Use of multi wires chambers in air for profile measurements of intensive beams at IHEP (Protvino) 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) Neutrino beams at IHEP Years Proton Neutrino


  1. Use of multi wires chambers in air for profile measurements of intensive beams at IHEP (Protvino) 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)

  2. Neutrino beams at IHEP Years Proton Neutrino Detector(s) Results beam beams ν µ , anti- ν µ 1. µ -pairs in ν -interactions; 1974 Up to ITEP Spark - 2x10 12 , Neutrino focused 2. search for short-lived particles 1982 30 Detector beam; using nuclear emulsion; bunches, 3. σ tot ( ν N), quasi-elastic scattering, beam-dump 5 µ s spill including limits on ν µ -oscillation duration parameters, ν µ e-scattering, etc. 4. prompt neutrinos (charm production in pFe-interactions) ν µ , anti- ν µ 1. ν ( anti- ν )-inclusive scattering, 1985 Up to SKAT 1.4x10 13 structure functions, ν e - ν µ - Bubble focused 2003 (booster), Chamber beam; universality, exclusive channels 29 (up to 1990); beam-dump; 2. prompt neutrinos bunches, short decay 3. ν e -oscillations with Neutrino 5 µ s spill path JINR-IHEP Calorimeter duration Neutrino Calorimeter 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 2

  3. Construction Mechanical construction of cham ber ( type A) V bias V bias V bias a d b c 1 1 2 Y profile 2 Beam 120mm 156mm 15 15 16 16 116 wires 116 wires 3 mm 1 16 element b element a and d X profile 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 3

  4. Construction - 2 Main param eters of cham ber A and B Chamber A Chamber B Signal Construction 14 central + 2x12 wires 16 strips, 140mm electrode connected in parallel, working area 38mm working area Material beryllium-bronze alloy aluminum wire of ∅ 200 � 40 � x 8mm Size Distance 0.8mm 1mm between wires/strips Bias plane 116 wires, 1mm step, 116 wires, 1mm step, beryllium-bronze alloy beryllium-bronze alloy Distance between signal and bias plane 3mm 3mm 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 4

  5. Electronics Schem atic chamber 20m draw ing ADC + memory Tim ing diagram digitalization beam τ ≥ 100 µ s Signal Time 5 µ s 5-10 µ s 5 µ s 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 5

  6. Measurements (vacuum) Originally the chambers were used inside of beam pipe under a pressure of ~ 10 -2 torr Beam profiles Chamber A Chamber B Channel Channel number number 16 mm 140 mm Beam profile for focused (chamber A) and wide beam (chamber B) Num ber of δ -electrons Number of � -electrons per proton (measured with V bias = 0): chamber A – 0.03, chamber B – 0.01 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 6

  7. Measurements (vacuum) - 2 Linearity spill duration varied from 20 ns to 5 � s chamber signal is a sum of 14 central wires signals intensity measured by BCT V bias = 0 Chamber signal, Chamber A relative units 1.0• 10 13 Beam intensity, protons/ cm 2 the same dependency was observed for chamber B too 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 7

  8. Measurements (vacuum) - 3 Dependence of signal on pressure and bias voltage chamber signal is a sum of all wires signals Chamber signal, P ~ 1 Torr relative units P ~ 2x10 -1 Torr P ~ 5x10 -2 Torr P ~ 5x10 -3 Torr Bias voltage, V for V bias = 0 the signal is equal for all pressures after first 1-2 years of use all chambers were operated with V bias = 0 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 8

  9. The chambers in air Focused neutrino beam beam-pipe chamber target 1985 - 1994 beam ~ 5m ~ 5-7m Short decay path beam beam-pipe chamber target absorber ~ 1996 beam ~ 10m 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 9

  10. Measurements (air) Linearity Chamber signal, relative units Proton intensity in 10 12 protons per spill (5 � s) Chamber signal, relative units Proton intensity in 10 12 protons per spill (5 � s) 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 10

  11. Summary The m ulti w ires cham bers w ere usefully used during m any years in vacuum and air for profile m easurem ents of intensive proton beam s. 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 11

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.