VT15 / Allen Martin Drive Intersection Scoping Study
ALTERNATIVES PRESENTATION MEETING
DECEMBER 19, 2016
VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES - - PowerPoint PPT Presentation
VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives Feedback
DECEMBER 19, 2016
2 12/19/16 RSG
3 12/19/16 RSG
4 12/19/16 RSG
5 12/19/16 RSG
Secondary Study Area in Purple (Saxon Hill Industrial Park) Future Thompson Drive Extension Primary Study Area: 250$feet from VT$15 and Allen Martin Drive intersection
6 12/19/16 RSG
7 12/19/16 RSG
3 2 1
8 12/19/16 RSG
Date Damage / Injury Road Surface Condition Type of Collision 01/29/16 Property Damage Only Wet
Angle Broadside; NB3L and EB3T
09/22/15 Property Damage Only Dry
Rear End; NB
06/24/15 Injury Dry
Broadside; NB3L, EB3T, and WB3T
02/17/15 Property Damage Only Ice
Rear End; EB
11/11/14 Property Damage Only Dry
Rear End; NB
02/06/14 Property Damage Only Snow
Rear End; WB; 4 cars
06/11/13 Property Damage Only Wet
Rear End; WB
09/23/11 Injury Dry
Rear End; WB
9 12/19/16 RSG
11 12/19/16 RSG
Rear-end crashes on VT-15 Congestion on Allen Martin Drive Congestion on VT Route 15 Speeding vehicles along VT-15 Engine braking noise from vehicles entering speed zone Uncomfortable environment for pedestrians Short Term S1 Restrict Engine Braking X X S2 Extend 35 mph speed zone X X S3 Striped shoulder on VT-15 adjacent to turn lane island X S4 Intersection warning sign on approach to Allen Martin Drive on VT-15 X Medium Term M1 Extend green space into VT-15 near turn lane island (permanent S3) X M2 Add a WB left turn lane X X M3 Extend sidewalk along VT-15 from Sandhill Rd X X M4 Add / extend separate NB right- and left-turn lanes X M5 Widen eastbound right turn curve radius X M6 Flashing intersection beacon X Long Term L1 Construct Allen Martin Parkway exit from VT-289 X L2 Construct Thompson Drive extension to VT-117 X L3 Intersection Control Modification: Signal X X L4 Intersection Control Modification: Roundabout X X X X L5 Construct connection to Saxon Hill Road X Identified Issues ("X" indicates the proposed alternative may partially address the issue)
12 12/19/16 RSG
Rear-end crashes on VT-15 Congestion on Allen Martin Drive Congestion on VT Route 15 Speeding vehicles along VT-15 Engine braking noise from vehicles entering speed zone Uncomfortable environment for pedestrians Short Term S1 Restrict Engine Braking X X S2 Extend 35 mph speed zone X X S3 Striped shoulder on VT-15 adjacent to turn lane island X S4 Intersection warning sign on approach to Allen Martin Drive on VT-15 X Medium Term M1 Extend green space into VT-15 near turn lane island (permanent S3) X M2 Add a WB left turn lane X X M3 Extend sidewalk along VT-15 from Sandhill Rd X X M4 Add / extend separate NB right- and left-turn lanes X M5 Widen eastbound right turn curve radius X M6 Flashing intersection beacon X Long Term L1 Construct Allen Martin Parkway exit from VT-289 X L2 Construct Thompson Drive extension to VT-117 X L3 Intersection Control Modification: Signal X X L4 Intersection Control Modification: Roundabout X X X X L5 Construct connection to Saxon Hill Road X Identified Issues ("X" indicates the proposed alternative may partially address the issue)
13 12/19/16 RSG
14 12/19/16 RSG
15 12/19/16 RSG
Striping in 2011 (Google Streetview) Striping in 2016
16 12/19/16 RSG
17 12/19/16 RSG
18 12/19/16 RSG
19 12/19/16 RSG
20 12/19/16 RSG
21 12/19/16 RSG
22 12/19/16 RSG
23 12/19/16 RSG
25 12/19/16 RSG
26 12/19/16 RSG
27 12/19/16 RSG
28 12/19/16 RSG
LOS Delay LOS Delay LOS Delay LOS Delay NB Left A 9.5 B 10.9 A 9.4 A 8.9 NB Right B 10.8 B 12.7 B 12.8 C 24.5 WB Left A 5.9 B 18.0 B 12.0 C 21.3 WB Thru A 4.2 A 4.1 A 5.6 A 8.3 EB Thru A 3.3 A 3.3 A 9.1 B 16.5 EB Right A 3.2 A 3.5 A 4.8 A 7.3 Overall A 5.1 B 10.0 A 9.3 B 16.6 Projected (Build) AM Peak Hour PM Peak Hour Movement Permitted (No Build) Projected (Build) Permitted (No Build) LOS Delay LOS Delay LOS Delay LOS Delay EB A 8 B 15 A 9 B 11 WB B 11 D 26 A 6 A 8 NB A 4 A 4 A 9 C 16 Overall A 9 C 21 A 9 B 12 Projected (Build) Movement AM Peak Hour PM Peak Hour Permitted (No Build) Projected (Build) Permitted (No Build)
29 12/19/16 RSG
PROJECT ENGINEER
VISIT: www.ccrpcvt.org/our3work/transportation/current3 projects/scoping/allen3martin3drive3vt153intersection3scoping3study
CCRPC TRANSPORTATION PLANNING ENGINEER
31 12/19/16 RSG
100 200 300 400 500 600 700 800 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM
Vehicles / Hour (Adjusted) Starting Time
VT315 / Allen Martin Drive Adjusted Hourly Traffic Volumes by Direction
EB WB NB
32 12/19/16 RSG
33 12/19/16 RSG
Existing Sidewalk Existing Sidewalk Proposed Sidewalk Proposed Sidewalk Existing Sidewalk Proposed Sidewalk
34 12/19/16 RSG
35 12/19/16 RSG
36 12/19/16 RSG