vision zero ramp intersection study phase 1
play

Vision Zero Ramp Intersection Study: Phase 1 Board Agenda Item 7 - PowerPoint PPT Presentation

Vision Zero Ramp Intersection Study: Phase 1 Board Agenda Item 7 SAN N FRANC NCISCO COU OUNT NTY TRANS NSPORTATION N AUTHORITY May 8, 2018 Project Overview Funde ded b by Prop p K D6 NTIP Planni ning ng Pur urpose:


  1. Vision Zero Ramp Intersection Study: Phase 1 Board Agenda Item 7 SAN N FRANC NCISCO COU OUNT NTY TRANS NSPORTATION N AUTHORITY May 8, 2018

  2. Project Overview  Funde ded b by Prop p K D6 NTIP Planni ning ng  Pur urpose:  Improve traffic s safety f for all ll modes a s at SoMa Ma free eeway r ramp in intersectio ions  De Develop l low-cost, n nea ear t ter erm improvement c im concepts  Five freeway y ramp interse secti ctions selecte cted base sed on:  Locati tion on --- --- South uth o of Marke ket Youth uth and F Famil ily S Specia ial l Use Distric ict  Traffic ic c collis isio ions  Not in inclu luded in in other pla lanning effor fforts 2

  3. Study Area Studied intersections – 5 th and Bryant Street ► 5 th and Harrison Street ► 8 th and Harrison Street ► 9 th and Bryant Street ► 10 th and Bryant Street ► 3

  4. Existing Conditions Wayfin indin ing C g Confus usion ion Missin ing P g Ped/Bik ike e Infras astr tructu ture Lack o of V Visib ibilit lity 4

  5. Existing Conditions Multiple l lanes o of high- • speed t traf affic Long pedestr strian an crossing • distan tances Lack o of s sign gnal visibility • 5

  6. Proposed Improvement Plans Leadin ing g pedestr strian an interv rvals New New s sig ignal m mast a t arm Signal al t timing c chan anges Curb rb bu bulb-out out Open n new c cross sswal alk Lane r restr triping 6

  7. Example Concept Plan –5 th and Bryant Street Colli llision P Pattern Proposed I Improvement 7

  8. Project Outreach  Community o ty outreach ch:  Neighbo borh rhood g d groups ps  Advoca cacy cy g groups ps  SF Poli lice D Department  Vi Visi sion Z Zero T Task ask Force  Community f ty feedback ck:  Addit itio ional p pedestria ian b bulb lb-ou outs ts  Enf nforcement to to s sto top v vehi hicle from bl blocking pe pede destrian c cro rosswalks  Addi dditional stop ba p bars rs  Greenin ing in g in la large p pedestrian bulb lb-ou outs ts  In resp sponse se to feedback, ck, c constructi ction budget et inc ncrea eased ed to inc ncorporate additi tional e enhance cements ts 8

  9. Project Funding and Implementation  Total estim timate ted p project ct cost: $4.4 m 4 million th an th and  5 th and Har arrison St Street, 5 th nd Bry ryant nt Street eet th Street I  5 th Improvement P Proje ject expected to be comple leted in in 2019 th an th and th and  8 th and Har arrison St Street, 9 th nd Bry ryant nt Street eet, 10 th nd Bry ryant nt Street reet  Include ded i in signal u upg pgra rade des in the dra draft SFMTA CI CIP F P FY 19-23 23  Pe Pending S SFMTA B Board rd A Appro pproval; expe pected d Ju July 2 2018  Ot Other er potent ential f fund nding g sources es:  San F Francisco F o Funds: Propos ositi tion K on K, Propos ositi tion on B, and Prop opos ositi tion on A A  Interage gency P Pla lan I Implementatio ion Committee ( (IPIC)  Hig ighway S Safety I Improvement P Progr gram ( (HSI SIP)  Active T Transportation P Progr gram (ATP) 9

  10. Next Steps: Phase 2  Ph Phase 2 – Freeway y Ramp Interse secti ction Saf Safety St Study  Project Overview V Vid ideo a at www.sfct cta.org rg/ra /ramps ps-2  Study dy Surv rvey: h https ps:// //soma-su survey.sf .sfcta.o a.org  Ini niti tial outr treach o h ong ngoing ng to to: Shar are st study g goal als an and r ram amp • in intersectio ions Gather in input o on stakehold lders’ • experie iences a and im improvement id ideas  Next xt st step: : Propose d draf aft saf safety im improvements by summer 2 2018  Stu tudy completion b by y Janu nuary 2 y 2019 10

  11. Questions? Priyoti Ahmed priyoti.ahmed@sfcta.org SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend