walkup aquatic center kiddie pool addition
play

Walkup Aquatic Center - Kiddie Pool Addition Schematic Design - PowerPoint PPT Presentation

Los Alamos County Walkup Aquatic Center - Kiddie Pool Addition Schematic Design Presentation AUGUST 28, 2019 Schedule Kiddie Pool Addition WORKPLAN & COMMUNICATION PROCESS Los Alamos County Walkup Aquatic Center 2019 2020 2021 June


  1. Los Alamos County Walkup Aquatic Center - Kiddie Pool Addition Schematic Design Presentation AUGUST 28, 2019

  2. Schedule Kiddie Pool Addition WORKPLAN & COMMUNICATION PROCESS Los Alamos County Walkup Aquatic Center 2019 2020 2021 June 10 May 4 June 4 2019 August 20 2019 2019 SCHEMATIC DESIGN August 20 October 29 2019 DESIGN DEVELOPMENT 2020 PROGRESS PROGRESS October 29 February 4 PROJECT KICK-OFF 100% SD 50% SD 75% SD 2020 CONSTRUCTION DOCS/SPECS FINAL 2 3 4 1 April 2 PROGRESS PROGRESS DD START BIDDING/ 100% DD 60% DD 90% DD CONST. PERMIT FINAL PROGRESS PROGRESS 7 8 9 10 CD START 100% CD 60% CD 90% CD • Review Program & • 75% SD Progress • 100% Schematic • Preliminary Designs FINAL Building Areas Design Review 12 13 14 15 • Schematic Design • SD cost estimates • Budget/ Schedule • Begin Peer Review Progress: PERIODIC • Code analysis • DD Progress • 60% DD Progress • 90% DD Progress • 100% DD Site Plan, Floor • Discuss Overall • Geotech Progress Document PROJECT Plan, Elevations PROGRESS Milestones • Survey Update • Public Information • Los Alamos County • Discuss Comments Submission CLOSEOUT MEETINGS • Survey Update Meeting AHJ From FM + AHJ • Survey • CD Begin • 60% CD Progress • 90% CD Progress • CD Final • Site Walk-Through • Geotech Progress • Peer/ Owner Review • Estimate of Probable • Review With Owner • Los Alamos County • Building Envelope • Finalize Finishes • Fire Marshal • Public Information • Submit Plans/ Specs • Parking Variance Construction Cost Fire Marshal Meeting • Estimate of Meeting Meeting to County • Punch List (P&Z update) • HVAC Options Probable Cost • Finalize HVAC • Schedule IDRC, P&Z, • Meet With County • Review Layout Systems • County Utility • Finalize Building • Public Information • Review of ACAS submittal • Pool Consultant • Budget/ Schedule O+M Staff • Present to Aquatics Meeting Systems Meeting Operations • Pool Consultant Center Advisory • Pool Consultant • Schedule site plan • Pool Consultant • Pool Consultant Committee (ACAS) • MEP Review • Finalize Building • Page Turning Session • Final amendment, parking • MEP • Site Envelope With Owner Documentation waiver, plat approval • Utilities • Present to Parks + • Building Envelope (release of liens) Recreation Board • Building Envelope • Estimate Update • Estimate • HVAC life cycle costs • Building Envelope (PRB) • Estimate Update • Confirm Classroom • Present to Aquatics Layouts & PARTICIPANTS: PARTICIPANTS: PARTICIPANTS: PARTICIPANTS: • Building Envelope Center Advisory Furnishings • OWNER • OWNER • OWNER • OWNER Committee (ACAS) • FBT • FBT • FBT • FBT PARTICIPANTS: PARTICIPANTS: PARTICIPANTS: PARTICIPANTS: • 12 Month Warranty • CHH2O • Present to Parks + Walk • OWNER • OWNER • OWNER • OWNER Recreation Board • FBT • FBT • FBT • FBT (PRB) • B+P • LAC FM • AGI • ACAS June 10 July 15 August 5 June 24 PARTICIPANTS: PARTICIPANTS: PARTICIPANTS: PARTICIPANTS: • CHH2O • AGI • PRB • OWNER • OWNER • OWNER • OWNER • FBT • FBT • FBT • FBT PARTICIPANTS: TBD TBD TBD TBD • LAC FM • ACAS • OWNER • PRB • FBT • General Contractor TBD TBD TBD TBD TBD Program Verification Budget Schedule Schematic Design Budget Utilities Systems Materials Budget Systems Utilities Fire Marshal Bidding Construction Warranty

  3. POOL ADDITION PROGRAM ELEMENTS - 2,000 SF zero-entry pool, with spray features, lazy river, and an area for swim lessons. - Water slide with run-out area separate from main pool. - (3) family changing rooms - Pool support spaces, including mechanical, chemical storage, and electrical rooms. - Total project budget: $6.5 million - Construction is slated to begin in May 2020 and last for a year. Los Alamos County - Larry Walkup Aquatic Center Pool Addition Project Site Plan & Program - August 28, 2019

  4. EXISTING SEWER LINE EXISTING MANHOLE NEW SEWER LINE

  5. EXISTING SEWER LINE EXISTING MANHOLE NEW SEWER LINE

  6. Los Alamos County - Larry Walkup Aquatic Center Pool Addition Project Aquatic Features - August 28, 2019

  7. 29'-0 5 " 16 STAIR START BELOW 8" A 8'-103 WALL BLOCKOUTS, CLOSURE PANELS, AND SEALING AROUND THE SLIDE AT WALL PENETRATIONS IS BY OTHERS (TYP) START DECK EL. 119.25' POOL DECK EL. 100.00' RUNOUT DECK EL. 100.00' 19'-3" Los Alamos County - Larry Walkup Aquatic Center Pool Addition Project Aquatic Features - August 28, 2019

  8. LOBBY NEW FINISH EXISTING FINISH 373 SF LOBBY VESTIBULE 118 SF VESTIBULE NEW ENTRANCE DESIGN VESTIBULE 190 SF LOBBY 415 SF Los Alamos County - Larry Walkup Aquatic Center Pool Addition Project EXISTING ENTRANCE Entrance Design - August 28, 2019

  9. Your Input is Important! Please drop comment cards in the box or hand to staff. Comments can also be sent to lacpw@lacnm.us Los Alamos County - Larry Walkup Aquatic Center Pool Addition Project Comment Cards - August 28, 2019

  10. Questions / Comments? Los Alamos County - Larry Walkup Aquatic Center Pool Addition Project Questions / Comments - August 28, 2019

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.