WATER (desalnaton plant, water treatment, ppelne, pumpng staton, - - PowerPoint PPT Presentation

water
SMART_READER_LITE
LIVE PREVIEW

WATER (desalnaton plant, water treatment, ppelne, pumpng staton, - - PowerPoint PPT Presentation

Engineering for a Better Future WATER (desalnaton plant, water treatment, ppelne, pumpng staton, reservor) overvew Presentation Outline ENKAs involvement in water treatment and conveyance projects began in 1970. Over the


slide-1
SLIDE 1

WATER

(desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır)

  • vervıew

Engineering for a Better Future

slide-2
SLIDE 2

2

  • f 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

ENKA’s involvement in water treatment and conveyance projects began in 1970. Over the years, ENKA built and continued to undertake the water related projects in Turkey and abroad. The presentation covers the selected projects ın the following order :  DESALINATION PLANTS  WATER / WASTE WATER TREATMENT PLANTS  WATER INTAKE STRUCTURES  PUMPING STATIONS  RESERVOIRS AND STORAGE TANKS  WATER PIPELINES AND DISTRIBUTION SYSTEMS

Presentation Outline

slide-3
SLIDE 3

3

  • f 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349 Project Location Country Client Commence Date Completion Date Contract Price Elazığ - Uluova Irrigation Project Elazığ Turkey State Hydraulic Works - DSİ May-1977 Oct-1979 $5,686,000 Makkah Water Pipeline Makkah Saudi Arabia Ministry of Public Works and Housing - Directorate of Mina Projects July-1977 Nov-1977 $3,750,000 Wasia Water Treatment Plant Wasia Saudi Arabia Ministry of Agriculture and Water Oct-1979 May-1982 $40,000,000 Riyadh Water Treatment and Distribution System New Areas, Part 5, Al Badiah Contract Riyadh Saudi Arabia Ministry of Agriculture and Water Sep-1980 May-1982 $20,000,000 Riyadh Water Transmission System, Pump Stations 5 and 6 Riyadh Saudi Arabia Saline Water Conversion Corporation Mar-1981 July-1983 $22,000,000 Ras Lanuf New Town Project (sewage collection system, rain water systems, water supply network, irrigation etc.) Ras Lanuf Libya Secretariat of Heavy Industries, Brega and Ras Lanuf Higher Committee Feb-1981 May-1985 $224,000,000 Tasluja Water Pipeline and Pumping Station - EPCC Tasluja Iraq State Organization for Construction Industries Mar-1982 Dec-1983 $7,050,000 Diyarbakır Province Sewage System Diyarbakır Turkey İller Bankası Genel Müdürlüğü Apr-1982 Apr-1986 $6,486,733 Al Medinah Housing (Water Supply & Sewage Systems) Al Medinah Saudi Arabia Ministry of Public Works and Housing Apr-1982 Feb-1988 $370,560,000 Kerbela Water Pipeline and Pumping Station - EPCC Kerbela Iraq State Organization for Construction Industries May-1982 Nov-1983 $19,550,000 Diyarbakır Province Drinking Water Supply System Diyarbakır Turkey İller Bankası Genel Müdürlüğü May-1982 May-1986 $2,000,000 Al Khafji Phase 2 Desalination Plant Al Khafji Saudi Arabia Saline Water Conversion Corporation Oct-1982 Feb-1986 $45,061,417 Makkah-Taif Water Transmission System, Reservoirs, Makkah Taif Saudi Arabia Saline Water Conversion Corporation Aug-1983 Mar-1986 $19,913,000 Amman Service Reservoirs – Contracts 2 & 3 Amman Jordan Amman Water & Sewerage Authority Oct-1983 Apr-1986 $20,297,989 Extension of Riyadh Distribution System Secondary Distribution Systems Stage 1 Part 2 & Part 3 Riyadh Saudi Arabia Ministry of Agriculture and Water Nov-1983 Feb-1986 $23,800,000 Al Jubail - Riyadh, Line C, RWC (Reservoirs) Riyadh Saudi Arabia Saline Water Conversion Corporation Feb-1984 Apr-1988 $15,593,790 New Battaliyah Water Stormwater Facilities Al Hofuf Saudi Arabia Ministry of Municipal and Rural Affairs July-1984 May-1985 $4.651,000 Water Supply Project for Sudair Region, Water Distribution System Phase 1 Contract C Sudair Saudi Arabia Ministry of Agriculture and Water July-1984 Apr-1986 $27,831,000 Nahrawan Industrial Estate Water Supply Scheme & Water Treatment Plant Nahrawan Iraq State Organization for Industrial Development Aug-1984 June-1986 $13,700,000

Selected Projects (*sorted by commence dates)

slide-4
SLIDE 4

4

  • f 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349 Project Location Country Client Commence Date Completion Date Contract Price Istanbul Sewerage Project (1st Stage) Civil Works, Mechanical and Electrical Works for Yenikapı Pre-treatment Plant & Pumping Stations İstanbul Turkey General Directorate of Istanbul Water and Sewerage Administration - İSKİ Sept-1984 Aug-1988 $15,095,530 Nazilli Waste Water Treatment Plant Aydın Turkey Province Bank Turkey Oct-1984 May-1988 $1,000,000 Water Supply Project for Nifi and Surrounding Villages, Contract A-2 Nifi Saudi Arabia Ministry of Agriculture & Water Oct-1984 Apr-1986 $4,218,091 Water Lines in Fanateer, Defii and Mutrafiah, Contract No. 570-C11 Jubail Saudi Arabia Royal Commission for Jubail and Yanbu Feb-1985 Sept-1986 $4,579,000 Water Works Improvements Jeddah, 4 Reservoirs and Associated Works Jeddah Saudi Arabia Ministry of Agriculture & Water May-1985 Apr-1986 $9,768,000 Kahramanmaraş Sewage System Network, Collectors and Drinking Water Network System Kahramanmaraş Turkey İller Bankası Genel Müdürlüğü May-1985 May-1987 $11,000,000 Construction of Al Rass Water Supply&Treatment Systems Contract No. 2B Al Rass Saudi Arabia Ministry of Agriculture & Water Nov-1985 July-1987 $4,049,932 Brega New Town Project Water Reservoirs and Piping Works Marsa El Brega Libya Secretariat of Heavy Industries, Brega and Ras Lanuf Higher Committee June-1986 Aug-1993 $13,200,000 Sekköy Dam Water Line for Yeniköy Thermal Power Plant Muğla Turkey Turkish Electricity Authority July-1986 June-1989 $4,500,000 Derna Al-Bumba Water Project Derna Libya The Popular Committee of Al- Gabar - Al-Akhdar Dec-1986 Mar-1996 $52,500,000 Çanakkale Water Treatment Plant Çanakkale Turkey Province Bank Turkey Mar-1987 Aug-1992 $3,000,000 Benghazi Water Reservoir Benghazi Libya Great Man-Made River Authority July-1988 Apr-1991 $65,000,000 Afşin Elbistan B Thermal Power Plant, Amendment 15 New Raw Water Supply System Kahramanmaraş Turkey Electricity Generation Co. Inc. Jan-2006 Aug-2007 $7,498,571 Derna Desalination Plant Derna Libya General Electricity Company of Libya Aug-2006 Aug-2010 EUR 38,000,000 Soussa Desalination Plant Soussa Libya General Electricity Company of Libya Aug-2006 Aug-2010 EUR 25,000,000 Zawia Desalination Plant Zawia Libya General Electricity Company of Libya July-2006 Feb-2012 EUR 62,000,00 Zuara Desalination Plant Zuara Libya General Electricity Company of Libya Mar-2007 Nov-2010 EUR 20,500,000 Produced Water Treatment Facility Basra Iraq ExxonMobil Iraq Limited Dec-2019 Apr-2022 $69,990,847

slide-5
SLIDE 5

5

  • f 32

DESALINATION PLANTS

slide-6
SLIDE 6

6

  • f 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Single purpose desalination plant to produce 5 million gallons per day desalted water by the evaporation of Arabian Gulf water based

  • n

MSF process and transmission of potable water to the distribution terminals in the town of Al Khafji and related office buildings and housing compound. Scope:

  • All civil works of the desalination plant. Turn-key

construction

  • f

sea water intake,

  • utfall

and treatment facilities.

  • Turn-key construction of product water pipeline

and facilities for fuel oil supply, storage and handling.

  • Turn-key

construction

  • f

control buildings, laboratory facilities, maintenance shop, warehouse,

  • ffice buildings, mosque and housing compound

including HVAC and fire protection systems.

CONTRACTING

  • Commencement : October 1982
  • Completion : February 1986
  • Location : Al Khafji - Saudi Arabia
  • Client : Saline Water Conversion Corporation

Al Khafji Phase 2 Desalination Plant-Saudi Arabia

slide-7
SLIDE 7

7

  • f 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

The Project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20.000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP)

  • systems. Heavy fuel oil (HFO) is used as main fuel

for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels.

  • Commencement: August 2006
  • Completion : August 2010
  • Location : Derna - Libya
  • Client : General Electricity Company of Libya

Main Work Item Unit Quantity Concrete m3 14,200 Structural Steel ton 650 Cabling km 170

  • Mech. Equipment

ton 4,800 Engineering Hours hrs 81,000 Document Qty. pcs 1,296

CONTRACTING

Derna Desalination Plant Project (Sea Water Thermal (Med-tvc) Plant) - Libya

slide-8
SLIDE 8

8

  • f 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

The Project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20.000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP)

  • systems. Heavy fuel oil (HFO) is used as main fuel

for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels.

  • Commencement : August 2006
  • Completion : August 2010
  • Location : Soussa - Libya
  • Client : General Electricity Company of Libya

Main Work Item Unit Quantity Concrete m3 11,500 Structural Steel ton 460 Cabling km 147

  • Mech. Equipment

ton 4,000 Engineering Hours hrs 65,000 Document Qty. pcs 1,144

CONTRACTING

Soussa Desalination Plant Project (Sea Water Thermal (Med-tvc) Plant) - Libya

slide-9
SLIDE 9

9

  • f 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

The Project consisted of engineering, procurement, construction, commissioning and start-up of a 4 x 20.000 m3/day Water Production Plant with three type of fuel, Heavy Fuel Oil (HFO), NG and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. NG is planned to be used as main fuel for MED Desalination Plant

  • peration

whereas; heavy fuel oil (HFO) are used as back-up fuels.

  • Commencement : July 2006
  • Completion : February 2012
  • Location : Zawia - Libya
  • Client : General Electricity Company of Libya

Main Work Item Unit Quantity Concrete m3 8,098 Structural Steel ton 486 Cabling km 340

  • Mech. Equipment

ton 7,900 Engineering Hours hrs 48,900 Document Qty. pcs 1,123

CONTRACTING

Zawia Desalination Plant Project (Sea Water Thermal (Med-tvc) Plant) - Libya

slide-10
SLIDE 10

10 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

The Project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20.000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO), and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP)

  • systems. HFO is planned to be used as main fuel

for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels.

  • Commencement : March 2007
  • Completion : November 2010
  • Location : Zuara - Libya
  • Client : General Electricity Company of Libya

Main Work Item Unit Quantity Concrete m3 4,764 Structural Steel ton 341 Cabling km 185

  • Mech. Equipment

ton 4,800 Engineering Hours hrs 28,300 Document Qty. pcs 720

CONTRACTING

Zuara Desalination Plant Project (Sea Water Thermal (Med-tvc) Plant) - Libya

slide-11
SLIDE 11

11 of 32

WATER TREATMENT PLANTS

slide-12
SLIDE 12

12 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Architectural, civil and structural design, and construction and erection of a water treatment plant of 200,000 m³ per day capacity. Laying of 3,000 tons of ductile iron pipes. Civil and building works for coolers, softeners, filters, sludge disposal plant, chemical handling buildings, pump houses, administration buildings, workshops and stores. All mechanical and electrical installation works of the above mentioned units including insulation and painting.

  • Commencement : October 1979
  • Completion : May 1982
  • Location : Wasia – Saudi Arabia
  • Client : Ministry of Agriculture and Water

CONTRACTING

Wasia Water Treatment Plant- Saudi Arabia

slide-13
SLIDE 13

13 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Construction works of “Yenikapı” Pretreatment Plant & Pumping Stations in the framework of Istanbul Sewerage Project (1st Stage). Contract consisted of construction of a coarse screen house, a pumping station (influent); pretreatment plant, a pumping station (effluent), incoming inceptor, sewers and force mains; fabrication and laying of overflow systems and connecting pipes; construction of roads and firefighting. ENKA also undertook the supply and installation of all electrical and mechanical parts of a coarse screen house, sewage pretreatment plant and 2 a pumping stations, which have 5 pumps with a total capacity of 12,5m³/sec.

  • Commencement : September 1984
  • Completion : August 1988
  • Location : İstanbul- Turkey
  • Client : General Directorate of Istanbul Water &

Sewerage Administration – İSKİ

CONTRACTING

Istanbul Sewerage Project, Yenikapı Pretreatment Plant and Pumping Stations- Turkey

slide-14
SLIDE 14

14 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Scope 1: Design and construction of a water treatment plant. Main works comprise softener building, pumping station, fuel storage tanks, waste water station, wells, administration building and electromechanical works.

  • Commencement : April 1985
  • Completion : March 1988
  • Location : Al Rass - Saudi Arabia
  • Client : Ministry of Agriculture and Water

CONTRACTING

Scope 2 : Pipe-laying for transmission and distribution network.

  • Commencement : November 1985
  • Completion : July 1987
  • Location : Al Rass - Saudi Arabia
  • Client : Ministry of Agriculture and Water

Al Rass Water Supply and Treatment Systems- Saudi Arabia

slide-15
SLIDE 15

15 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Ras Lanuf New Town Contracts 11 and 12 is a housing complex project. Scope: Storm Water Drainage System and Water Supply System, 17 km long pipeline with a diameter of 400 mm was used to bring water from the nearby industrial area of the ARC to the a/m reservoir. The networks consists of a main network around the residential areas and second networks inside the apartment blocks. Sewage Treatment Plant and Irrigation System comprise complete sewage water treatment facilities including restricted effluent reuse for irrigation purpose outside the residential areas. Waste water is collected from the residential areas through gravity sewers to the 4 pumping stations and then pumped to the treatment plant, which is an activated sludge process using mechanical and surface aerators. 2 water reservoirs (200,000 m³). The reservoirs foundation lays on a compacted gravel bed. The reservation is abed and walls are made of watering

  • concrete. The necessary circulation and post treatment
  • f water is arranged with two circulation pumps,

chlorine dosing and residual chlorine metering.

CONTRACTING

  • Commencement : February 1981
  • Completion : May 1985
  • Location : Ras Lanuf – Libya
  • Client : Secretariat of Heavy Industries, Brega

and Ras Lanuf Higher Committee

Ras Lanuf New Town Project (Water Supply and Sewage Systems) - Libya

slide-16
SLIDE 16

16 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

  • Location: Basra - Iraq
  • Client: ExxonMobil Iraq Limited
  • Construction Period: Dec 2019 – Apr 2022
  • Project Value: US$ 69.9 Million
  • Project Description:

On October 31, 2019, ENKA signed an agreement with ExxonMobil Iraq Limited to construct a Produced WaterTreatment Facility with a capacity of 210,000 barrels of water per day, located within the West Qurna-1 oil field near the city of Basra in Iraq. The project includes the detailed engineering, procurement, construction, and commissioning of three water treatment trains, one produced water tank, one local equipment room, transfer pumps and all associated systems. The treated produced water will be sent to the Water Injection Storage Tank that feeds the High Pressure Water Injection Pump System for injection wells. The Produced Water 2 Treatment Facility project is scheduled to begin operation in April 2022.

Not by ENKA Partially by ENKA Fully by ENKA

Produced Water Treatment Facility- Iraq

Main Work Item Design, Engineering Procurement Construction Comm& Start up Civil Works Architectural Works Structural Steel Works Piping and 3D Modeling Electrical Works Mechanical Works Instrumentation & Controls

slide-17
SLIDE 17

17 of 32

WATER INTAKE STRUCTURES

slide-18
SLIDE 18

18 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

CONTRACTING

Project covered the turn-key construction of sea water intake structures in offshore and in onshore scopes. These structures designed to feed 80.000 m3/day sea water to the desalination plant in one operational and

  • ne standby configuration.

Offshore:

  • 2 x 1000 m HDPE water pipeline with dia. of 1.4 m
  • 2 x 1000 m HDPE chlorination pipeline
  • 2 x precast concrete head
  • With precast concrete weight blocks of pipeline

Onshore:

  • 2 x concrete water basin
  • 2 x coarse screening machine
  • 2 x rotary screening machine
  • With stop logs and sea water valves
  • Contract Date : August 2006
  • Completion : August 2010
  • Location : Derna - Libya
  • Client : General Electricity Company of Libya

Derna desalınatıon plant Sea water ıntake structure – Libya

slide-19
SLIDE 19

19 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

CONTRACTING

Project covered the turn-key construction of sea water intake structures in offshore and in onshore scopes. These structures designed to feed 80.000 m3/day sea water to the desalination plant in one operational and

  • ne standby configuration.

Offshore:

  • 2 x 500 m HDPE water pipeline with dia. of 1.4 m
  • 2 x 500 m HDPE chlorination pipeline
  • 2 x precast concrete head
  • With precast concrete weight blocks of pipeline

Onshore:

  • 2 x concrete water basin
  • 2 x coarse screening machine
  • 2 x rotary screening machine
  • With stop logs and sea water valves
  • Contract Date : August 2006
  • Completion : June 2010
  • Location : Soussa - Libya
  • Client : General Electricity Company of Libya

SOUSSA desalınatıon plant Sea water ıntake structure – Libya

slide-20
SLIDE 20

20 of 32

PUMPING STATIONS

slide-21
SLIDE 21

21 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

CONTRACTING

Construction of the civil engineering works and supply, delivery and installation of the associated electrical and mechanical equipment

  • f

water pumping stations as listed below:

  • Dahman
  • Judaim
  • Zawia
  • Zahra

The pumping stations incorporates with surge equipment, drainage system and electrical control room.

  • Contract Date : June 2007
  • Completion : July 2010
  • Location : Zawia-Libya
  • Client : General Electricity Company of Libya

ZAWIA PUMPING STATIONS - Libya

slide-22
SLIDE 22

22 of 32

RESERVOIRS and STORAGE TANKS

slide-23
SLIDE 23

23 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

CONTRACTING

Project covered the turn-key construction of 2,666 villas , 2 schools, 2 supermarkets, 2 clinics, 2 post offices, recreational facilities, 2 service shops, 2 cultural centers. All the infrastructure works such as sewerage system, storm water drainage, irrigation and fire fighting network, potable water network, water tanks have been performed in the framework

  • f this turn-key contract. The total length of the pipes layed

is 118,673 m. Scope:

  • Sewer Network
  • Storm Water Drainage Network
  • Fire and Irrigation Network
  • Potable Water Network
  • Commencement : May 1986
  • Completion : August 1993
  • Location : Marsa El Brega - Libya
  • Client : Secretariat of Heavy Industries, Brega and Ras

Lanuf Higher Committee

Brega New Town Project Water Reservoirs and Piping Works - Libya

slide-24
SLIDE 24

24 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

CONTRACTING

Construction of the civil engineering works and supply, delivery and installation of the associated electrical and mechanical equipment of circular earthfill holding reservoir with a capacity of 4,7 million m3. The reservoir comprises an embankment with 9 m. Height and 1 km. of crest diameter, inlet and outlet works and a spillway. The circular earthfill embankment incorporates an internal sand/gravel system drainage system and has internal slopes lined with a synthetic geomembrane of 150,000 m2. Scope: The inlet works,

  • utlet

works and spillway are constructed of reinforced concrete. Water is discharged into the reservoir through 3 submerged discharge valves, each with a diameter of 2,000 mm, and a weight of 30 tons, supplied and installed by ENKA. Manufacturing and installation of polyurethane coated buried steel pipework, with diameters varying between 2,000 and 4,000 mm lined at site by cement mortar and cathodically protected and installation of 8 owner-supplied large valves are

  • included. The project also includes installation of

a prestressed cylindrical concrete by-pass pipeline of 4 m diameter and 1,800 m long.

  • Commencement : July 1988
  • Completion : April 1991
  • Location : Benghazi-Libya
  • Client : Great Man-Made River Authority

Benghazi Water Reservoir - Libya

slide-25
SLIDE 25

25 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

CONTRACTING

Construction of the civil engineering works and supply, delivery and installation of the associated electrical and mechanical equipment of cylindirical water tanks with a capacity of:

  • 2 x 20.000 m3
  • 5 x 10.000 m3
  • 1 x 5.000 m3
  • 1 x 2.500 m3

The steel tanks incorporates an internal level control system with instruments and valves, drainage system.

  • Contract Date : June 2007
  • Completion : July 2010
  • Location : Zawia-Libya
  • Client : General Electricity Company of Libya

ZAWIA WATER STORAGE TANKS - Libya

slide-26
SLIDE 26

26 of 32

WATER PIPELINES and DISTRIBUTION SYSTEMS

slide-27
SLIDE 27

27 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Zawia water network consist of:

  • 125.805 meter of pipeline
  • DN600

54.636m

  • DN500

22.629m

  • DN450

1.576m

  • DN400

9.256m

  • DN350

35.511m

  • DN200

2.197m

CONTRACTING

  • Contract Date : June 2007
  • Completion : July 2010
  • Location : Zawia - Libya
  • Client : General Electricity Company of Libya

ZAWIA WATER PIPELINE and DISTRIBUTION NETWORK – LIBYA

slide-28
SLIDE 28

28 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

In the Diyarbakır Province Sewage System which we undertook in 1977, 15 km long collector was completed in an extremely hard rocky (basalt) area. The construction was carried in the city.

  • Key figures :
  • Excavation: 380,479 m³
  • Concrete: 13,064 m³
  • Pipelaying: 104,102 m
  • Commencement : April 1982
  • Completion : April 1986
  • Location : Diyarbakır - Turkey
  • Client : Province Bank Turkey

CONTRACTING

Diyarbakır Province Sewage System - Turkey

slide-29
SLIDE 29

29 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Construction of the water supply system of Diyarbakır Province consisting of 67 km pipeline

  • Key figures:
  • Excavation: 83,000 m³
  • Concrete: 530 m³
  • Pipelaying: 67,742 m
  • Commencement : May 1982
  • Completion : May 1986
  • Location : Diyarbakır - Turkey
  • Client : Province Bank Turkey

CONTRACTING

Diyarbakır Province Drinking Water Supply System - Turkey

slide-30
SLIDE 30

30 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Al Medinah Al Munawwarah Housing project was composed of 2,084 villas on an area of 2,150,000 m2 and related infrastructure works such as potable water and rain water systems, sewage system and irrigation network. Infrastructure works: Storm Drainage System:

  • Pipe laying: 12,445 m
  • Pipe diameters: 1,050 mm, 750 mm, 600

mm, 300 mm Water Supply System:

  • Pipe laying: 28,000 m
  • Pipe diameters: 200 mm, 150 mm, 50 mm

Irrigation System:

  • Pipe laying: 6,468 m
  • Pipe diameters: 225 mm, 110 mm, 63 mm

Sanitary Sewerage System:

  • Pipe laying: 24,432 m
  • Pipe diameters: 330 mm, 250 mm, 200 mm,

160 mm.

CONTRACTING

Al Medinah Al Munawwarah Housing (Water Supply and Sewage Systems) - Saudi Arabia

  • Commencement : April 1982
  • Completion : February 1988
  • Location : Al Medinah - Saudi Arabia
  • Client : Ministry of Public Works and Housing
slide-31
SLIDE 31

31 of 32

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Turn-key construction of the sewage system network and collectors of the city of Kahramanmaraş including manufacturing of pipes with dia. Between 100-1,200

  • mm. Contact also included drinking water network of

200 km consisting of 100-800 mm dia pipes.

  • Key figures:
  • Excavation: 1,580,000 m³
  • Pipe Manufacturing and Laying: 565,390 m³
  • Filling: 1,239,420 m³
  • Concrete: 46,081m³
  • Commencement : May 1985
  • Completion : May 1987
  • Location : Kahramanmaraş - Turkey
  • Client : Province Bank Turkey

CONTRACTING

Kahramanmaraş Sewage System Network, Collectors and Drinking Water Network System- Turkey

slide-32
SLIDE 32

İNŞAAT VE SANAYİ A.Ş.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul Tel: +90 (212) 376 10 00 (pbx) Fax: +90 (212) 272 88 69 Web: www.enka.com