  1. TRANSBAY TRANSIT CENTER Transbay Transit Center TG07.2 Structural Concrete Superstructure Package Pre-Bid Conference Transbay Joint Powers Authority 201 Mission, Suite 2100 San Francisco, CA 10:00am November 14, 2013 Please sign in! Transbay Transit Center TG07.2 Structural Concrete Superstructure AGENDA • Welcome and Introductions • Trade Package Overview • SBE Participation Overview • Proposal Submittal Requirements • Questions and Answers • Meeting with Pre-Qualified Trade Subcontractors & Networking • Job Walk for Prime Bidders 1

  2. Transbay Transit Center TG07.2 Structural Concrete Superstructure Project General Information • Client: Transbay Joint Powers Authority (TJPA) • General Contractor: Webcor/Obayashi Joint Venture • Architect: Pelli Clark Pelli / Adamson • Structural Engineer: Thornton Tomasetti Transbay Transit Center TG07.2 Structural Concrete Superstructure Information and all IFB documentation is located on the TJPA website: www.transbaycenter.org > TJPA > Doing Business with the TJPA > Current Contract Opportunities > Structural Concrete Superstructure 2

  3. Transbay Transit Center TG07.2 Structural Concrete Superstructure Pre-Qualified Prime Trade Subcontractors • Gonsalves & Santucci dba Conco • RGW Construction • Shimmick Construction • Skanska Steel Constructors • Urata & Sons Cement Transbay Transit Center TG07.2 Structural Concrete Superstructure 3

  4. Transbay Transit Center TG07.2 Structural Concrete Superstructure Invitation For Bid (IFB) • Exhibit A with Scope of Work • Bid Manual with Attachments and Exhibits • Project Specifications & Drawings • Available at plan rooms shown on website Transbay Transit Center TG07.2 Structural Concrete Superstructure Bid Process – Timeframe and Dates • Qualifications Due: 2:00 pm Pacific Time on December 5, 2013 • Questions/Requests for Clarifications Due: 2:00 pm Pacific Time on December 6, 2013 Use the editable QBD form from TJPA website • Bid Packages Due: 2:00 pm Pacific Time on January 14, 2014 • TJPA Board Vote to Approve the Contract Award: Tentatively February 13, 2014 4

  5. Transbay Transit Center TG07.2 Structural Concrete Superstructure You are here! Transbay Transit Center TG07.2 Structural Concrete Superstructure TG07.2 Structural Concrete Superstructure 1. Reinforced concrete work above the delineation line with TG06 2. Grouting of all column base plates for Structural Steel columns 3. Pressure fill of basket columns and light column members 4. Pendulum bearings 5. Cut interior flange and 2” of web around the CDSM wall perimeter 5

  6. Transbay Transit Center TG07.2 Structural Concrete Superstructure TG07.2 Key Construction Items 1. Coordination with TG07.1R Structural Steel on superstructure 2. Reinforcement coordination at interface between steel girders and concrete moment frame beams at the ground level 3. Challenging placement of reinforced concrete beams/slabs under the 3 temporary bridges at First, Fremont and Beale Streets 4. Formwork for curved scallop walls at roof park level 5. Sketches showing future pedestrian bridges and gondola landing Transbay Transit Center TG07.2 Structural Concrete Superstructure 6

  7. Transbay Transit Center TG07.2 Structural Concrete Superstructure Transbay Transit Center TG07.2 Structural Concrete Superstructure 7

  8. Transbay Transit Center TG07.2 Structural Concrete Superstructure Transbay Transit Center TG07.2 Structural Concrete Superstructure 8

  9. Transbay Transit Center TG07.2 Structural Concrete Superstructure Transbay Transit Center TG07.2 Structural Concrete Superstructure 9

  10. Transbay Transit Center TG07.2 Structural Concrete Superstructure Transbay Transit Center TG07.2 Structural Concrete Superstructure 10

  11. Transbay Transit Center TG07.2 Structural Concrete Superstructure Transbay Transit Center TG07.2 Structural Concrete Superstructure 11

  12. Transbay Transit Center TG07.2 Structural Concrete Superstructure Transbay Transit Center TG07.2 Structural Concrete Superstructure 12

  13. Transbay Transit Center TG07.2 Structural Concrete Superstructure • TG07.2 IFB Set – Structural Drawings – Architectural Drawings – Specifications – Sketches showing future pedestrian bridge tie-in to adjacent buildings and gondola • ASI 108 – Steel member grout fill details – Clarifies the basket columns/light column steel pipe concrete/grout fill requirements Transbay Transit Center TG07.2 Structural Concrete Superstructure Questions on Bid Docs Submit ALL IFB Questions via editable QBD Form Email: TransbayBidding_TG07.2@webcor-obayashi.com Deadline: Friday, 12/06/2013, 2:00 pm 13

  14. Transbay Transit Center TG07.2 Structural Concrete Superstructure Transbay Transit Center TG07.2 Structural Concrete Superstructure How to Submit a Responsive Bid 1. Complete and include ALL forms! Bidding Checklist 2. Meet ALL Deadlines and Times! 3. Make sure your Proposal arrives by 2pm January 14, 2014! Webcor/Obayashi will use the clock at http://www.time.gov/timezone.cgi?Pacific/d/-8/java 14

  15. Transbay Transit Center TG07.2 Structural Concrete Superstructure Remember to sign all forms!! Questions? All questions regarding the IFB will need to be submitted and answered through the QBD process. Thank You! TRANSBAY TRANSIT CENTER SBE Program Overview TG07.2 Thursday, November 14, 2013 10:00am 15

  16. SBE PROGRAM OVERVIEW SBE Program Overview Agenda I. Overview of SBE Program II. Overview of SBE Goal for TG07.2 III. Participation Strategies to Meet the Goal IV. Step by Step Overview of EOI SBE PROGRAM OVERVIEW Certification & Certifying Agencies DBE SBE LBE 16

  17. SBE PROGRAM OVERVIEW Veteran Business & Workforce Participation SBE PROGRAM OVERVIEW SBE Project Participation Goal: 17% August 2012 Billings – Construction Only • 112 SBEs to date 17

  18. SBE PROGRAM OVERVIEW TG07.2 Structural Concrete Superstructure Trade Package 20% SBE Participation Goal Focus on “Trade Package Specific Information” • Includes SBE/DBE/LBE Certifications • Certification Assistance Provided By Program • Meets Commercially Useful Function Guidelines • Expression of Interest – Marketing Tool SBE PROGRAM OVERVIEW Building Relationships Pre-Qualified Trade Subcontractors • Gonsalves & Santucci dba Conco • RGW Construction • Shimmick Construction • Skanska Steel Constructors • Urata & Sons Cement 18

  19. SBE PROGRAM OVERVIEW Commercially Useful Function (CUF) A business performing a CUF is one that does all of the following: • Is responsible for the execution of a distinct element of the work of the contract. • Carries out its obligation by actually performing managing or supervising the work involved. • Performs work that is normal for its business, services and function. • Is not further subcontracting a portion of the work that is greater than that expected to be subcontracted by normal industry practices. SBE PROGRAM OVERVIEW CUF Evaluation TEST • Is the supplier (whether it is the prime or a subcontractor) responsible for the execution of a distinct element of the resulting contract? • Will the supplier actually be performing, managing, or supervising an element of the resulting contract? • Will the supplier be performing work that is normal for its business, services and function? • Is there further subcontracting that is greater than that expected to be subcontracted by normal industry practices ? 19

  20. SBE PROGRAM OVERVIEW North American Industry Classification System The NAICS Code – Materials/Equipment/Supplies (Examples) • 239910 Construction equipment rental • 532412 Welding equipment rental • 532490 Rental equipment • 423610 Construction materials/supplies • 423840 Welding supplies SBE PROGRAM OVERVIEW Calculating Participation Values • SBE Trade Subcontractor – Work performed or services provided by the SBE’s own work forces, including the cost of the materials and supplies – 100% – Work performed or services provided by the SBE’s own forces, including the cost of materials and supplies obtained for work, except for materials and supplies purchased or leased from Prime. If work has been subcontracted to another SBE, it will be counted as SBE participation by that other SBE. • SBE Materials Supplier – Count 60% of the costs of the materials and supplies obtained from a SBE materials supplier. . 20

  21. SBE PROGRAM OVERVIEW Calculating Participation Values • Pass Thru/Broker – Count the entire amount of the fees or commissions charged for assistance in procuring or delivering materials and supplies when purchased from a SBE that is not a manufacturer or regular dealer. Do not count the cost of the materials and supplies. . SBE PROGRAM OVERVIEW Participation Strategy #1 Utilization of CUF Approved Suppliers • 60% Participation will be counted toward goal • If the SBE is only a Broker then only the fees/commission will be counted 21

  22. SBE PROGRAM OVERVIEW Participation Strategy #2 Multiple SBEs utilized for a specific Scope of Work •Concrete Place and Finish •Concrete Pumping Services •Welding •Steel Cutting •Freight/Hauling SBE PROGRAM OVERVIEW Participation Strategy #3 SBE supplies materials, fabricates and installs 100% Utilization is counted toward the goal SBE Furnish and Install a Portion Of The Work. Examples; - SBE Concrete Place and Finish - SBE Concrete Pumping Services 22

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.