1 WAMS AMSTER: TER: Field experiences 2010-2014 WAMSTER Ad-hoc synchrophasor measurement network STER Ltd. Croatia, July 2014 www.ster.hr www.wamster.net Presen esentation tation Co Contents ntents 2 1. About our company (STER


  1. 1 WAMS AMSTER: TER: Field experiences 2010-2014 WAMSTER Ad-hoc synchrophasor measurement network STER Ltd. Croatia, July 2014 ∙ www.ster.hr ∙ www.wamster.net

  2. Presen esentation tation Co Contents ntents 2 1. About our company (STER Ltd.) (Studio Elektronike Rijeka d.o.o.) WAMSTER system description 2. 3. WAMSTER achievements, installations and use-cases www.ster.hr

  3. 3 1. About out company STER (Studio Elektronike Rijeka)

  4. Our Our co comp mpany any  ST STER ER 4 Stud udio io Elektr tronik onike e Ri Rijeka ka d.o .o.o. .o. (S (STER) R)  Located in the Technology-Innovation Centre of Rijeka (TIC), J. P. Kamova 19  Development of technological solutions in automation, measurement and electronics  Founded in 2006 based on previous achievements in the field of power quality www.ster.hr

  5. Our Our co comp mpeten etence ce 5  Complete service in the field of measurement:  Hardware development  Firmware/software development  firmware: development of real-time measurement and control algorithms  software: distributed systems for data acquisition, storage, analysis, event detection, alarming  Management of complex measuring campaigns  Locating faults in naval and terrestrial power systems  Design and commissioning of automation systems  Steel plants, tobacco industry, shipyards and ships www.ster.hr

  6. 2. WAMSTER system: 6 wide area monitoring system based on the synchrophasor (PMU) technology, using mobile telephony for data transmission WAM – wide area monitoring PMU – phasor measurement unit

  7. Sy Sync nchr hrophasors ophasors 7  GPS satellite signal provides an accurate time base (1 μ s) across the globe  Pr Precise ise time bas ase e al allows ws system stem moni nitoring toring to be bas ased ed on n ab absolute olute pha hasor sor an angles es  50/60 samples per second www.ster.hr

  8. WAM AMSTER STER sy syst stem em 8  Integrates measurement devices, data storage as a service and online analysis of distributed synchrophasor measurements  Key properties: STER PMU: a handheld, portable device for 1. synchrophasor measurements Uses the mobile network (GPRS/UMTS) for 2. communication Server application (service) for data acquisition, 3. storage, online (web) analysis, event detection and integration with third-party systems www.ster.hr

  9. 9 WAMSTER server Web clients GPRS (PC, laptop, node smartphone) STER PMU synchrophasors Database www.ster.hr

  10. ST STER ER PMU 10  Han andheld held pha haso sor r meas asur urement ment un unit  4 voltage + 4 current inputs  3 voltage ranges: 150/300/1000V  External toroids / current clamps  32GB flash memory (5mo.)  Battery backup (5h)  GPS synchronization (1 μ s/3 μ s)  GPRS communication  RS232 / USB / Ethernet www.ster.hr

  11. Tec echnologica hnological l ad advan vance ce: 11 STER PMU - Handheld device (4 kg incl cl. . bag ag) Mainstr stream eam PMU - Wirele less ss communications - Switchboard weighing 80 kg (mobile networks) - Wired d communication www.ster.hr

  12. ST STER ER PMU 12  Small dimensions  No ventilation  No rotating parts  Ins nstal talled ed in n an any pos ositio ition www.ster.hr

  13. ST STER ER PMU 13  Magnetic baseplate allows direct mounting to switchboard doors or backplanes www.ster.hr

  14. WAM AMSTER. STER.NET NET 14  Server application  Data concentration over GPRS/Ethernet  Data storage provided  Online access from any web enabled device (laptop, smartphone)  Online data analysis and event detection with configurable event triggering  Extensions: integration with existing systems (continuous forwarding, offline/daily/weekly archiving, FTP uploading) www.ster.hr

  15. WAM AMSTER STER Sy Syst stem em 15 . . . . . . TCP/IP Server Web Interface Ster Concentrator Real Time Data Provider Ster Logger Historical Data Provider WAMSTER Server Web Server Database www.ster.hr

  16. WAM AMSTER. STER.NET NET 16  Online device status monitoring  Full remote access to all devices over web www.ster.hr

  17. WAM AMSTER. STER.NET NET 17  Offline measurement analysis (trends)  Online measurement comparison www.ster.hr

  18. WAM AMSTER. STER.NET NET 18  Configurable event detection  Export to other formats (CSV) and download www.ster.hr

  19. WAM AMSTER STER extensions tensions 19  Custom system state visualization on request  Integration with other systems:  Synchroshield (2010) – continuous data forwarding over the Internet towards CARWAMS  Energynautics (2012-2013) – daily archives are automatically sent to the client’s FTP server  Custom communication protocols  E-mail/SMS notifications www.ster.hr

  20. 20 3. WAMSTER installations and use cases

  21. Ins Insta tall llations ations 201 2010-2014 2014 21  CARW RWAMS, MS, Croa oati tia 2010-2011, 9 PMUs for University of Rijeka  ZA ZAGR GREB Ri Ring ng, , Croa oatia tia 2011-2012, 6 PMUs for HEP (Croatian TPO)  HEP P PP PP Sjever er, , Croa oatia ia 2012, 4 PMUs for HEP (Croatian TPO)  UMEME ME 24/7 /7, , Ke Keny nya 2012-2013, 6 PMUs for Energynautics Germany  NIAF Abuj uja a demo monstr nstrati ation on proj ojec ect, t, Nigeri ria 2013, Bridging SCADA demonstration for KU Leuven (Belgium), Nigeria Infrastructure Agency Facility (NIAF) and Bauchi State University, Nigeria  Re Rene newa wable ble Ene nergy gy Systems tems as assessment, essment, Seychell helles es 2014 (ongoing), 3 PMUs for Energynautics Germany  Dyna namic ic Re Reac act. . Compe mpens nsat ation ion Strategy ategy proj ojec ect, t, UAE UAE 2014 (ongoing), 20 PMUs for TRANSCO/ADWEA United Arab Emirates www.ster.hr

  22. CARWAMS AMS  Implemented for University of Rijeka  Active since 09/ 09/2010 2010 until 09/ 09/2011 2011  Hor.: 0.4kV, , Vert.: 0.4kV - 110kV  Data stream towards the TSO PDC www.ster.hr

  23. CARW RWAM AMS S LV an anal alysis ysis Event triggering: 23 • 50 fps on demand 50 fps request Monitoring and baselining: • Continuous 1 fps reporting • Daily angle fluctuations • Seasonal fluctuations A ( t ) STER:RITEH STER:FERZG 3 5 2 0 angle diference(deg) angle diference(deg) 1 -5 0 -10 -1 -15 04/Mar/2011 04/Mar/2011 -2 -20 17/Jun/2011 17/Jun/2011 -3 -25 00:00 06:00 12:00 18:00 00:00 00:00 06:00 12:00 18:00 00:00 a) b) STER:FESB STER:ETFOS 5 5 04/Mar/2011 04/Mar/2011 0 0 angle diference(deg) angle diference(deg) 17/Jun/2011 17/Jun/2011 -5 -5 φ ( t ) -10 -10 -15 -15 -20 -20 -25 -25 00:00 06:00 12:00 18:00 00:00 00:00 06:00 12:00 18:00 00:00 c) d) www.ster.hr

  24. CARM RMAWS: WS: HV HV-MV MV-LV V voltage tage level vels 24 Angle comparison HV-MV-LV 4.5 T:TSRIJEKA 110kV / 35kV L:TSRIJEKA - TSCENTAR 4 T:TSCENTAR 35kV / 10kV TSCENTAR10kV - LV:RITEH 3.5 Angle difference (degrees) 3 2.5 2 1.5 1 0.5 0 00:00 06:00 12:00 18:00 00:00 www.ster.hr

  25. Zag agreb b rin ing g 110kV 110kV 25  SIPS Project / HEP, conducted by Faculty of Engineering Rijeka  09/2 /201 011 until 03/2 /2012 12 www.ster.hr

  26. Zag agreb eb rin ing: : Topolo logy y loop op recon confi figur guration tion 26 20-Oct-2011 12:16:40 P = -45.9 MW Q = -2.3 MVAr www.ster.hr

  27. 27 Zag agreb eb rin ing : islanding caused by operator’s mistake 12-Jan-2012 52 JARUN-ELTO TETO-BOTINEC1 TETO-MRACLIN 51.5 Frequency (Hz) 51 Δ f = 1.2Hz 50.5 50 49.5 11:49:00 11:50:00 12-Jan-2012 12-Jan-2012 20 100 18 50 16 0 Power (MW,MVAr) Angle(deg) 14 -50 12 -100 P:ELTO-TRPIMIROVA P:TETO-BOTINEC1 Reference: STER-RI -150 P:TETO-MRACLIN 10 JARUN-ELTO Q:ELTO-TRPIMIROVA TETO-BOTINEC1 Q:TETO-BOTINEC1 -200 8 TETO-MRACLIN Q:TETO-MRACLIN 11:49:00 11:49:10 11:49:20 11:49:30 11:49:40 11:49:50 11:50:00 11:49:50 11:49:51 11:49:52 11:49:53 11:49:54 www.ster.hr

  28. HEP EP PP Sj Sjever ver 28  TSO HEP Pr Produc duction tion, , HE Sjever, er, Jul ul-Au Aug g 2012. 2012.  Problem: HP Dub ubrava ava power generator stopped due to power oscillations – cause unknown www.ster.hr

  29. HEP EP PP Sj Sjever ver 29  Customer requested a custom page for system stem overvi rview w an and onl nlin ine e monitoring toring www.ster.hr

  30. HEP EP PP Sj Sjever ver 30  Retrieved data provided new insights Switch tching ng events nts Atmospheric heric discha harge ges www.ster.hr

  31. HEP EP PP Sj Sjever ver 31  18-Jul-201: Detected power fluctuations www.ster.hr

  32. NIA IAF F Ab Abuj uja, a, Nigeria igeria 32  „Bridging SCADA“ demonstration, Apo Substation, in cooperation with:  KU Leuven, Belgium  Nigeria Infrastructure Agency Facility (NIAF), Nigeria  Bauchi State University, Nigeria www.ster.hr

  33. NIAF Abuj uja, a, Nig igeria eria 33  Typical frequency fluctuations (49-51 Hz), blackout and switch to the DG supply 51 Hz 50 Hz 49 Hz 48 Hz www.ster.hr

  34. NIAF Abuj uja, a, Nig igeria eria 34  Frequency fluctuation details (2h interval) 51 Hz 50 Hz 49 Hz www.ster.hr

  35. Ke Kenya nya, , Af Africa (2012/2013) 35  Energynautics Germany, UMEME 24/7 Germany  6 PMU devices, event detection, FTP upload www.ster.hr

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.