Vision Zero Ramp Intersection Study: Phase 1 Citizen Advisory - PowerPoint PPT Presentation

Vision Zero Ramp Intersection Study: Phase 1 Citizen Advisory Committee Agenda Item 11 SAN N FRANC NCISCO COU OUNT NTY TRANS NSPORTATION N AUTHORITY April 25, 25, 20 2018 Project Overview Funde ded b by Prop p K D6 NTIP P


  1. Vision Zero Ramp Intersection Study: Phase 1 Citizen Advisory Committee Agenda Item 11 SAN N FRANC NCISCO COU OUNT NTY TRANS NSPORTATION N AUTHORITY April 25, 25, 20 2018

  2. Project Overview  Funde ded b by Prop p K D6 NTIP P Planni ning ng  Pur urpose:  Improve traffic s safety f for all ll modes a s at SoMa Ma free eeway r ramp in intersectio ions  De Develop l low-cost, n nea ear t ter erm improvement c im concepts  Five freeway y ramp interse secti ctions s selecte cted base sed on:  Locati tion on --- --- South uth o of Marke ket Youth uth and F Fami mily y Zone  Traffic ic c collis isio ions  Not in inclu luded in in other pla lanning g effor fforts 2

  3. Study Area Studied intersections – 5 th and Bryant Street ► 5 th and Harrison Street ► 8 th and Harrison Street ► 9 th and Bryant Street ► 10 th and Bryant Street ► 3

  4. Existing Conditions 4

  5. Existing Conditions 5

  6. Recommended Improvement Plans 6

  7. Example Concept Plan –5 th and Bryant Street Colli llision P Pattern Proposed I Improvement 7

  8. Project Outreach  Community o ty outreach ch:  Neighbo borh rhood g d groups ps  Advoca cacy cy g group  SF Poli lice D Department  Vi Visi sion Z Zero T Task ask Force  Community f ty feedback ck:  Addit itio ional p pedestria ian b bulb lb outs  Enf nforcement to to s sto top v vehi hicle from bl blocking pe pede destrian c cro rosswalks  Addi dditional stop ba p bars rs  Greenin ing in g in la large p pedestrian bulb lb-ou outs ts  Fe Feedback was s inco corporated in th the project t desi sign and constructi ction budget. t. 8

  9. Project Funding and Implementation th an th and  5 th and Har arrison St Street & & 5 th nd Bry ryant nt Street reet th Street I  5 th Improvement P Proje ject expected to be comple leted in in 2019 th an th and th an  8 th and Har arrison St Street, 9 th nd Bry ryant nt & 10 th and Br Bryan ant St Street  Included in the d draf aft SFMT MTA C CIP F FY 1 19-23 23  Pendin ing S g SFMTA B Board A Approval; July ly 2 2018  Ot Other er potent ential f fund nding g sources es:  San F Francisco F o Funds: Propos ositi tion K on K, Propos ositi tion on B, and Prop opos ositi tion on A A  Interage gency P Pla lan I Implementatio ion Committee ( (IPIC)  Hig ighway S Safety I Improvement P Progr gram ( (HSI SIP)  Active T Transportation P Progr gram (ATP) 9

  10. Next Steps: Phase 2  Ph Phase 2 – Freeway y Ramp Interse secti ction Saf Safety St Study  Project Overview V Vid ideo: https ps://w //www.youtube.co com/watch ch?v=AiT3Jd Jd DyGb0 DyGb  Study S Survey: https: s://so soma-su survey.sf .sfcta.o a.org  In Spring 2 g 2018 Outreach r round w we will b ill be: Communi nicating ng stu tudy g y goals a and nd • obje jectives Sh Sharing s sel elec ected ed s study ramps • intersectio in ions Identif ifyin ing s g safety is issues •  Propose s sho hort-term a and lo long-te term s safety ty improvements im 10

  11. Questions? Colin Dentel-Post colin.dentel-post@sfcta.org SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 06/28/2017

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.