Vanderbilt Drive/Cul-de-sacs Vanderbilt Drive Public Utility Renewal Project Beautification MSTU FPL (Water/Wastewater/Stormwater) Utility Burial Project 5/15/17 Final May 15, 2017 2 1 4 5 6 3 7 Project Area Water Sewer / FM / PS*


slide-1
SLIDE 1

5/15/17 Final Vanderbilt Drive Beautification MSTU FPL Utility Burial Project Vanderbilt Drive/Cul-de-sacs Public Utility Renewal Project (Water/Wastewater/Stormwater)

May 15, 2017

slide-2
SLIDE 2
slide-3
SLIDE 3

1 2 3 4 5 6 7

Project Area Water % Sewer / FM / PS* % Stormwater % Restoration 1st Lift Asphalt MSTU Energizing Flamingo Ave. 100 100 / 100 / 95 50 Mid-June to Mid-July 2017 May 2017 June thru August 2018 Heron Ave. 100 100 / 100 / 95 95 May to Mid-June 2017 May 2017 Egret Ave. 100 75 / 0 / 0 July to Mid- August 2017 July 2017 Conners Ave. 100 Moved to Phase 5 September 2018 (water) Moved to Phase 5 Vanderbilt

  • Dr. Phase 1

100 95 / 5 / NA July to Mid- August 2017 July 2017 June to August 2018 Vanderbilt

  • Dr. Phase 3

May 2017 through April 2018 March to April 2018 March 2018 February to March 2019 Vanderbilt

  • Dr. Phase 4

June 2017 through March 2018 March 2018 March 2018 September to October 2018 Phase 5 May 2018 through September 2018 July to Sept 2018 July to Sept 2018 September to October 2018 Phase 6 April 2018 through January 2019 Oct 2018 to Jan 2019 Oct 2018 to Jan 2019 February to March 2019 Phase 7 December 2018 through Feb 2019 Feb 2019 Feb 2019 April 2019

*FM = Force Main, PS = Pump Station

slide-4
SLIDE 4

Conners Ave. moved to Phase 5 286 Heron Ave. staging moving to Conner Park New Phase 1 – 7 Staging Area

slide-5
SLIDE 5

152 Heron Ave. paver storage to remain until September 2017 Flamingo Ave. & Heron Ave. 1st lift asphalt May 2017 Egret Ave. & Vanderbilt Dr. 1st lift asphalt July 2017

slide-6
SLIDE 6

Anticipated May 2017 – April 2018 Anticipated June 2017 – March 2018

slide-7
SLIDE 7

Anticipated April – May 2018 Anticipated May – June 2018

slide-8
SLIDE 8

Anticipated June – Aug 2018 Anticipated May – September 2018

slide-9
SLIDE 9

Anticipated Sept. – Oct. 2018 Anticipated April 2018 – January 2019

slide-10
SLIDE 10

Anticipated Feb. – March 2019 Anticipated Dec. 2018 – Feb. 2019

slide-11
SLIDE 11

Anticipated April 2019

slide-12
SLIDE 12

Stormwater Management

slide-13
SLIDE 13

Stormwater Management

slide-14
SLIDE 14
slide-15
SLIDE 15

Stormwater Management

slide-16
SLIDE 16

Stormwater Management Stormwater Management

slide-17
SLIDE 17

Project Area MSTU Energizing Main Feeder (Vanderbilt Dr., Bluebill, & VBR) April - May 2018 Bluebill Ave. May 2018 VBR & GulfShore Dr. June 2018 Flamingo Ave., Heron Ave., & Egret Ave. June - August 2018 Conners Ave., Seabee Ave., Germain Ave., Seagull, & Willet September - October 2018 Tradewinds Ave., Lagoon Ave., Bayside Ave., Pine

  • Ave. & Oaks Ave.

February - March 2019 Palm Court, 9207 Vanderbilt Dr. & Chateau Vanderbilt April 2019

slide-18
SLIDE 18
slide-19
SLIDE 19

VDCPUR@stantec.com

slide-20
SLIDE 20
slide-21
SLIDE 21

www.CollierPUR.com

*FM = Force Main, PS = Pump Station