wadebridge padstow cna information classification
play

Wadebridge & Padstow CNA Information Classification: CONTROLLED - PowerPoint PPT Presentation

Wadebridge & Padstow CNA Information Classification: CONTROLLED WP 1 Road markings and signage Trelill Road, St Kew Information Classification: CONTROLLED Total scheme cost 4,189.78 Information Classification: CONTROLLED WP 3 Road markings


  1. Wadebridge & Padstow CNA

  2. Information Classification: CONTROLLED WP 1 Road markings and signage Trelill Road, St Kew

  3. Information Classification: CONTROLLED Total scheme cost £4,189.78

  4. Information Classification: CONTROLLED WP 3 Road markings and signage Trewint Hill, Trebetherick

  5. Information Classification: CONTROLLED Total scheme cost £ 2,629.94

  6. Information Classification: CONTROLLED WP6 Road markings and signage, St Endellion Although this was received via the Expression of interest route the works already featured on our maintenance program and has now been completed at no cost to the Community Network Area budget.

  7. Information Classification: CONTROLLED WP 9 Road markings and signage A389 St Issey

  8. Information Classification: CONTROLLED Total scheme cost £ 7,033.59

  9. Information Classification: CONTROLLED WP10, 11 & 13 MSAS on Network rotation Mobile Speed Activation Signs, 8 sites on an annual rotation with a service package for 4 years. Total Scheme cost £18,028.89

  10. Information Classification: CONTROLLED WP14 Dropped kerbing, Wadebridge Town (Various locations) Total scheme cost £ 4,766.01

  11. Information Classification: CONTROLLED WP19 Parking Enforcement, Various locations, TRO Various locations – Traffic Regulation Order Whiterock Road, Wadebridge Trevanion Road, Wadebridge Bradfords Quay, Wadebridge Old Road, Little Petherick Oystercatcher Hill, Polzeath Total scheme cost £ 10,000

  12. Information Classification: CONTROLLED WP24 Pedestrian Refuge Island Trevisker, St Eval Although this was received via the Expression of interest route the works are now being funded by Section 106 monies from Developer contributions at no cost to the Community Network Area budget.

  13. Information Classification: CONTROLLED WP25 Turn right facility, Hawksfield A39 Atlantic Highway A design commission to look at the possibility of introducing a turn right facility into the Hawksfield development on the A39. Detailed design and costings. Total Estimated Scheme cost £10,000

  14. Information Classification: CONTROLLED WP26 Width restriction, Lower Treneague, St Breock Width restriction supported by legal Traffic Regulation Order. Total Scheme cost £10,000

  15. Information Classification: CONTROLLED WP27 Relocation of existing 30mph limit, West Hill, Wadebridge Relocation of 30mph limits, installation of new lit columns supported by legal Traffic Regulation Order. Total Scheme cost £15,000

  16. Information Classification: CONTROLLED Budget to date

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend