TREATMENT PLANT By Wastewater Management Authority (WMA) Assisted - - PowerPoint PPT Presentation

treatment plant
SMART_READER_LITE
LIVE PREVIEW

TREATMENT PLANT By Wastewater Management Authority (WMA) Assisted - - PowerPoint PPT Presentation

ENGAGEMENT TOWARDS A BETTER ENVIRONMENT THE NEW ROCHE BOIS WASTEWATER PUMPING STATION AND THE BAIE DU TOMBEAU WASTEWATER TREATMENT PLANT By Wastewater Management Authority (WMA) Assisted by Development Bank of Southern Africa (DBSA)


slide-1
SLIDE 1

By ENGAGEMENT TOWARDS A BETTER ENVIRONMENT

THE NEW ROCHE BOIS WASTEWATER PUMPING STATION AND THE BAIE DU TOMBEAU WASTEWATER TREATMENT PLANT

Wastewater Management Authority (WMA)

Assisted by

Development Bank of Southern Africa (DBSA)

slide-2
SLIDE 2

Vision & Mission

Vision

  • To equip Mauritius with state-of-art sewerage system and ensure a sustainable and

clean environment for maintaining the island’s reputation as a dream destination;

  • To protect our water bodies and the environment for future generations;

Mission

  • Protect water and marine environment of Mauritius;
  • Provide excellent quality of wastewater services to residential and business

customers;

  • Achieve financial sustainability;
  • Forge a reliable partnership with all stakeholders sensitive to the cause of the

environment.

slide-3
SLIDE 3

Treatment Plant Capacity (m3/day) Ave Treated Wastewater (m3/day) Treatment Level Disposal St Martin 69,000 53,400 Primary, Secondary & Tertiary Treatment (UV disinfection) Sea Outfall / Reuse in Sugarcane Irrigation Baie du Tombeau 48,000 41,000 Preliminary Treatment Long Sea Outfall Montagne Jacquot 48,000 39,700 Primary Treatment Long Sea Outfall Grand Baie 3,500 2,300 Primary, Secondary & Tertiary Treatment (Chlorination) Borehole Injection / Irrigation

WMA’s Major WWTPs

slide-4
SLIDE 4

Roche Bois Pump Station

  • Receives wastewater from
  • Gravity sewers
  • Trucks (160 x 30m3/day)
  • Leachate from Mare Chicose Landfill Site (3 x 30m3/day)
slide-5
SLIDE 5

Roche Bois Pump Station

slide-6
SLIDE 6

Baie du Tombeau WWTW

  • A primary treatment facility (screening), with non-

compliant effluent to the current ocean discharge permits

  • Receives effluent from
  • Pump Station BT1 (incorporating BT2, BT3 and BT4 pump

stations)

  • Roche Bois Pump Station
  • Pump Station BT5
  • Tianli Pump Station
slide-7
SLIDE 7

Baie du Tombeau WWTW

slide-8
SLIDE 8

Baie du Tombeau WWTW

slide-9
SLIDE 9

Baie du Tombeau WWTW

slide-10
SLIDE 10

Key Issues

  • Project flows and influent quality monitoring
  • Leachate Treatment
  • Industrial Effluent Management
  • Effluent Reuse, By-Product Treatment and

Beneficiation, Biogas-to-Energy etc.

slide-11
SLIDE 11

ENGAGEMENT TOWARDS A BETTER ENVIRONMENT

THANK YOU