Transport and Installation Project Management Offshore Construction

Blue Parrot is committed to an incident and injury free workplace, and cares about its Employees and its Clients, everyday, everywhere.

slide-2
SLIDE 2

Who We Are

Privately owned Company, established in

2014 in Spain.

Core Business: Transport and Installation

Project Management Contractor.

Combined competence of the Management

Team in the offshore construction industry is 70 years.

slide-3
SLIDE 3

QHSE Commitment

 Safety: primary focus area for our

Management Team

Minimisation of the impact of our activities

  • n the environment

Open communication with Stakeholders to continue improving the quality of our services

slide-4
SLIDE 4

Company Overview

slide-5
SLIDE 5

Market Assessment

Moray Firth – 1.1GW

Moray Firth Renewables Ltd

Dogger Bank – 7.2 GW

Forewind Consortium

Hornsea – 4 GW

Smartwind Consortium

East Anglia – 7.2 GW

East Anglia Offshore Wind Ltd

Rampion – 0.4 GW

E.ON

Seagreen – 3.5GW

Seagreen Wind Energy Ltd

Navitus Bay – 0.8GW

Eneco

Outlook for the next 10 years In UK 3000 foundations (8MW WTGs)

slide-6
SLIDE 6

Market Assessment

UK DE Offshore Wind Farm Name Operator Potential N.

  • f WTGs

Offshore Wind Farm Name Operator Potential N.

  • f WTGs

Beatrice Repsol- Copenhagen Infrastructure-SSE 140Arkona Becken Eon 80 East Anglia Iberdrola-Vattenfall 900Borkum Riffgrund Dong Energy 142 Dogger Bank Statoil-Statkraft- SSE-RWE 900Delta Nordsee Eon 67 Hornsea Mainstream- Siemens-Dong Energy 500He Dreiht Enbw 80 Moray Firth EDP-Repsol 135Hohe See Enbw 80 Rampion Eon 116Gode Wind Dong Energy 154 Navitus Bay Eneco-EDF 100Innogy Nordsee RWE 174 Galloper RWE 68Albatros Enbw 79 Inch Cape EDP-Repsol 110Veja Mate Laidlaw Capital Group 72 Burbo Bank Extension Dong Energy 32Horizont Mainstream 190 Triton Knoll RWE 100 DK Race Bank Dong Energy 91Krigers Flak under tender 75 Seagreen SEE-Fluor 400Horns Rev 3 under tender 50 Walney Extension Dong Energy 110Mejlflak Havvind Arhus 20

Other Competitors Blue Parrot Offshore

10%-15% Market Share

slide-7
SLIDE 7

Company Organisation Chart

Stakeholders/Sharehol ders CEO

CFO and HR Officer

HSE Officer COO

Construction Manager Transport and Installation Manager Engineering Manager

slide-8
SLIDE 8

T&I Project Task Force

COO

T&I Manager Technical Project Manager Planning and Logistics Doc/Cost Controller Naval Architect Structural Engineer CAD Installation Engineer Project Engineer QHSE

slide-9
SLIDE 9

Why Blue Parrot Offshore

Delivering what you need, when you need, at a competitive price.

 QHSE Focussed  Cost Competitive  Technically Competent  Transparent and Flexible

slide-10
SLIDE 10
slide-11
SLIDE 11

Current Development

  • EPCI
  • Fabrication and Manufacturing
  • Transport and Installation Offshore

Benefits of integration

Reduced number of contracts

Reduced interfaces and risks

Reduced impact on scope changes

Increased investors appetite for well defined project budgets

slide-12
SLIDE 12

Fabrication Yard

Cádiz

slide-13
SLIDE 13

Fabrication Yard

  • 15000sqm, 2500 smq

indoor, 20t/sqm loading capacity

  • Direct access to

quayside for load out

  • perations (200m

long, 14m deep)

  • Complex welded structures (jackets) capability
  • Future upgrade: 150mm thickness x 10m diameter

rolling machine (XL Monopiles)

slide-14
SLIDE 14

Strengths of the Logistics Platform

 Strategic location  Communication and Transports (Ports,

Jerez Airport and City Transport in Jerez)

 Climate  Storage / capacities, processing and distribution

to national and international markets

 Value added services related

to Transportation, Research and Training

Freeport

How does Blue Parrot integrate these?

slide-15
SLIDE 15

Blue Parrot Business Model

Design/Engin eering Procurement Fabrication Transportation Offshore Installation

IDEA Engineering Blue Parrot Procurement Blue Parrot Fabrication Altius Blue Parrot Offshore Project Management QA/QC HSSE Cost Competitiveness

slide-16
SLIDE 16

Blue Parrot: Strategic Targets

 Establish EPCI company integrating engineering,

fabrication and offshore construction in the Cadiz logistic hub

 Potential Clients

Iberdrola Repsol Cepsa NATO Navantia

Onshore, civil fabrication & services Offshore Services (ROVs, subsea, etc.)  Annual turnover 50-100m EUR

slide-17
SLIDE 17

Fabrication Yard

slide-18
SLIDE 18

Fabrication Yard

slide-19
SLIDE 19

Fabrication Yard

slide-20
SLIDE 20

Current Status

 Fabrication Yard in Cadiz

up and running

Iberdrola Wikinger Wind

Farm, Offshore Substation Topsides

Fabrication and

installation 3.400 ton grillage for Mariner project (24.000 ton jacket)

slide-21
SLIDE 21

Logistics Platform in Southern Europe

Cadiz, Gateway to America and Africa in Europe

slide-22
SLIDE 22

Logistics Platform in Southern Europe

 Strategic location  Communication and Transportation (Ports, Free

Zones, Jerez Airport and City Transport in Jerez).

 Storage capacities, processing and distribution

to national and international markets.

 Value added services related

to Transportation, Research and Training.

Strongholds

slide-23
SLIDE 23

VOLGOGRAD DEEP CONVERSION COMPLEX PROJECT

slide-24
SLIDE 24

TUPRAS Izmit, RESID UPGRADING Project

slide-25
SLIDE 25

ANHOLT OFFSHORE WIND PROJECT

DETALLES DEL PROYECTO

Año: 2011 Sector: Offshore Puertos de carga: Aviles Puerto de descarga: Grenaa (Dinamarca) Carga: Jacket Peso 550 ton

Alcance: Transporte desde zona de fabricación en Avilés hasta zona de instalación en Grenaa

slide-26
SLIDE 26

TOTAL Raffinage Marketing – RN DGO5 ISBL Project

DETALLES DEL PROYECTO

Año: 2013 Sector: Modular Puerto de carga: Tarragona Puerto de descarga: Le Havre (Francia) Carga:18x módulos pre-ensamblados

  • Max. dimensiones: 33 x 16 x 12 m;
  • Max. peso: 321 ton

Alcance: Transporte desde taller del fabricante en Tarragona hasta la refinería en Normandía