SLIDE 1
Existing Intersection
- hird level
– Fourth level » Fifth level
City of Camas NW 6 th and Norwood Intersection Options Existing - - PowerPoint PPT Presentation
City of Camas NW 6 th and Norwood Intersection Options Existing Intersection hird level Fourth level Fifth level Signalized Intersection Construction Cost - $300,000 Design/Construction Support - $60,000 Signal Total -
– Fourth level » Fifth level
– Reduced Speeds – Focus on one traffic stream – Refuge Island