in 878,000 tonnes $40M invested by previous

  • wners on exploration &

development Size and Location 8,014 hectares James Bay gold district greenstone belt (volcanics) Infrastructure Past-producing property Permanent all-weather road,

  • nsite airstrip,

generator-power 30 person-camp incl. full-kitchen, core shack and cabins

slide-16
SLIDE 16

EASTMAIN INVESTOR PRESENTATION 16

EASTMAIN MINE PROJECT

EXPLORATION OPORTUNITY

>1 to 5 g/t Au Rock Assay Data >30 g/t Au >10 to 30 g/t Au >5 to 10 g/t Au

Eastmain Mine Property

Ruby Hill East A & B Gold Zones

2.5 kms Access Road Route 167 North

Mine Trend

C Zone Mine Camp

Priority Targets

Airstrip

N

35 5,800,000 mN 699,000 mE 698,000 mE 700,000 mE 700,000 mE 698,000 mE 699,000 mE 697,000 mE 697,000 mE 5,801,000 mN 696,000 mE 696,000 mE 5,798,000 mN 5,799,000 mN 5,800,000 mN 5,799,000 mN 5,798,000 mN

‐ ‐

LEGEND

> 0.1 g/t Au > 5.0 g/t Au > 1.0 g/t Au > 0.5 g/t Au

Michel Target

0.5 to 125.1 g/t Au 0.5 to 12.5 g/t Ag 0.1 to 1.08% Cu

Julien Target

0.5 to 27.2 g/t Au 0.5 to 28.8 g/t Ag 0.1 to 2.3% Cu

Susanna Target

0.5 to 38.7 g/t Au 0.5 to 26.6 g/t Ag 0.1 to 3.06% Cu

Hillhouse Target

0.5 to 39.5 g/t Au 0.5 to 25.8 g/t Ag 0.1 to 2.4% Cu

700,000 mE 696,000 mE 697,000 mE 698,000 mE 700,000 mE 696,000 mE 697,000 mE 698,000 mE 699,000 mE 5,801,000 mN 5,798,000 mN 5,799,000 mN 5,799,000 mN 5,798,000 mN 5,801,000 mN

Eastmain Gold Deposit

699,000 mE

500 m ROCK ASSAY DATA

Mine Trend

Zones A & B (partially mined)

Prospecting Targets

10 km mine trend with four priority targets, NW of A & B gold zones 2016 exploration program - $1.3 million budget

  • Prospecting
  • Mechanical trenching (3,700 m)
  • Drilling (3,500 m)
slide-17
SLIDE 17

EASTMAIN INVESTOR PRESENTATION 17

EASTMAIN MINE PROJECT

LOOKING FORWARD

2016 Exploration Program Prospecting, trenching and drilling on Eastmain Mine and Ruby Hill Exploration Upside Known Mineralization around the historic resource Four targets outlined in the mine trend Minimal past follow up drilling on interesting prospecting results Upcoming Catalysts Exploration program results (Q4 2016) Full assessment of Eastmain past production, historic resources and targets

slide-18
SLIDE 18

EASTMAIN INVESTOR PRESENTATION 18

ÉLÉONORE SOUTH JV PROPERTY GEOLOGY

INDICATIVE GEOCHEMISTRY – CONTIGUOUS TO ELEONORE MINE

HIGHLIGHTS Property size: 147 sq km JV Project between

  • Eastmain (36.7%)
  • Goldcorp (36.7%)
  • Azimut (26.6% - Manager for 2016)

JT Prospect Corridor extends from JT Prospect east to Cheechoo discovery, over Moni Prospect –High gold grade grab samples range from 11.6 g/t Au – 142 g/t Au New FD Prospect down trend from Eleonore gold

  • mine. 4.5km north of JT Prospect

Goldcorp’s Eleonore Mine:

  • Sedimentary-hosted gold deposit
  • >8 M MI&I ounces
  • 2016 gold production forecast: 250k -280k oz

($950/oz AISC)

2016 Drilling Program

$2 million - JV Budget $0.74 million (Eastmain portion)

Goldcorp’s Eleonore Property Eleonore South JV Property

FD Prospect Moni Prospect

slide-19
SLIDE 19 76°W 52°37'30"N 52°37'30"N 435,000 440,000 5,825,000 5,825,000 5,830,000 5,830,000 5,8 5,8 500 1,000 1,500 meters 1:50,000 UTM zone 18 projection - NAD83 ELEONORE SOUTH PROPERTY Soil geochemistry - Arsenic (As) Date: 2016-05-11 100% 99% 96% - 98% 91% - 95% 86% - 90% 81% - 85% 71% - 80% 61% - 70% 51% - 60% 1% - 50% 71.82 - 929.35 50.27 - 71.81 29.23 - 50.27 19.25 - 29.23 14.84 - 19.25 12.14 - 14.84 8.85 - 12.14 6.76 - 8.85 5.19 - 6.76 0 - 5.19 As (ppm) | Percentiles 76°W 435,000 440,000

EASTMAIN INVESTOR PRESENTATION 19

ÉLÉONORE SOUTH JV

STRONG GEOCHEMISTRY, LARGE POTENTIAL

2016 Drilling Program: Surface prospecting (Complete) Phase 1 - 2,500 m drilling (Sept.) Phase 2 – 2,500 m follow up drilling (later 2016)

12 km2

slide-20
SLIDE 20

EASTMAIN INVESTOR PRESENTATION 20

ÉLÉONORE SOUTH JV

DISTICT SCALE GOLD SHOWINGS

slide-21
SLIDE 21

EASTMAIN INVESTOR PRESENTATION 21

ÉLÉONORE SOUTH JV

COMPARISON TO GOLDCORP’S ELEONORE MINE

Larger Footprint Similar Geochemistry

slide-22
SLIDE 22

EASTMAIN INVESTOR PRESENTATION 22

THE WAY FORWARD

PRESSING THE RESET BUTTON 3Q16 4Q16 1Q17 2Q17 3Q17

Complete comprehensive drill campaign (63,000m) Issue updated mineral resource estimate Perform other technical optimization work Optimize and complete PEA and study work

CLEARWATER PROJECT EASTMAIN MINE PROJECT ÉLÉONORE SOUTH JV

Trenching Drilling (7,500m) Drilling (5,000m) Sampling

PRIORITES (Calendar Year)

2017 Program 2017 Program 2017 Program

4Q17

slide-23
SLIDE 23

EASTMAIN INVESTOR PRESENTATION 23

FOR MORE INFORMATION

Claude Lemasson P.Eng., MBA President & CEO

lemasson@eastmain.com

Alison Dwoskin CPIR Manager, Investor Relations

dwoskin@eastmain.com

Office: 647-347-3735

slide-24
SLIDE 24

EASTMAIN INVESTOR PRESENTATION 24

APPENDIX

slide-25
SLIDE 25

EASTMAIN INVESTOR PRESENTATION 25

2H2016 BUDGET

TO DECEMBER 2016 TOTAL BUDGET

$12.6 million

*September 1, 2016 TOTAL CASH POSITION

$19.0 million*

Eau Claire Deposit, 8.8 Eastmain Mine Project, 1.5 Éléonore South JV, 0.8 Corporate Spending, 1.5 Remaining Cash, 6.4

All spending figures listed in millions of Canadian dollars.

slide-26
SLIDE 26

EASTMAIN INVESTOR PRESENTATION 26

CLEARWATER PROJECT

ROAD AND POWER ACCESSIBLE

Eastmain Reservoir Eastmain Reservoir

Eastmain River EM-1 Power Station

Spillway Eau Claire Gold Deposit Base Camp kms 0 5

N

Clearwater Property

Depot

Note: Hydro Quebec’s Eastmain-1 powerhouse was commissioned in

  • 2006. The Eastmain

Reservoir covers approximately 600 km2 and flows into the Opinaca Reservoir. The Eau Claire Gold deposit is accessible by the permanent EM-1 Road. Fuel and accommodation is available at the EM-1 Base Camp. An equipment and fuel depot is accessible by transport via the Spillway. Hydroelectric power for Goldcorp’s Eleonore project is provided by EM-1.

Hydro-electric hook-up at EM-1 - 20 kms from Eau Claire deposit

Mine-ready infrastructure in place

slide-27
SLIDE 27

EASTMAIN INVESTOR PRESENTATION 27

EV/OUNCE VS. GRADE

ER’S EAU CLAIRE DEPOSIT VS. PEER COMPANY’S TOTAL MINERAL RESOURCES

Company Ticker TMAC Resources Inc TMR.TO Pure Gold Mining Inc PGM.V Integra Gold Corp ICG.V Gowest Gold Ltd GWA.V Sabina Gold and Silver Corp SBB.TO Auryn Resources Inc AUG.V Eastmain Resources Inc ER.TO Premier Gold Mines Ltd PG.TO Osisko Mining Corp OSK.TO Marathon Gold Corp MOZ.TO Falco Resources Ltd FPC.V Treasury Metals Inc TML.TO Atlantic Gold Corp AGB.V Kaminak Gold Corp KAM.V Seabridge Gold Inc SEA.TO Victoria Gold Corp VIT.V Corvus Gold Inc KOR.TO

TMR.TO PGM.V ICG.V GWA.V SBB.TO AUG.V ER.TO EAU CLAIRE DEPOSIT PG.TO OSK.TO MOZ.TO FPC.V TML.TO AGB.V KAM.V SEA.TO VIT.V KOR.TO $0 $50 $100 $150 $200 $250 $300 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 EV/oz Au (M+I+I) (C$) M+I+I Grade (g/t Au)

Underground

Open Pit

Open Pit / Underground Prepared by Beacon Securities, using company reports and market data. Prices as of June 20, 2016 market close.

slide-28
SLIDE 28

EASTMAIN INVESTOR PRESENTATION 28

CLEARWATER

EAU CLAIRE MINERAL RESOUCE

EAU CLAIRE DEPOSIT

  • At least 4 mineralized orientations at Eau Claire
  • Deposit character:
  • High-grade “feeder veins” that crosscut an earlier-stage of mineralization
  • Feeder vein thickness ranges from <0.5 to 2.5 metres
  • Often contains multiple clusters of very-fine-grained gold particles
  • Gold occurs in basalt, volcaniclastic rocks and porphyry as vein and replacement zone;

Majority of the metal occurs within basalt host units

  • 3D Modeling interprets mineralization as defined by structural and lithological controls
  • Resulting high confidence in Measured and Indicated mineral resources;

RESOURCE DRILLING

  • Closer-spaced drilling results in higher average grades and improved continuity
  • Drilling since 2011 focused on the upper 1/3 of the deposit to a vertical depth of 300 metres;
  • 2012/2013 Drilling: a significant number of high-grade intercepts defined a “critical mass” that

may support future, ramp-accessible “mineable” gold resources

  • Vertical depth: from 100 to 300 metres down-plunge from the 450 West Zone surface

exposure