REPUBLIC OF SLOVENIA - GOVERNMENT OFFICE FOR LOCAL SELF-GOVERNMENT AND REGIONAL POLICY Investment in Your Future The operation co-financed by the European Union European Fund for Regional Development, Cohesion Fund, European Social Fund
Use of the ISARR IT system Use of the ISARR IT system Data Entering - - PowerPoint PPT Presentation
Use of the ISARR IT system Use of the ISARR IT system Data Entering - - PowerPoint PPT Presentation
REPUBLIC OF SLOVENIA - GOVERNMENT OFFICE FOR LOCAL SELF-GOVERNMENT AND REGIONAL POLICY Investment in Your Future The operation co-financed by the European Union European Fund for Regional Development, Cohesion Fund, European Social Fund Use of
MČS training programme
09:00 – 10:00 Introductory presentation 10:00 – 10:15 Short break 10:15 – 11:30 Practical training (part 1) 11:30 – 11:45 Short break 11:30 – 11:45 Short break 11:45 – 12:45 Practical training (part 2) 12:45 – 13:00 Conclusion 13:00 – 14:00 Lunch
Introductory presentation
- Cohesion policy
- ISARR IT system
- Reporting via the MVP module
- Utilisation of funds via the MČS
module
Cohesion policy (1)
The following operational programmes (OP) are implemented within the ETC and IPA:
- IPA operational programme Slovenia - Croatia 2007-
2013 (OP SI-HR). 2013 (OP SI-HR).
- Operational programme Slovenia - Austria 2007-
2013 (OP SI-AT).
- Operational programme Slovenia - Hungary
2007-2013 (OP SI-HU).
Cohesion policy (2) The OP includes/specifies:
- Situation analysis, strategies, organisational structure, financing
system etc.
- Priority tasks with appropriate allocation of funds of the ETC and
IPA. IPA.
- Priority tasks are carried out by managing authorities, in line with
the Decree on the Implementation of Procedures for the Use of Funds within the Framework
- f
the European Territorial Cooperation and the Instrument for Pre-Accession Assistance in the Republic of Slovenia for the programming period 2007-2013, and are divided into measures.
- The measures are implemented via instruments (public tenders)
used to select operations.
Cohesion policy (3)
- The managing authority fills in the forms for planning of
the operational programme and submits them to the JTS for entry of data in the ISARR system.
- The forms are filled in in line with the instructions of the
managing authority (SVLR) for monitoring managing authority (SVLR) for monitoring implementation of the OP with the ISARR IT system for the ETC and IPA programmes (instructions available
- n http://www.svlr.gov.si or http://www.euskladi.si).
- The ISARR provides for a printout which is a
precondition for approving of the instruments by the managing authority (SVLR).
The ISARR has been set up as an integrated system for managing EU and domestic development policies. The purpose long-term objectives of development of the ISARR system in the DIIP: Support processing and reporting requirements of the
ISARR IT system (1)
Support processing and reporting requirements of the EU in the financial perspective 2007-2013.
- Support processing and reporting requirements of
users (the Government and ministries) in implementation of domestic development policies.
- Improve work efficiency of all persons involved in
development policies and programmes.
- Ensure permanent reliability and security in use of the
ISARR.
Basic characteristics of the ISARR
- It is the framework and reference system for monitoring
implementation of strategic development documents (NSRO), their development programmes and in conjunction with the MFERAC also implementation of pertaining operations and projects.
ISARR IT system (2)
projects.
- It eliminates local ponds and implements common and uniform
rules under which all data are gathered at one place.
- It is based on a decentralised approach and enables the users
to responsibly perform the tasks on their posts in line with the common rules.
- It supports management of the process of drawing of EU funds
in conjunction with IS-PA2007 (Objective 1) and fully (Objective 3).
Strategic level Programme level
ISARR by its levels supports planning from above and monitoring from below.
National Strategic Reference Framework
Global
- bjectives
Specific
- bjectives
Results (Priorities) Action
Operational programmes (OP)
Global
- bjectives
Specific
- bjectives
Results (Priorities) Action
Development priorities
Planning changes
(retransfer
Programme level Implementation level
Development priorities
Global
- bjectives
Specific
- bjectives
Results (Priorities) Action
Priority policies
Global
- bjectives
Specific
- bjectives
Results (Priorities) Action
Instruments
Global
- bjectives
Specific
- bjectives
Results (Priorities) Action
Operations
Global
- bjectives
Specific
- bjectives
Results (Priorities) Action
Projects
Global
- bjectives
Specific
- bjectives
Results (Priorities) Action
Ordering implementation Implementing activity Gathering data Data analysis
(retransfer
- f funds)
ISARR IT system (4)
System architecture
MRS MRS MRS MRS
Module for the reference system
MSP MSP MSP MSP
Module for status reporting
MVP MVP MVP MVP
Data entry module
MAP MAP MAP MAP
Module for data analysis
MPP MPP MPP MPP
Module for data transfer
MJR MJR MJR MJR
Module for public tenders
MVP MVP MVP MVP
ISARR IT system (5)
- Reference System Module - MRS
- Administrative module for system maintenance and setup.
- Maintenance of code books, setup of user rights.
- Entry of data at the level of priority tasks, instruments, operations and units.
– MRS - planning segment
- User sub-module for operations planning.
- It supports the process of planning of operations from preparations to
completed financing of the operation (the last LB AfR (ZzP) paid) and monitoring.
- It enables creating and editing operations, units, financial plans, contracts,
activities, physical objectives and cost plans.
– MRS - fund drawing segment
- User sub-module for supporting fund drawing
- It supports the payment and refund process.
- It enables editing the AfR (ZzI) at the unit level and editing the LB AfR (ZzP)
at the operation level.
ISARR IT system (6)
- MJR - Public Tenders Module
- User module for public tenders.
- It enables the process of opening and assessing bids and creating
various printouts.
- MVP - Data Entry Module
- MVP - Data Entry Module
- User module for implementing operations.
- It covers the entire process of implementing the operation from
contract signature to completed financing of the operation and monitoring.
- It
enables creating partial reports (AfR, ZzI) with pertaining enclosures and creating joint reports (LB AfR, ZzP).
ISARR IT system (7)
- MPP - Data Transfer Module
- A technical module for transforming data for exchange with other IT systems
inside and outside the national administration.
- The MPP is linked to the following systems: MFERAC, eCRP, AJPES,
APZnet, ISPA, ISPA 2007, data exchange with the Slovenian Statistical Office SURS etc.
- MSP - Status Reporting Module
- User module for reporting on development programmes with pre-prepared
status reports and document printouts.
- MAP - Data Analysis Module
- User module for data analyses at the development programme level.
- It enables in-depth inquiries up to the level of operations and stages and by
miscellaneous dimensions (territorial units, periods, statuses, sources etc.).
ISARR IT system (8)
CPU - HelpDesk The CPU enables the following to users of the ISARR system:
- Reporting defects.
- Asking questions related to the system.
- Help in use of the system.
- Knowledge database:
- Knowledge database:
- Frequently asked questions (FAQ).
- Instructions for use of applications (HOW TO).
- User documentation and detailed instructions.
- Access to literature related to training.
- Access to urgent information in real time via a telephone
exchange.
- Information on eliminated defects.
ISARR IT system (9)
System login process for users
- Filling of the form Access application for the ISARR.
- Password for the digital certificate.
- Username and password for access to modules of the
ISARR system.
- Username and password for access to the CPU web
application (http://projects.ipmit.si/sites/cpu).
ISARR IT system (10)
Key information:
Web page:
http://projects.ipmit.si/sites/cpu
Telephone assistance (Mon. - Fri., 8 a.m. - 4 p.m.):
00386 1 3009 803
User roles - MVP module
- Lead beneficiary:
- Reviewing
information about your unit (activities, invoices, reports, goals),
- Reviewing
information about
- ther
partners (beneficiaries),
Data entering via the MVP module (1)
(beneficiaries),
- Reviewing the financial plan of the entire operations,
- Invoice entry and invoice application,
- Creation of individual partner reports (AfR - ZzI) and
- verall operation reports (LB AfR - ZzP).
* The lead beneficiary of the operation also uses the MVP module in the role of a beneficiary, on the level of a single unit.
User roles - MVP module
- Unit benefitiary (partner):
- Reviewing
information about your unit (activities, invoices, reports, goals),
- Reviewing the financial plan of your unit,
Data entering via the MVP module (2)
- Reviewing the financial plan of your unit,
- Invoice entry and invoice aplication,
- Preparing partner reports (AfR - ZzI).
Creation of a partner report – (AfR or ZzI)
When kreating a partner report (ZzI) the application automatically gathers all selected invoice aplications, which fit the following criteria:
- Invoice aplications were entered by partners or by the lead
partner.
Data entering via the MVP module (3)
- Activities or tasks, which the invoice aplication is asigned to must
be completed or with the status “continuous payments”.
- Invoice aplication is not asigned to any existing report.
- The invoice declaration was not yet reimbursed to the partner
(prevention of double financing).
Creation of overall reports – (LB AfR or ZzP)
When creating an overall report for the operation (ZzP) the application automatically gathers all selected partner reports (ZzI) which fit the following criteria:
- Partner reports (ZzI) were created by partners or by the lead
partner.
Data entering via the MVP module (4)
partner.
- Partner reports (ZzI) were confirmed by the controller.
- Partner reports (ZzI) were not asigned to any other overall report
(ZzP).
User roles - MČS module
- Administrator (ETC):
- Viewing data at the instrument level.
- Controller (national controller):
- Control review of claims.
Utilisation of funds via the MČS module (1)
- Control review of claims.
- Editing AfR (ZzI) (excluding, decreasing documents,
entering other sources and retransferring costs).
- Financial officer (ETC administrator):
- Financial review of claims.
- Preparing and possible linking of orders to the AfR (ZzI).
- Approving claims (PA):
- Authorisation and certification of the LB AfR (ZzP).
Utilisation of funds via the MČS module (2)
act Proces zahtevkov (vsebinski pogled) Partner National FLC Leading partner JTS OU Objective 3 JSRR
Start Preparing ZzI Approving ZzI Preparing ZzP Printout Statement of eligible cost Printout ZzI Payment of the national share based on ZzI Approving ZzP by JTS Approving OzP by OU Registering OzP by JSRR Submitting claim to the EU End Printout Form
- f approval
(OzP) Printout ZzP
Utilisation of funds via the MČS module (3)
act Business Process Model MVP MPP MCS
Start Entry of invoices Preparing ZzI Transfer of ZzI to MČS Editing and approving ZzI Partner Printout ZzI approving ZzI Transfer of approved ZzI to MVP Preparing ZzP Payment of national cofinancing share Transfer ZzP to MČS Leading partner National cofinancer JTS End Printout statement of eligible cost Printout OzP Printout ZzP Approving ZzP by JTS Approving OzP by OU OU
R
Reversible restoring
Partner
- Nat. co-financer
System move by the ISARR
Application for Reimbursement implementation process - Objective 3
Utilisation of funds via the MČS module (3)
PP PD KP PLN PL
VP
CF-IZK
Lead Beneficiary Application for Reimbursement implementation process
- Objective 3
JTS PA (JSRR)
R Reversible restoring
ETC (MA) System move by the ISARR
Utilisation of funds via the MČS module (4)
PD RG
R
OD AVT ZV
CF-IZK