TRANSBAY TRANSIT CENTER

Transbay Transit Center TG08.2 Exterior Metal Awning System Package – W-1

Pre-Bid Conference Transbay Joint Powers Authority 201 Mission, Suite 2100 San Francisco, CA 2:00pm November 14, 2013

Please sign in!

AGENDA

  • Welcome and Introductions
  • Trade Package Overview
  • SBE Participation Overview
  • Proposal Submittal Requirements
  • Questions and Answers
  • Meeting with Pre-Qualified Trade Subcontractors &

Networking

  • Job Walk for Prime Bidders

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

slide-2
SLIDE 2

2

TG08.2 General Information

  • Client: Transbay Joint Powers Authority (TJPA)
  • General Contractor: Webcor/Obayashi Joint Venture
  • Architect: Pelli Clark Pelli

/ Adamson Associates

  • Structural Engineer: Thornton Tomasetti

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

Information and all IFB documentation is located on the TJPA website:

www.transbaycenter.org > TJPA > Doing Business with the TJPA > Current Contract Opportunities > Exterior Awning System Package

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

slide-3
SLIDE 3

3

Transbay Transit Center

TG08.2 Exterior Metal Awning System W-1

Pre-Qualified Trade Subcontractors Enclos Josef Gartner Crown Corr Skanska Steel Constructors

Transbay Transit Center

TG08.2 Exterior Metal Awning System W-1

slide-4
SLIDE 4

4

Invitation For Bid (IFB)

  • Exhibit A with Scope of Work
  • Bid Manual with Attachments and Exhibits
  • Project Specifications & Drawings
  • Available at plan rooms shown on website

Transbay Transit Center

TG08.2 Exterior Metal Awning System W-1

Transbay Transit Center

TG08.2 Exterior Metal Awning System W-1

slide-5
SLIDE 5

5

Bid Process – Timeframe and Dates

  • Qualifications Due:

2:00 pm Pacific Time on December 6, 2013

  • Questions/Requests for Clarifications Due:

2:00 pm Pacific Time on December 10, 2013 Use the editable QBD form from website

  • VE Package Due:

2:00 pm Pacific Time on January 09, 2014 TG08.2 Exterior Metal Awning W-1 System

  • Bid Packages Due:

2:00 pm Pacific Time on January 16, 2014Eor Metal Awning W-1 ystem

  • TJPA Board Vote to Approve the Contract Award:

Tentatively February 13, 2014

Transbay Transit Center

TG08.2 Exterior Metal Awning System W-1 re

You are here!

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

slide-6
SLIDE 6

6

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

slide-7
SLIDE 7

7

TG08.2 Exterior Awning System (W-1)

  • 1. Struts and tie-ins off structural steel superstructure
  • 2. Secondary steel pipe frame support
  • 3. Exterior Awning panels – Pre-painted perforated metal
  • 4. LED light fixture – Base and Alternate lighting systems

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

SUPERSTRUCTURE

slide-8
SLIDE 8

8

AWNING SUBSTRUCTURE NATOMA STREET VIEW – METAL PANEL AWNING STUDY 1

slide-9
SLIDE 9

9

TG08.2 Key Construction Items

  • 1. 3D Survey of erected structural steel.
  • 2. Design/ Build System, mockups and testing.
  • 3. Hoisting: Base Bid and Alternate.

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

  • TG08.2 A1- 8101 Base Bid Modules

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

slide-10
SLIDE 10

10

NATOMA STREET VIEW – METAL PANEL AWNING STUDY 1 METAL PANEL AWNING DETAILED VIEW – STUDY 1

slide-11
SLIDE 11

11

  • TG08.2 Patch Plates A1- 8140 Base Bid

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

NATOMA STREET VIEW – METAL PANEL AWNING LIGHTING 1

slide-12
SLIDE 12

12

  • TG08.2 Sheet A1- 8148 Base Bid Work

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

TG08.2 ALTERNATES (01 10 30 /APC)

  • 1. LED Dot Lighting Fixtures Specs. 26 56 26 on W-1. See A1-8148.
  • 2. Penrose Panel Pattern-continuous. Example on

Sheets A1-8144A & A1-8147A.

  • 3. Panels extended in lieu of individual smaller panels. Example on

variations on Sheets A1-8137 & A1-8137A.

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

slide-13
SLIDE 13

13

NATOMA STREET VIEW – METAL PANEL AWNING LIGHTING 2

  • TG08.2 Sheet A1-8148 Alternate # 1

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

slide-14
SLIDE 14

14

PATTERNS

  • TG08.2 Sheet A1-8147A Alternate #2

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

slide-15
SLIDE 15

15

PANELIZATION NATOMA STREET VIEW – METAL PANEL AWNING LIGHTING 2

slide-16
SLIDE 16

16

  • TG08.2 Alternate # 3 Details A1-8137A

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

NATOMA STREET VIEW – METAL PANEL AWNING LIGHTING 1

slide-17
SLIDE 17

17

  • TG08.2 IFB Set

– Structural Drawings – Architectural Drawings – Electrical Drawings (Base & LED Alternates) – Specifications

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

Questions on Bid Docs

Submit ALL IFB Questions via editable QBD Form Email: TransbayBidding_TG08.2@webcor-obayashi.com Deadline: Friday, 12/10/2013, 2:00 pm

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

slide-18
SLIDE 18

18

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

How to Submit a Responsive Bid

  • 1. Complete and include ALL forms! Bidding Checklist
  • 2. Meet ALL Deadlines and Times!
  • 3. Proposal is due by 2:00 pm January 16, 2014

Webcor/Obayashi will use the clock at :

http://www.time.gov/timezone.cgi?Pacific/d/-8/java

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

slide-19
SLIDE 19

19

Transbay Transit Center

TG08.2 Exterior Metal Awning W-1 System

Remember to sign all forms!! All questions regarding the IFB will need to be submitted and answered through the QBD process.

TRANSBAY TRANSIT CENTER

SBE Program Overview TG08.2 Thursday, November 14, 2013 2:00pm

slide-20
SLIDE 20

20

SBE Program Overview Agenda

I. Overview of SBE Program II. Overview of SBE Goal for TG08.2

  • III. Participation Strategies to Meet the Goal
  • IV. Step by Step Overview of EOI

SBE PROGRAM OVERVIEW

Certification & Certifying Agencies

SBE PROGRAM OVERVIEW

DBE SBE LBE

slide-21
SLIDE 21

21

Veteran Business & Workforce Participation

SBE PROGRAM OVERVIEW

SBE Project Participation Goal: 20%

August 2012 Billings – Construction Only

  • 112 SBEs to date

SBE PROGRAM OVERVIEW

slide-22
SLIDE 22

22

TG08.2 Exterior Metal Awning Trade Package

20% SBE Participation Goal Focus on “Trade Package Specific Information”

  • Includes SBE/DBE/LBE Certifications
  • Certification Assistance Provided By Program
  • Meets Commercially Useful Function Guidelines
  • Expression of Interest – Marketing Tool

SBE PROGRAM OVERVIEW

Building Relationships

Pre-Qualified Trade Subcontractors

  • Enclos
  • Josef Gartner
  • Crown Corr
  • Skanska Steel Constructors

SBE PROGRAM OVERVIEW

slide-23
SLIDE 23

23

Commercially Useful Function (CUF)

A business performing a CUF is one that does all of the following:

  • Is responsible for the execution of a distinct element of the work of the

contract.

  • Carries out its obligation by actually performing managing or supervising the

work involved.

  • Performs work that is normal for its business, services and function.
  • Is not further subcontracting a portion of the work that is greater than that

expected to be subcontracted by normal industry practices.

SBE PROGRAM OVERVIEW

CUF Evaluation TEST

  • Is the supplier (whether it is the prime or a subcontractor) responsible for the

execution of a distinct element of the resulting contract?

  • Will the supplier actually be performing, managing, or supervising an element of

the resulting contract?

  • Will the supplier be performing work that is normal for its business, services and

function?

  • Is there further subcontracting that is greater than that expected to be

subcontracted by normal industry practices?

SBE PROGRAM OVERVIEW

slide-24
SLIDE 24

24

North American Industry Classification System The NAICS Code – Materials/Equipment/Supplies (Examples)

  • 239910 Construction equipment rental
  • 532412 Welding equipment rental
  • 532490 Rental equipment
  • 423610 Construction materials/supplies
  • 423840 Welding supplies

SBE PROGRAM OVERVIEW

Calculating Participation Values

  • SBE Trade Subcontractor

– Work performed or services provided by the SBE’s own work forces, including the cost of the materials and supplies – 100% – Work performed or services provided by the SBE’s own forces, including the cost of materials and supplies obtained for work, except for materials and supplies purchased or leased from Prime. If work has been subcontracted to another SBE, it will be counted as SBE participation by that other SBE.

  • SBE Materials Supplier

– Count 60% of the costs of the materials and supplies obtained from a SBE materials supplier. .

SBE PROGRAM OVERVIEW

slide-25
SLIDE 25

25

Calculating Participation Values

  • Pass Thru/Broker

– Count the entire amount of the fees or commissions charged for assistance in procuring or delivering materials and supplies when purchased from a SBE that is not a manufacturer or regular dealer. Do not count the cost of the materials and supplies. .

SBE PROGRAM OVERVIEW

Participation Strategy #1 Utilization of CUF Approved Suppliers

  • 60% Participation will be counted toward goal
  • If the SBE is only a Broker then only the fees/commission will be

counted

SBE PROGRAM OVERVIEW

slide-26
SLIDE 26

26

Participation Strategy #2 Multiple SBEs utilized for a specific Scope of Work

  • Welding
  • Freight/Hauling
  • Erection

SBE PROGRAM OVERVIEW

Participation Strategy #3 SBE supplies materials, fabricates and installs

100% Utilization is counted toward the goal SBE Furnish and Install a Portion Of The Work. Examples;

  • SBE Furnish and Install Steel Struts
  • SBE Furnish and Install Electrical Lighting Alternate

SBE PROGRAM OVERVIEW

slide-27
SLIDE 27

27 TG08.2 – Exterior Awning System

SBE PROGRAM OVERVIEW

Potential SBE Opportunity Roster

General Engineering Painting Miscellaneous Metals Structural Steel Welding Surveying Materials Inspection/Testing Materials Equipment Rental Supplies Trucking Site Clean Up

SBE PROGRAM OVERVIEW

slide-28
SLIDE 28

28

SBE PROGRAM OVERVIEW SBE PROGRAM OVERVIEW

slide-29
SLIDE 29

29

SBE PROGRAM OVERVIEW SBE PROGRAM OVERVIEW

slide-30
SLIDE 30

30

SBE PROGRAM OVERVIEW SBE PROGRAM OVERVIEW

slide-31
SLIDE 31

31

SBE PROGRAM OVERVIEW SBE PROGRAM OVERVIEW

slide-32
SLIDE 32

32

TRANSBAY TRANSIT CENTER TRADE PACKAGE

CHECKLIST & SUBMITTAL RECAP

Transbay Transit Center

TG08.2 Exterior Metal Awning System W-1

slide-33
SLIDE 33

33

Transbay Transit Center

TG08.2 Exterior Metal Awning Ssystem W-1

Remember to sign all Bid Forms!! All questions regarding the IFB will need to be submitted and answered through the QBD process. SBE Contacts to Sub Bidders Tables Thank You!